Conformed Copy of Price Schedule.pdf
PDF 120 KB Posted
- Attached to
- RECOVERY--Y--KIRWAN AND BERLIN PAVING
- Solicitation number
- W911WN09B0019
About this file
Conformed copy of price schedule. Bidders are requested to use this copy in preparation and submission of bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID RESULTS.pdf | ||
| 01 45 01.pdf | ||
| 01 22 00.00 10.pdf | ||
| W911WN-09-B-0019-0003.pdf | ||
| W911WN-09-B-0019-0002.pdf | ||
| OH080002.pdf | ||
| W911WN-09-B-0019-0001.pdf | ||
| W911WN-09-B-0019-0001MJK.zip | ZIP file | |
| BER.zip | ZIP file | |
| 01 57 23.00 10.pdf | ||
| 01 57 20.00 10.pdf | ||
| Berlin Kirwan Site Visit Attendees.doc | DOC document | |
| OH080002.doc | DOC document | |
| W911WN-09-B-0019.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ARRA Funded Items- Berlin Lake
FFP
This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0001AA - 0001AH) only.
FOB: Destination
PURCHASE REQUEST NUMBER: W81ET491766288
NET AMT
0001AA 1 Lump Sum ARRA - Reimbursement for Actual
FFP
Performance and Payment Bonds Premium, Berlin Lake (See Section 00800 Paragraph 52.228-4000)
0001AB 1 Lump Sum ARRA - Project Sign
FFP
0001AC 4 Set ARRA - Digital Progress Images
0001AD 21 Short Ton ARRA - Scratch Coat
FFP
Boat Launch Parking Lot and Access Road
0001AE 5,200 Square
Yard
ARRA - Pave Boat Launch
Parking Lot and Access Road
0001AF 6,550 Square
ARRA - Pave Day Use Area
Parking Lot and Access Roads
0001AG 1 Lump Sum ARRA - Remove and Reinstall
FFP
Parking Bumpers
0001AH 1 Lump Sum ARRA - Paint Parking Lines and Graphics
Non ARRA Funded Items - Berlin Lake
FFP
This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0002AA - 0002AH) only.
0002AA 1 Lump Sum Reimbursement for Actual Performance
FFP
and Payment Bonds Premium, Berlin Lake (See Section 52.228-4000)
0002AB 7,300 Square
Construct New Parking Lot
Asphalt Concrete Pavement and Aggregate Base Course
0002AC 345 Linear
Foot
Culvert, 27-Inch HDPE
0002AD 570 Linear
Foot
Pipe Underdrain
0002AE 2 Each Slopewalls
0002AF 28 Each Furnish and Install Parking Bumpers
0002AG 1 Lump Sum Paint Parking Lines and Graphics
0002AH 11,000 Cubic
Construct New Parking Lot
Compacted Fill
ARRA - Paving Roads and Parking Areas
FFP
Michael J. Kirwan Dam. This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0003AA - 0003AF) only.
0003AA 1 Lump Sum ARRA - Reimbursement for Actual
FFP
Performance and Payment Bonds Premium, Michael J. Kirwan Dam (See Section 00800 Paragraph 52.228-4000)
0003AB 1 Lump Sum ARRA - Project Sign
0003AC 4 Set ARRA - Digital Progress Images
0003AD 210 Square
ARRA - Entrance Reconstruction
0003AE 18,700 Square
ARRA - Pave Access and Dam Roads
0003AF 1 Lump Sum ARRA - Remove and Reinstall Parking
FFP
Bumpers and Concrete Blocks
Additional Pavement
FFP
Michael J. Kirwan Dam. This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0004AA - 0004AD) only.
0004AA 1 Lump Sum Reimbursement for Actual Performance and
FFP
Payment Bonds Premium (See Section 00800 Paragraph 52.228-4000)
0004AB 2,200 Square
Pave Maintenance Road and Parking Area
0004AC 75 Square
Reconstruct Maintenance Yard Area
0004AD 10 Short Ton Scratch Coat, Road and Parking Area
TOTALS
Total, ARRA Funded Items - Berlin Lake, Items 0001AA-0001AH $__________________________
Total , Non-ARRA Funded Items - Berlin Lake, Items 0002AA-0002AH $________________________
Total, ARRA, Paving Roads and Parking Areas, Items 0003AA-0003AF $________________________
Total, Additional Pavement, Items 0004AA – 0004AD $_______________________
Total, Berlin Lake & M.J. Kirwan Pave Roads and Parking Area, ITEMS 0001AA – 0004AD, INCLUSIVE $____________________________
Do not round off totals, in case of a variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a prorata basis to every unit price in the bid schedule.