Amendment 0001 to Solicitation W911WN-09-B-0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID RESULTS.pdf | ||
| 01 45 01.pdf | ||
| 01 22 00.00 10.pdf | ||
| Conformed Copy of Price Schedule.pdf | ||
| W911WN-09-B-0019-0003.pdf | ||
| W911WN-09-B-0019-0002.pdf | ||
| OH080002.pdf | ||
| W911WN-09-B-0019-0001MJK.zip | ZIP file | |
| BER.zip | ZIP file | |
| 01 57 23.00 10.pdf | ||
| 01 57 20.00 10.pdf | ||
| Berlin Kirwan Site Visit Attendees.doc | DOC document | |
| OH080002.doc | DOC document | |
| W911WN-09-B-0019.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
W81ET491766288
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
This amendment is being issued to:
1. Revise the plans and specifications as indicated on the Summary of Changes of this amendment
2. Provide answ ers to questions received
3. Incorporate the current Wage Determination, General Decision Number OH080002, dated 8/7/09
4. Revise the specified period of performance.
5. Delete FAR Clause 52.211-10
6. Add FAR Clause 52.211-10 Alternate I
7. Extend the date and time specified for receipt of offers to 1:00 pm on August 26, 2009.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0019
X 9B. DATED (SEE ITEM 11)
23-Jul-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2009
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911WN
FACILITY CODECODE
EMAIL:TEL:
W911WN-09-B-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
SPECIFICATIONS
The following specification sections have been revised and are attached to this amendment:
SECTION 01 57 20.00 10
SECTION 01 57 23.00 10
PLANS
The following drawings have been revised and are attached to this amendment. The revised drawings are indicated by an “A” designator. For example Drawing C-319 is now C-319A.
C-319
G-005
G-106
G-107
C-308
G-115
G-116
QUESTIONS & ANSWERS
The following questions were received and responses are provided:
For Both Sites
Q1. Are there erosion control measures that need to be included in the bid for either site?
A1. Erosion control measures were not designed by the Army Corps of Engineers for this project. The phrase, “as indicated on the drawings” has be removed from SECTION 01 57 20.00 10, 3.2.3 Erosion and Sediment Controls.
This will require the contractor to design and use temporary or permanent Best Management Practices (BMP’s) in order to control erosion and sediment. It should be noted that the contractor will be required to submit a formal Erosion and Sediment Control plan that follows SECTION 01 57 23.00 10, 1.4.1 Erosion and Sediment Control Plan.
Q2. Currently, only the Kirwan drawing set shows butt joints at all asphalt/concrete interfaces. Are butt joints required at all asphalt/concrete interfaces for both sites?
A2. Yes, butt joints will be required for all asphalt/concrete interfaces on both projects. A detail has been placed in the Berlin drawing set.
Q3. Is this project expected to be completed this season? Does the Corps of Engineers forsee any delays? By the time the contract is awarded, we may be getting into bad weather.
A3. The performance period is revised. See FAR Clause 52.211-10 Alternate I for revisd performance period end dates.
For Berlin
Q4. The boat launch item on page 5 of 68 in the solicitation states Pave Boat Launch Parking Lot and Access Road, but plan page G-107 shows just overlay of parking lot. Is the access road intended to have an overlay?
A4. Only the parking lot is to receive overlay, as shown on G-107.
Q5. Sheet G-107, Note 3C states 9,830 SY for construction of asphalt overflow parking lot, but bid sheet page 7 of 68 in the solicitation show 7,300 SY. Measurements indicate that the 7,300 is correct, but please clarify.
A5. 7,300 SY is the correct quantity. The note on the drawings is in error and has been removed from Sheet G-107.
Q6. Is there any detail on the underdrain ditch dimensions and stone bedding and backfill required? Also, is there any detail for the 27” HDPE ditch, bedding and backfill?
A6. The underdrain ditch will be 1’-3” wide at least 1’ below the bottom of the aggregate base. The bedding stone will be #57’s with the bottom 2” to be tamped. The ditch walls and floor should be covered with a geotextile filter fabric.
The drainage pipe has been changed to 30”. The 30” HDPE pipe trench will be 56” wide. The bedding stone will be #57’s with the bottom 6” to be tamped. The trench walls and floor should be covered with a geotextile filter fabric.
A detail has been added to the drawing C-319.
Q7. Is there any work to be done on the boat ramp?
A7. There is no work to be done on the boat ramp.
Q8. Are there any repairs?
A8. There is an area of the Boat Launch Parking Lot that will require a scratch coat prior to overlay as shown on Drawing G-107.
Q9. Are the parking blocks to be replaced?
A9. The parking blocks are to be removed during the overlay process and then set back in place once the overlay has been completed as shown on Drawing G-106.
Q10. Should contractors stay with the Corps of Engineers handicapped standards?
A10. The Army Corps of Engineers, being a federal facility, falls under the ABA (Architectural Barriers Act) regarding handicapped standards.
For Kirwan
Q11. Sheet G-116 typical section for asphalt overlay shows 4’ seeded shoulders, but much of the service road has the stone ditch on one side. Is that just to be left as is? Is any stone required to be placed on shoulder of dam road or service road where stone currently exists?
A11. The intent of the 4’ seeded shoulder is to provide a smooth transition from the road surface to the surrounding ground. In the areas where no transition is needed, as example beside the stone ditch, no seeded shoulder is required.
Q12. Plan page G-116 shows geotextile on top of the aggregate base.&n bsp; Is that the intent?
A12. The intent of the geotextile is to promote durability of the pavement section. The geotextile should be on top of the sub-grade and not the aggregate base as currently shown. Sheet G-116 has been revised.
Q13. The bid quantity for Entrance Reconstruction on page 11 of 68 in the solicitation shows a quantity of 1,710 SY. That seems very high. Please verify.
A13. 1,710 SY is the correct quantity for the Entrance Recontstruction.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 24-Aug-2009 03:00 PM to 26-Aug-2009 01:00 PM.
The description of performance 52.211-10 AltI has been added.
The contractor period of performance end date has increased by 120 days from 120 days to 240 days.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under Items 0001, 0003 and 0004 of this contract within ten
(10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than November 01, 2009.
The Contractor shall be required to (a) commence work under Item 0002 of this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calendar days after the date or receipt of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
The completion dates are based on the assumption that the successful offeror will receive the notice to proceed by September 30, 2009. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of Clause)
(End of clause)
The following have been deleted:
52.211-10 Commencement, Prosecution, and Completion of Work APR 1984
(End of Summary of Changes)