This document is a Request for Information (RFI) for leasing temporary HVAC units through a Blanket Purchase Agreement (BPA). The government seeks to establish a BPA with multiple vendors for temporary HVAC cooling units ranging from 3-80 Ton, with the ability to respond to at least ten buildings during summer months. Key details include site-specific requirements where vendors will conduct site visits to determine building layout, power needs, and installation specifics. The anticipated lease duration will typically be longer than 30 days, with surge cooling requirements during spring and summer months.
Pricing will be structured with daily fees for HVAC units and separate fees for installation and removal, following the Contract Line Item Number (CLIN) structure in the solicitation. Vendors are required to provide their own inventory list of HVAC cooling units and price estimates for various unit sizes. The government expects to award the BPA to multiple vendors based on technical capability, competitive pricing, and past performance, with no set limit on the number of companies that can be included. This is a new initiative with no current incumbent contractor, and site visits will be conducted for every call to ensure precise matching of HVAC unit requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BPA Lease of Temporary HVAC Units PWS v2.pdf | ||
| Solicitation - W911SG25QA063.pdf | ||
| BPA Lease of Temporary HVAC Units PWS v2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFIs Lease Temporary HVAC Units – BPA
1. Can the Government provide historical usage data or anticipated annual demand by unit size (e.g., 3–10 ton, 20–40 ton, 60–80 ton) to help offerors align inventory and pricing strategies? Most likely 10-80 Ton sized units will be requested, with the ability to respond to a minimum of ten buildings during summer months.
2. Does the Government have site-specific preferences for certain types of equipment (e.g., trailer-mounted chillers for larger facilities, portable ACs for modular buildings), or will any compliant unit type be considered equally acceptable? No, facility dependent and upon space availability. Will complete a site visit prior to vendor estimate.
3. For locations requiring external power, does the Government anticipate providing generators as Government-furnished equipment, or should contractors plan to propose optional generator support solutions within their pricing? No, contractors will have two options to use existing power sources; building supplied power or contractor provided generators. This is site specific, which will be surveyed upon issuance of the Call where a site visit will inform planning prior to the contractor’s quote.
4. Can the Government provide anticipated lease durations for BPA calls (e.g., on average of a few days for emergencies versus several weeks or months for seasonal support) to allow contractors to propose more accurate daily and long-term pricing? Typically, the requirement duration will be longer than 30 days (months) with surge cooling requirements during the spring and summer months.
The expected duration will be provided for each Call.
5. Installation of the units: We can hook up on our end (A/C unit) lay the cable in cable ramps up to the electrical box. We are not certified electricians, I can get a 3rd party to Electrical contractor to assist with this. will include his fees in my quote or will you take care of the electrical hook up? Yes, proposals must include complete installation, operation, and removal of the HVAC cooling units. This includes electrical, ductwork, etc. to ensure fully operational cooling systems.
6. How many units are you looking for to quote out? Is there a way I can do a jobsite walk to look at breakers and advise on best possible cable run and duct run? Yes, due to the nature of this BPA, site visits will be conducted for every call to determine building layout, size, design, power, and ancillary material requirements. An opportunity to ask site specific questions will also be provided.
7. Could you please clarify whether this requirement represents a new initiative or a continuation of an existing project? New initiative.
8. Is there a current incumbent contractor providing rental HVAC services under a prior agreement? No.
9. Were all option years exercised under the current or previous contract? This is the first establishment of a Blanket Purchase Agreement (BPA) for the lease of Temporary HVAC units.
10. The General Instructions state that the Government intends to establish a BPA with multiple companies under this solicitation. Could you confirm how many awards are anticipated? Multiple vendors are expected to be established under this BPA according to technical capability, competitive pricing, and past performance. There is no limit to the number of companies that can be included in this BPA if the selection criteria are satisfactory.
11. Is there a particular way or format you would like the pricing to be done? Price the units in the range of 3-80 Ton based on a daily fee and a separate fee for installation and removal per the CLINS listed on the solicitation.
12. Is there an “Inventory list of HVAC cooling systems for pricing as a guideline for reference? Or is that something the government is expecting the offeror to create? Vendor should provide their inventory list of HVAC cooling units in the range of 3-80 Ton.
13. In the Solicitation on page 15 under "Addendum to 52.212-1, Instructions to
Offerors" it said the offeror shall submit “Market pricing of HVAC cooling systems available (Range of 3 Ton to 80 Ton)”. Does that mean that the contractor is submitting pricing for the range of 3 Ton, 5 Ton, 10 Ton, 15 Ton, 20 Ton, 30 Ton, 40 Ton, 60 Ton, 80 Ton? Please advise. Yes, vendors shall provide estimates for HVAC cooling units in the range of 3-80 Ton based on a daily fee. The installation and removal are separate fees. Please refer to the CLIN structure for the pricing format.