ATTACH_B_DI-MGMT-81945.pdf

Data Item Description PDF 87 KB Posted

Attached to
Aviation Maintenance Management
Solicitation number
w911sf19r0011
Issued by

About this file

Attachment B 10 of 16

View the file

Other versions and copies of DI-MGMT-81945

Who attaches DI-MGMT-81945

Other files

File Type Posted
A041_Facilities_Survey_amend_1.pdf PDF
Attachment_J_-_2018_Baseline_Data_CNRW_Waste_Turn-Ins.xlsx XLSX spreadsheet
A036_Training_Plan_amend_1.pdf PDF
A020_Facilities_Engineering_Work_Request_Log_for_Work_Orders_amend_1.pdf PDF
amendment_1,_solicitation_W911SF19R0011_22_may_19.pdf PDF
Attachment_8_CSI_CC_WP_3723_amend_1.pdf PDF
ATTACHMENT_11_PRICING_SUPPORT_FOR_MATERIAL_AND_TRAVEL_CLINS_ADDED_BY_AMENDMENT_1.docx DOCX document
A046_Accident-Incident_Notification_and_Reporting_amend_1.pdf PDF
attachment_12_-_material_authorizations_in_shop_sequence_-_W90V66AUL_050118_amend_1.pdf PDF
A040_Reporting_CAP_amend_1.PDF PDF
A043_Quality_Management_Plan_amend_1.pdf PDF
attachment_10__tc3_04x7_2010_amend_1.pdf PDF
A044_Safety_Program_Plan_amend_1.pdf PDF
A027_v1_Pollution_Prevention,_Waste_Reduction_Program_amend_1.pdf PDF
A026_Site_Specific_Spill_Prevention_Plans,_Reports,_and_Inspections_amend_1.pdf PDF
A049_Contractor_Accident_Incident_Report_amend_1.pdf PDF
attachment_E_-_RFC_052019_amend_1.pdf PDF
A047_Estimated_Cost_of_Damage_(ECOD)_Actual_Cost_of_Damage_(ACOD)_Report_amend_1.pdf PDF
attachment_H_-_AAD_052019_amend_1.pdf PDF
A029_Automation_Life_Cycle_and_Management_Report_amend_1.pdf PDF
A039_Periodic_Inventory_of_GFP_amend_1.PDF PDF
A035_Continuity_of_Operations_Plan_(COOP)_amend_1.pdf PDF
A021_Local_Purchase_amend_1.pdf PDF
A031_Security_Program_Plan_amend_1.pdf PDF
Attachment__9_Estimated_Labor_Summary_amend_1.pdf PDF
A025_Hazardous_Material_Management_Plan_and_Reports_amend_1.pdf PDF
A023_Environmental_Compliance_Report_amend_1.pdf PDF
A030_Troubleshooting_and_Repair_Report_amend_1.pdf PDF
A048_OPSEC_Plan_amend_1.pdf PDF
A024_Air_Compliance_Reporting_amend_1.pdf PDF
A032_Training_Completion_Report_amend_1.pdf PDF
A022_Environmental_Management_System_Reports_amend_1.pdf PDF
A045_Aviation_Accident_Prevention_Survey_(AAPS)_amend_1.pdf PDF
ATTACHMENT_7_PRICING_SUPPORT_FOR_CLIN_0001_AND_3_ADDITIONAL_HELICOPTERS_revised_by_amendment_1.docx DOCX document
A028_Energy_and_Utilities_Conservation_Plan_amend_1.pdf PDF
A033_Personnel_Roster_amend_1.pdf PDF
A038_Appointment_of_Contractor_Property_Manager_amend_1.pdf PDF
A034_Phase-Out_Plan_amend_1.pdf PDF
A037_Industrial_Hygiene_Survey_Test_Evaluation__Assessments_amend_1.pdf PDF
ATTACH_A_-_DELIVERABLES_A019_ENVIROMENTAL_COMPLIANCE_DESIGNEE.pdf PDF
ATTACHMENT_4_-_OVER_AND_ABOVE_WORK_HISTORICAL_DATA.pdf PDF
ATTACH_A_DELIVERABLES_-_A004_NON_MISSION_CAPABLE_MAINTENANCE.pdf PDF
ATTACH_B_DI-ILSS-80415.pdf PDF
ATTACH_A__-_DELIVERABLES_A012_CER_CFTL.pdf PDF
attachment_1_GFP_sn_061118.pdf PDF
ATTACH_A_-_DELIVERABLES_A015_REVIEW_AND_ANALYSIS_MATERIALS.pdf PDF
attachment_2_GFP_AS-IS_061118.pdf PDF
ATTACH_A_-_DELIVERABLES_A007_TRENDING_INFORMATION_QUARTERLY_REPORT.pdf PDF
attachment_3_wage_determination_WD_15-4527_rev_10.pdf PDF
ATTACH_A_-_DELIVERABLES_A017_FLIGHT_AND__GROUND_OPERATIONS.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Phase-Out Transition Plan Number: DI-MGMT-81945 Approval Date: 20130916 AMSC Number: N9430 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: AS/PMA-207 Applicable Forms: N/A Use/relationship:

The Phase-Out Transition Plan provides a detailed description of the transfer of full assumption of duties at each site to the follow-on contractor.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS). It should be tailored to the minimum data requirements of the applicable contract or purchase order.

Requirements:

1. Format. Contractor format is acceptable.

2. Content. The Phase-Out Transition Plan shall include:

a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.

b. Details of accounts and subscription services to be terminated or transferred.

c. Process to conduct a full joint inventory and transference of all Government

Furnished Material inventory including all records.

d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.

e. Details for the removal of all contractor owned items.

f. Critical path schedule for risk mitigation of the transition period.

g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.

3. End of DI-MGMT-81945.

Source: https://assist.dla.mil -- Downloaded: 2014-05-20T19:15Z Check the source to verify that this is the current version before use.

Downloaded from http://www.everyspec.com

File details come from the government source that posted it.