PAN 038049 W911SD-26-Q-A044 SOLICITATION AMEND 0001 DRAFT RFI BATCH 3 DAS Modernization Phs 1.pdf
PDF 4 MB Posted
- Solicitation number
- W911SD-26-Q-A044
About this file
This document is a Standard Form 30 Amendment to a federal solicitation (W911SD26QA0440001) issued by the US Army West Point Contracting Office, effective April 23, 2026, for a 5G Distributed Antenna System (DAS) upgrade at the United States Military Academy.
The amendment posts RFI (Request for Information) responses from three batches, with Batch #3 containing answers to five key questions regarding submission requirements. The government confirmed that offerors may consolidate all four digital proposal volumes onto a single CD-ROM with clearly labeled folders, that cover pages and tables of contents are excluded from page limitations, that readers should reference Table 3 spectrum requirements in the attached Performance Work Statement (PWS), that a past performance questionnaire will be uploaded to SAM.gov, and that quoters should only quote what is requested in the solicitation. The underlying Performance Work Statement describes a non-personal services contract requiring the contractor to provide complete upgrade and replacement of existing DAS components in three buildings at West Point (Building 758 Jefferson Hall Library as the primary facility, with two optional buildings contingent on funding). The contractor must perform RF propagation studies, remove obsolete 4G-only DAS equipment, install new Advanced RF Technologies (ADRF) equipment supporting 5G capability for AT&T, T-Mobile, and Verizon, and deliver as-built drawings and performance certifications meeting specified RSRP and SINR requirements. The contract is Firm Fixed Price with a 180-day period of performance and includes six optional tasks for redundant power systems and passive equipment replacement. Key deliverables include a work plan (10 days post-award), Quality Control Plan (10 days), key personnel identification (5 days), and closeout documentation (15 days post-completion), with performance thresholds for cable testing, system certification, and coordination of service outages with the CIO/G6 Network Service Branch.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Continuation of Description
Miscellaneous text in this section has been modified to:
RFI Questions and Answers
RFI BATCH # 1- In queue for answering
RFI BATCH # 2- In queue for answering
RFI BATCH # 3- Answered Amend 0001-
RFI BATCH # 3 (AMEND 0001)
1. L.6.1.3, Table 2 - Page Limitations, pg. 64
Table 2 specifies that one (1) CD ROM is required for the digital submission of each volume (Volumes I-IV). Would the Government consider allowing offerors to consolidate all four digital volumes onto a single CD ROM, with each volume clearly labeled in separate folders, rather than requiring four individual CD ROMs?
Answer: 1 CD ROM is acceptable, and One (1) binder is also acceptable so long as the digital copy is on a CD ROM
2. L.6.1.3, Table 2 - Page Limitations, pg. 64
Will the Government please confirm that cover pages, and tables of contents are excluded from the page limitations for the technical and past performance volume?
Answer: That's fine
3. Reference: Solicitation page 12/69; paragraph C2.1.3
W911SD26QA0440001
"The following Spectrum Requirements support the objective of this requirement. Table 3 Spectrum Requirements (end of paragraph)"
Question: Table 3 does not appear in the Solicitation; however, there is a Table 3 with frequencies in the PWS. Should the reader refer to Table 3 on page 8/68 in the PWS?
Answer: It is the offeror's responsibility to review all attached documents posted in the SAM.gov solicitation
4. Reference: Solicitation 64/69; Page limitations in Table 2
Page Limit for Volume III, Past Performance, is "20 (does not include questionnaire responses)"
Question: Could the Government provide additional information about the desired questionnaires?
Answer: Will upload past performance questionnaire into SAM
5. Reference: RFQ page 9/69, paragraph C1.9, Contractor Travel
"Reserved"
Question: Will the Government permit quoters to include the cost of travel within the terms of its GSA Contract and the Joint Travel Regulation?
Answer: Only quote what is requested in the solicitation
Past Performance Questionnaire See below
Performance Assessment Questionnaire - Cover Letter
SUBJECT: Offeror Past Performance Assessment in Support of Request for Quote (RFQ)
W911SD-26-Q-A044
Dear Sir/Ma'am, The US Army West Point Contracting Office is currently conducting a competitive source selection to evaluate offerors on the subject RFP. As part of this evaluation, we have requested that the offerors provide information about their past performance on same or similar federal, state, or local government or commercial contracts. You have been identified as the point of contact cited on the enclosure.
Your assessment of their performance is extremely valuable to our evaluation. Please complete the enclosure and return to the:
US Army
United State Military Academy (USMA)
681 Roger Place Suite 100
West Point, New York 10996
(insert Contracting Office and address), no later than 15 days after receipt of request or (insert date), whichever occurs first. Submit your completed questionnaire to ignacio.j.cordova2.civ@army.
mil.
Your cooperation is greatly appreciated.
Performance Assessment Questionnaire
Please provide your candid responses. The information that you provide will be used in the awarding of federal contracts. Therefore, it is important that your information be as factual, accurate and complete as possible to preclude the need for follow-up by the evaluators. If you do not have knowledge of or experience with the company in question, please forward this Questionnaire to the person who does (and/or) notify the Contracting Officer. Please return the completed Questionnaire to the Contracting Officer identified in the cover letter within the stated timeframe.
Rating Definitions:
Substantial Confidence: Performance meets contractual requirements and exceeds many requirements that benefit the end user. Work was accomplished with few, if any, minor problems for which corrective actions taken by the contractor were highly effective. The offeror has been highly successfully in performing the required effort.
Satisfactory Confidence: Performance meets contractual requirements and exceeds some requirements that benefit the end user. Work was accomplished with some minor problems for which corrective actions taken by the contractor were effective. The offeror has successfully performed the required effort.
Limited Confidence: Performance does not meet some contractual requirements. Serious problems with contractor performance were experienced for which the contractor has either not yet identified corrective actions or the corrective actions taken appear only marginally effective. The offeror has had little success performing the required effort.
No Confidence: Performance does not meet most contractual requirements. Serious problems with contractor performance were experienced for which the corrective actions were ineffective. The offeror has not successfully performed the required effort.
PART I. (To be completed by the Offeror)
A. CONTRACT IDENTIFICATION
Contractor/Company Name/Division:
Address:
Program Identification/Title:
Contract Number:
Contract Type:
Prime Contractor Name (if different from the contractor name cited above):
Contract Award Date:
Forecasted or Actual Contract Completion Date:
Nature of the Contractual Effort or Items Purchased:
Total Contract Value:
B. IDENTIFICATION OF OFFEROR'S REPRESENTATIVE
Name:
Title:
Date:
Telephone Number:
Address:
E-mail Address:
PART II. EVALUATION (To be completed by Point of Contact - Respondent)
*Note: rationale is required for each response.
A. Compliance of Products, Services, Documents, and Related Deliverables to Specification Requirements and Standards of Good Workmanship
Substantial Confidence
Satisfactory Confidence
Limited Confidence
No Confidence
Rationale: _________________________________________________________
B. Effectiveness of Project Management (to include use and control of subcontractors).
Substantial Confidence
Satisfactory Confidence
Limited Confidence
No Confidence
Rationale: __________________________________________________________
C. Timeliness of Performance for Services and Product Deliverables.
Substantial Confidence
Satisfactory Confidence
Limited Confidence
No Confidence
Rationale: __________________________________________________________
D. Effectiveness in Forecasting and Controlling Estimated Costs (Use this Question on Cost Reimbursement Type Contracts Only).
Substantial Confidence
Satisfactory Confidence
Limited Confidence
No Confidence
Rationale: __________________________________________________________
E. Commitment to Customer Satisfaction and Business-like Concern for its Customers' Interest
Substantial Confidence
Satisfactory Confidence
Limited Confidence
No Confidence
Rationale: __________________________________________________________
F. General Comments. Provide any other relevant performance information.
Comments: _________________________________________________________
G. Other Information Sources. Please provide the following information:
Are you aware of other relevant past efforts by this company?
If yes, please provide the name and telephone number of a point of contact:
Point of Contact (Name): __________________________________________
Telephone Number: ______________________________________________
H. Respondent Identification. Please provide the following information:
Organization:
Name:
Title:
Date:
Telephone Number
Address:
E-mail Address:
PART III. RETURN INFORMATION
Please return this completed Questionnaire to the Contracting Officer identified in the cover letter.
Thank you for your assistance.
Section C
PWS
GENERAL INFORMATION
C1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract's terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
C1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide the upgrade and renovation of existing commercial cellular Distributed Antenna Systems(DAS) components and equipment that are at end of life technology, and replace them with current 5g capability. The contractor shall provide all labor, equipment and consumables to upgrade capability in support of providing modern capabilities to the Cadet, Staff and Faculty of the United States Military Academy (USMA), Westpoint, New York.
C1.2 Background: The Chief Information Officer, G6(CIO/G6) has identified the need to upgrade the existing cellular distribution systems within key buildings due to the inability to support modern fifth-generation mobile network(5G) enhancements offered by the core carriers. AT&T, T-Mobile, and VERIZON, currently provide signals to the academy to enable cellular service to all Cadet, Faculty and Staff cellular phone subscribers. The carrier signals are distributed within the Academic buildings through a Distributed Antenna System (DAS) installed within each building.
These systems ensure that the cellular service signals are maintained within the buildings since outside antenna signals cannot penetrate walls and indoor barriers. These systems directly support life, safety, and administrative communications.
C1.2.1 The CIO/G6 has identified that the current equipment cannot support new and emerging capabilities of 5G cellular technology since the existing equipment was installed and manufactured before 5G was developed. Currently, the equipment can only support 4G LTE. The enhancement of the equipment to support 5G will provide all mobile subscribers with the following capabilities:
a. Faster Speeds. This enables high-quality streaming, fast downloads, and smooth video conferencing.
b. Greater Capacity. Supports more devices per square mile, ideal for densely populated areas and numerous devices that utilize cellular for internet services- IoT (Internet of Things) deployments.
c. Improved Reliability. Enhanced network stability and better coverage.
C1.3 Scope: The Contractor shall provide non-personal service(s), to Engineer the removal and replacement of existing Distributed Antenna infrastructure and components that are unable to support 5G signal capability to new and emerging cellular technologies. All major equipment provided shall be standardized and be manufactured by Advanced RF Technologies (ADRF). This PWS provides for the upgrade of 3 separate facilities 1 primary, and 2 optional buildings, contingent upon funding.
C1.3.1 The contractor will be required to provide a RF Propagation plot, a.ka. "Heat Map" of all facilities to develop a design plan for antenna and component installations.
C1.3.2 Building 758, Jefferson Hall Library. The contractor will perform a preliminary RF Propagation study to be used within the engineering design. The contractor shall remove and replace all active components, passive components, cables, and antennas and replace the system in its entirety to provide for the capability of 5G cellular technology. All new active components will be installed using the existing racks/spaces vacated by the removed systems.
a. The contractor shall be responsible for the disposition of all removed equipment and materials no longer required under 1.3.1
b. The contractor shall install new cable, passive and active equipment to provide for a 100% upgrade to 5G capability, supporting ATT, T-Mobile, Verizon signal distribution within the facility.
c. The contractor shall be responsible for coordination of interruption of services with the CIO/G6 Network Service Branch, DAS Maintenance contractor, and if required the major carrier's.
d. The contractor shall test and certify that the system's performance meets or exceed specified performance levels and provide results to the CIO/G6 Network Service Branch.
e. The contractor shall develop and provide "As Built "drawings which identify locations and inventory of all antenna's, cable routes, and telecom equipment. All drawings and sketches developed under this PWS shall become the property of the CIO/G6 upon final draft at the completion of this project
C1.3.3 OPTION 1. Redundant Power. Building 758, Jefferson Hall Library. Contingent upon funding, the contractor shall provide a back-up power system to all active DAS equipment capable of a 2hour emergency power in the event of an electrical outage.
C1.3.4 OPTION 2. General Instructional Building (GIB). This facility is adjacent to the Jefferson Hall Library and serves as a temporary class and administrative area for displaced academic and staff functions during the academies multiyear Academic Building Upgrade Program (ABUP).
Contingent upon funding, the contractor shall provide the following:
a. The contractor shall perform an RF Propagation study to design the effective placement of antennas and infrastructure.
b. The contractor shall be responsible for the disposition of all removed equipment and materials no longer required under 1.3.3
c. The contractor shall install new cable, passive and active equipment to provide for a 100% upgrade to 5G capability, supporting AT&T, T-Mobile, Verizon signal distribution within the facility.
d. The contractor shall be responsible for coordination of interruption of services with the CIO/G6 Network Service Branch, DAS Maintenance contractor, and if required the major carriers.
e. The contractor shall test and certify that the system's performance meets or exceed specified performance levels and provide results to the CIO/G6 Network Service Branch.
f. The contractor shall develop and provide "As Built "drawings which identify locations and inventory of all antenna's, cable routes, and telecom equipment. All drawings and sketches developed under this PWS shall become the property of the CIO/G6 upon final draft at the completion of this project.
C1.3.5. OPTION 3. General Instructional Building (GIB). Contingent upon funding. The contractor shall provide and install redundant power to all active DAS components installed within 1.3.3.
C1.3.6. OPTION 4. Building 752, Mahan Hall. Contingent upon funding, the contractor shall remove all active DAS equipment and replace the components with newly manufactured Advanced RF Technologies (ADRF) equipment. The equipment shall provide 5G signaling throughout the existing infrastructure. Under this option, all passive components shall remain pending funding for replacement.
a. The contractor shall be responsible for the disposition of all replaced equipment
b. The contractor shall coordinate service outages with the CIO/G6 Network Service Branch.
c. The contractor shall test and certify that the system's performance meets or exceed specified performance levels and provide results to the CIO/G6 Network Service Branch.
d. The contractor shall ensure that the system provides for a 100% upgrade to 5G capability, supporting AT&T, T-Mobile, Verizon signal distribution within the facility.
e. The contractor shall be responsible for coordination of interruption of services with the CIO/G6 Network Service Branch, DAS Maintenance contractor, and if required the major carrier's.
f. The contractor shall develop and provide "As Built "drawings which identify locations and inventory of all telecom equipment and rack elevations. All drawings and sketches developed under this PWS shall become the property of the CIO/G6 upon final draft at the completion of this project.
C1.3.7. OPTION 5. Building 752, Mahan Hall. Contingent upon funding, the contractor shall provide and install Redundant Power to all active DAS Components installed under 1.3.4.
C1.3.8 OPTION 6. Building 752, Mahan Hall. Contingent upon funding, the contractor shall remove and replace all passive equipment, including cabling, and antennas and replace the DAS Infrastructure in its entirety.
a. The contractor shall perform an RF Propagation Study for the efficient placement of antennas and passive components.
b. The contractor is responsible for the disposition of all cabling and components removed under this option.
c. The contractor shall be responsible for coordination of interruption of services with the CIO/G6 Network Service Branch, DAS Maintenance contractor, and if required the major carriers.
d. The contractor shall install newly manufactured material and components that are rated for cellular 5G performance.
e. The contractor shall test and certify that the system's performance meets or exceed specified performance levels and provide results to the CIO/G6 Network Service Branch.
f. The contractor shall ensure that the system provides for a 100% upgrade to 5G capability, supporting AT&T, T-Mobile, Verizon signal distribution within the facility.
g. The contractor shall develop and provide "As Built "drawings which identify locations and inventory of all antenna's, cable routes, and telecom equipment. All drawings and sketches developed under this PWS shall become the property of the CIO/G6 upon final draft at the completion of this project.
C1.4 Objectives: The objective of this contract is to provide:
a. Removal of equipment which cannot support 5G cellular services.
b. Install new ADRF DAS Systems which will provide 100% coverage and 5g signal capability for all major cellular carriers within the building(s).
c. Upgrade DAS Infrastructure to include cable, antennas and associated components to enhance 5G performance, based upon RF Propagation studies.
1.5 Type of Contract: FIRM FIXED PRICE
1.6 Period of Performance: 180 Days from award of contract.
1.7 Place of Performance: The work to be performed under this contract will be performed
Building 758, Jefferson Hall Library.
OPTION 1. Redundant Power, Building 758, Jefferson Hall Library. Contingent on funding.
OPTION 2. General Instructional Building(GIB). OPTION 2, Contingent on funding.
OPTION 3. General Instructional Building (GIB). Contingent upon funding. OPTION 4. Building 752, Mahan Hall, Contingent on funding.
OPTION 5. Building 752, Mahan Hall. Contingent upon funding OPTION 6. Building 752, Mahan Hall. Contingent upon funding. United States Military Academy, Westpoint, NY, 10996.
C1.8 Site Survey. All prospective contractors will be offered a site survey to review the requirement of this PWS. All site surveys will be coordinated through the Contracting Officer.
C1.9 Contractor Travel: Reserved
C1.10 Other Direct Costs (ODCs): Special Equipment rental, Hi Reach scaffolding.
PART 2 SPECIFIC REQUIREMENTS
C2.1 Basic Services: The Contractor shall provide services for the upgrade and renovation of existing commercial cellular Distributed Antenna Systems (DAS) components and equipment that are at end of life technology and replace them with current 5g capability. The contractor shall provide all labor, equipment and consumables to upgrade capability in support of providing modern capabilities to the Cadet, Staff and Faculty of the United States Military Academy (USMA), Westpoint, New York. The work performed under this PWS shall conform to the following standards
Standard Purpose
BICSI 006 DAS design and implementation
NFPA 70 (NEC) Electrical safety and installation
IEEE 1100, 1584,
3007.1
Grounding, arc-flash, ESD safety
IFC Section 510 Fire code compliance for public safety DAS
FCC Regulations Frequency and interference control
47 CFR 1.1310 Radiofrequency Radiation Exposure Limits
47 CFR 90.219, Use of Signal Boosters
ANSI/TIA-569, Telecommunications Pathways and Spaces
ANSI/TIA-606 Administration Standard for Telecommunications Infrastructure
TIA TSB- 5018 Structured Cabling Infrastructure Guidelines to Support Distributed Antenna Systems
Manufacturers Guidelines Major Equipment Manufacturers Installation Guidance
ANSI/TIA-607-E Telecommunications Bonding and Grounding
Standard Purpose
ANSI/TIA-568.3-E Optical Fiber Cabling and Components
ANSI/TIA-756-B Customer Owned Outside Plant Telecommunications Infrastructures
BICSI TDMM 15th Ed.
a. All network enabled hardware and software must support Internet Protocol version 6 (IPv6).
b. All hardware and software must meet all federal Section 508 requirements.
C2.1.1. Major Active Equipment. All active equipment must be newly manufactured provided by Advanced RF Technologies (ADRF).
C2.1.2 DAS Performance Specifications. All Distributed Antenna Systems shall be certified and perform to the below specifications.
Category Target Value Area Comments
RSRP < 3
GHz
-95 dBm >95% -95dBm or better RSRP design target is required for all systems over 95% of the Coverage Area
RSRP > 3 GHz) -100 dBm
>95% -100 dBm or better RSRP design target is required for all systems over 95% of the Coverage Area.
SINR > 4 dB > 95% The SINR is greater than 4 dB with a loading of 100% for 95%+ of coverage area.
Dominance Over Macro 6 dB 100% The design should be at a minimum 6 dB stronger than the peak macro benchmark data at any point in the entire coverage area.
C2.1.3 Spectrum Requirements. The following Spectrum Requirements support the objective of this requirement.
Table 3 Spectrum Requirements
C2.1.4 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) The Contractor's proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within 10DAYS after date of contract award (Deliverable 1). The workplan can be Microsoft Project or Excell spreadsheet which would define milestones. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum 5 calendar days prior to implementation.
C2.2 Tasks: Building 758, Jefferson Hall Library. Task requirements for Building 758, Jefferson Hall consist of the following:
C2.2.1. The contractor shall perform an RF Propagation Study to establish the optimal placement of passive antennas and components. The contractor shall identify and remove all active DAS components from the facility and dispose of the equipment in accordance with environmental and regulatory guidelines and local regulations.
a. STANDARD(STD). The equipment will be removed and disposed of in accordance with environmental and regulatory guidelines and local regulations.
b. STD. The Contractor shall ensure that all personnel involved in the removal and transportation of removed equipment follows OSHA Standard 1910.176- Handling Materials.
c. STD. The contractor shall coordinate downtime of sectors to the CIO/G6 Network Service Branch and Major Carriers as appropriate.
d. STD. The contractor shall not use Government facilities for disposal of any equipment/materials removed under this PWS.
e. STD. All areas impacted by removal of infrastructure shall be cleaned and clear of debris. Floors and office areas which may have been impacted by dust, falling debris shall be cleaned and remedied before the end of every workday.
C2.2.2. The contractor shall perform a RF Propagation study to assess the building layout for optimal antenna placement, validate cable routes, and passive components.
a. STD. Provide floor plan with antenna locations and cable route to the COR before implementation. (Deliverable # 11)
b. No work will be performed pending the acceptance of the plan as communicated by the COR.
C2.2.3. The contractor shall install active equipment within the assigned telecommunications area within the racks and spaces vacated by the equipment removed in section 2.2.1.
a. STD. All equipment shall be installed in accordance with the manufacturer's specifications.
b. STD. All personnel assigned for the installation of equipment shall be experienced and certified to perform this task, in addition to certifications required by ADRF.
C2.2.4 Infrastructure Installation. The contractor will install all passive equipment to include antennas, cabling, connectors, taps, splitters ect.. from the active equipment throughout its respective zone.
a. STD. All infrastructure installation practices will be installed in accordance with references in Table 1.
b. STD. All cables will be dressed and secure with a neat appearance.
c. STD. All personnel assigned to this task will be qualified and or certified in the installation of DAS Infrastructure.
C2.2.5. Testing and certification. The contractor shall provide certification and performance measures for both passive and active systems.
a. STD. All cable will be tested end to end
b. STD. The contractor shall coordinate active operation with the COR and or CIO/G6 Network Service branch.
c. STD. Active test results will meet the requirements in Table 2 and Table 3.
C2.2.6. Closeout Documentation. The contractor shall provide final design plan, RF Propagation studies, test results, As Built.
a. STD. Final documentation shall be in electronic format. All drawings shall be in ADOBE PDF format.
b. Final documentation shall be provided to the COR within 15 days of close-out.(Deliverable #12)
C2.2.7. OPTION 1. Contingent upon funding. The contractor shall provide and install a redundant back-up power system to the active DAS equipment installed within building 758, Jefferson Hall Library.
a. STD. The systems will be rated for 2hrs.
b. STD. The contractor will perform a service test along with the COR to validate the performance of the system.
C2.3. OPTION 2. General Instructional Building(GIB). The contractor shall provide the assessment and replacement of existing DAS equipment with newly manufactured ADRF equipment to support 5G cellular technologies. The contractor shall perform a RF Propagation study to determine the optimal placement of antenna and passive components.
C2.3.1 The contractor shall perform an RF Propagation Study to establish the optimal placement of passive antennas and components. The contractor shall identify and remove all active DAS components from the facility and dispose of the equipment in accordance with environmental and regulatory guidelines and local regulations.
a. STANDARD(STD). The equipment will be removed and disposed of in accordance with environmental and regulatory guidelines and local regulations.
b. STD. The Contractor shall ensure that all personnel involved in the removal and transportation of removed equipment follows OSHA Standard 1910.176- Handling Materials.
c. STD. The contractor shall coordinate downtime of sectors to the CIO/G6 Network Service Branch and Major Carriers as appropriate.
d. STD. The contractor shall not use Government facilities for disposal of any equipment/materials removed under this PWS.
e. STD. All areas impacted by removal of infrastructure shall be cleaned and clear of debris. Floors and office areas which may have been impacted by dust, falling debris shall be cleaned and remedied before the end of every workday.
C2.3.2. The contractor shall perform a RF Propagation study to assess the building layout for optimal antenna placement, validate cable routes, and passive components.
a. STD. Provide floor plan with antenna locations and cable route to the COR before implementation. (Deliverable # 11)
b. No work will be performed pending the acceptance of the plan as communicated by the COR.
C2.3.3. The contractor shall install active equipment within the assigned telecommunications area within the racks and spaces vacated by the equipment removed in section 2.2.1.
a. STD. All equipment shall be installed in accordance with the manufacturer's specifications.
b. STD. All personnel assigned for the installation of equipment shall be experienced and certified to perform this task.(CERTIFICATION)
C2.3.4 Infrastructure Installation. The contractor will install all passive equipment to include antennas, cabling, connectors, taps, splitters ect.. from the active equipment throughout its respective zone.
a. STD. All infrastructure installation practices will be installed in accordance with references in Table 1.
b. STD. All cables will be dressed and secure with a neat appearance.
c. STD. All personnel assigned to this task will be qualified and or certified in the installation of DAS Infrastructure.
C2.3.5. Testing and certification. The contractor shall provide certification and performance measures for both passive and active systems.
a. STD. All cable will be tested end to end
b. STD. The contractor shall coordinate active operation with the COR and or CIO/G6 Network Service branch.
c. STD. Active test results will meet the requirements in Table 2 and Table 3.
C2.3.6. Closeout Documentation. The contractor shall provide final design plan, RF Propagation studies, test results, As Builts.
a. STD. Final documentation shall be in electronic format. All drawings shall be in ADOBE PDF format.
b. Final documentation shall be provided to the COR within 15 days of close-out.
(Deliverable #12)
C2.3.7. OPTION 3. Contingent upon funding. The contractor shall provide and install a redundant back-up power system to the active DAS equipment installed within building GIB Facility adjacent to building 758, Jefferson Hall Library.
C2.4. OPTION 4. Contingent upon funding. The contractor shall remove all active components and replace and install new ADRF equipment to support 5G cellular technologies within Building 752, Mahan Hall. Existing passive equipment and cabling shall be reused.
C2.4.1. The contractor shall identify and remove all active DAS components from the facility. and dispose of the equipment in accordance with environmental and regulatory guidelines and local regulations.
a. STD. The contractor shall not use Government facilities for disposal of any equipment/materials removed under this PWS.
b. STD. The equipment will be removed and disposed of in accordance with environmental and regulatory guidelines and local regulations.
c. STD. The Contractor shall ensure that all personnel involved in the removal and transportation of removed equipment follows OSHA Standard 1910.176- Handling Materials.
d. STD. The contractor shall coordinate downtime of sectors to the CIO/G6 Network Service Branch and Major Carriers as appropriate.
C2.4.2. The contractor shall install active equipment within the assigned telecommunications area within the racks and spaces vacated by the equipment removed in section 2.4.1.
a. STD. All equipment shall be installed in accordance with the manufacturer's specifications.
b. STD. All personnel assigned for the installation of equipment shall be experienced and certified to perform this task.
C2.4.3. Testing and certification. The contractor shall provide certification and performance measures for both passive and active systems.
a. STD. All cable will be tested end to end.
b. STD. Any defective components shall be identified and replaced by the contractor
c. STD. The contractor shall coordinate outages and disruptions of active operation with the COR, CIO/G6 Network Service branch and major carriers.
d. STD. Active test results will meet the requirements in Table 2.
e. STD. The contractor shall coordinate downtime of sectors to the CIO/G6 Network Service Branch and Major Carriers as appropriate.
C2.4.4. Closeout Documentation. The contractor shall provide final design plan, RF Propagation studies, test results, As Builds.
a. STD. Final documentation shall be in electronic format. All drawings shall be in ADOBE PDF format
b. Final documentation shall be provided to the COR within 15 days of close-out. (Deliverable #12)
C2.5. OPTION 5. Contingent upon funding, the contractor shall remove and replace all passives equipment including antennas and cable and replace the DAS infrastructure with a new infrastructure which is rated for 5G performance.
a. STD. The contractor shall not use Government facilities for disposal of any equipment/materials removed under this PWS.
b. STD. The equipment will be removed and disposed of in accordance with environmental and regulatory guidelines and local regulations.
c. STD. The Contractor shall ensure that all personnel involved in the removal and transportation of removed equipment follows OSHA Standard 1910.176- Handling Materials.
d. STD. The contractor shall coordinate downtime of sectors to the CIO/G6 Network Service Branch and Major Carriers as appropriate.
C2.5.1. The contractor shall perform a RF Propagation study to assess the building layout for optimal antenna placement, validate cable routes, and passive components.
a. STD. Provide floor plan with antenna locations and cable route to the COR before implementation. (Deliverable # 11)
b. No work will be performed pending the acceptance of the plan as communicated by the COR.
C2.5.2. Infrastructure Installation. The contractor will install all passive equipment to include antennas, cabling, connectors, taps, splitters ect.. from the active equipment throughout its respective zone.
a. STD. All infrastructure installation practices will be installed in accordance with references in Table 1.
b. STD. All cables will be dressed and secure with a neat appearance
c. STD. All personnel assigned to this task will be qualified and certified in the installation of DAS Infrastructure.
C2.5.3. Testing and certification. The contractor shall provide certification and performance measures for both passive and active systems.
a. STD. All cable will be tested end to end.
b. STD. Any defective components shall be identified and replaced by the contractor.
c. STD. The contractor shall coordinate outages and disruptions of active operation with the COR and or CIO/G6 Network Service branch.
d. STD. Active test results will meet the requirements in Table 2.
e. STD. The contractor shall coordinate downtime of sectors to the CIO/G6 Network Service Branch and Major Carriers as appropriate.
C2.5.4. Closeout Documentation. The contractor shall provide final design plan, RF Propagation studies, test results, As Builts.
a. STD. Final documentation shall be in electronic format. All drawings shall be in ADOBE PDF format.
b. Final documentation shall be provided to the COR within 15 days of close-out.
(Deliverable #12)
C2.5.5. OPTION 6. Contingent upon funding Contingent upon funding. The contractor shall provide and install a redundant back-up power system to the active DAS equipment installed within building 752, Mahan Hall.
QUALITY ASSURANCE
C4.1 Quality Control Plan (QCP):. The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor's Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer's Representative (COR) for review within 10DAYS after date of contract award (Deliverable #2)
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 5 working days If the Government has provided comments, the Contractor shall then have 5 working days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer's acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 5 working days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.
b. How the Contractor will monitor work to ensure performance complies with all deliverables (etc.
timelines, deadlines, and goals);
c. How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract's clauses;
d. How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes /approvals throughout contract performance;
f. How the Contractor will inventory and track maintenance of all Government Provided Equipment / Materials;
g. How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
h. How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
C4.1.1 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 2 hours of identifying those issues. Verbal reports shall be followed by written reports within 1DAY.
C4.2 Quality Assurance: The Government will evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
C4.3 Performance Requirements Summary(PRS). The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement
C4.4 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
C4.4.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
PART 5
KEY PERSONNEL
C5.1 Key Personnel- Contractor: The following personnel are considered key personnel by the Government: The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. Each of these individuals shall be provided in writing to the Contracting Officer no later than 5 DAYS after contract award (Deliverable #4). The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 0700 and 1700. Qualifications for all key personnel are listed below:
C6.1 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
C6.1.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S.
holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year's Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents' Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th
Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran's Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
C6.1.2 Should the United States Congress and/or the President of the United States sign into law any new federal holidays not listed above, guidance will be given as to the availability of personnel and the effected hours of operation where the work is being conducted. Contractors will be notified as soon as any new holiday guidance is given to the Department of Defense, Department of the Army and the United States Military Academy at West Point.
C6.2 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
C6.2.1 Government Facility Office Hours: The Government facility office hours are 7:00 am and 5:
00 pm (0700 - 1700 hours) Monday thru Friday except U.S. Holidays identified in paragraph
1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
C6.2.2 Government Facility Operating Hours: The Government facility operating hours are 7:00 am and 5:00 pm (0700 - 1700 hours) Monday thru Friday except U.S. Holidays identified in paragraph 6.1.1, above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
C6.2.3 Contractor Support Hours: The Contractor shall provide support between the hours of 7:00 am and 5:00 pm (0700 - 1700 hours) Monday thru Friday except on Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
C6.3 Blackout dates: USMA is an educational institution and located at the United States Army Garrison - West Point. Certain Army functions, as well as USMA activities, occur throughout the calendar year where contractors are prohibited from conducting work. Work during these dates is allowed to continue based on mission requirements and coordination between the government and contractor; however, these dates are subject to blackout due to the Academy's mission and operations.
C6.4 Security Requirements: The following information is provided on security related matters.
C6.4.1 Security Program: Contractor personnel performing work under this contract must comply with the standards as defined within this document.
C6.4.1.1 Alien Employment. The contractor shall not employ any alien who does not have a valid US Immigration I-551 or I-94. The contractor shall provide valid social security numbers and citizenship status of all employees to the Government, upon request.
C6.4.1.2 E-Verify. E-Verify is an Internet based system operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA) that allows participating employers to electronically verify the employment eligibility of their newly hired employees. E-Verify is currently free to employers and is available in all 50 states. E-Verify provides an automated link to federal databases to help employers determine employment eligibility of new hires and the validity of their Social Security numbers. E-Verify are the best means for determining employment eligibility of new hires and the validity of their Social Security numbers.
(1) Contractors shall use E-Verify on all employees that will be working on this installation, under this contract. This shall be done prior to the employee starting work on the installation.
For E-Verify information: www.dhs.gov/E-Verify 1-888-464-4218
(2) The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Additional information about trafficking in persons may be found at the website for the Department of State's Office to Monitor and Combat Trafficking in Persons' at http://www.state.gov /g/tip. Government contracts shall :
(a) Prohibit contractors, contractor employees, subcontractors, and subcontractor employees from
(b) Engaging in severe forms of trafficking in persons during the period of performance of the contract;
(c) Procuring commercial sex acts during the period of performance of the contract; or
(d) Using forced labor in the performance of the contract;
(e) Require contractors and subcontractors to notify employees of the prohibited activities described in paragraph (a) of this section and the actions that may be taken against them for violations; and
(f) Impose suitable remedies, including termination, on contractors that fail to comply with the requirements of paragraphs (a) and (b) of this section.
C6.4.2 Personnel Security Clearance Requirements: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
C6.4.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information /data and obtain required documentation or clearances will be grounds for denying access to U.S.
installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm's failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
C6.4.3.1 6.4.3.1 Force Protection Conditions (FPCON's).
During higher Force Protection Conditions (FPCON's) Contract personnel are required to comply with all Antiterrorism policies and procedures while on the…
This is the start of the file's text. The full file is on GovTribe.