170_Telecom - 100.pdf

PDF 13 MB Posted

Attached to
DAS (DISTRIBUTED ANTENNA SYSTEM) expansion to Bradley Barracks Federal contract opportunity
Solicitation number
W911SD24R0128
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document appears to be a solicitation for a Distributed Antenna System (DAS) expansion to the Bradley Barracks at the United States Military Academy. The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis is the procuring agency.

The solicitation indicates that the existing DAS system does not meet the design standards due to the use of alternative building materials during the renovation process. The full solicitation details, including the required products and services, will be attached on SAM.gov. No specific response dates, award dates, pricing terms, or set asides are provided in this document. The solicitation seeks to address the DAS performance issues at the Bradley Barracks.

View the file

Other files for this federal contract opportunity

Other files attached to DAS (DISTRIBUTED ANTENNA SYSTEM) expansion to Bradley Barracks, newest first.
File Type Posted
170_Telecom - DAS_PA_SYSTEM - 1.pdf PDF
Amendment Solicitation W911SD24R01280007.pdf PDF
BRADLEY_IBWAVE_REDACT.pdf PDF
Amendment Solicitation W911SD24R01280006.pdf PDF
Amendment Solicitation W911SD24R01280005.pdf PDF
Amendment Solicitation W911SD24R01280004.pdf PDF
Amendment Solicitation W911SD24R01280003.pdf PDF
Sign In Sheets 10 July 2024.pdf PDF
Bradley Barracks DAS Draft Revised Solicitation 2.docx DOCX document
Amendment Solicitation W911SD24R0128.pdf PDF
Bradley Barracks DAS Solicitation W911SD24R0128.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

DESCRIPTIONTYPE

AFC

AFF

AFG

BFC

C

EC

ETBD

ETR

ETBR

FA

FAAP

FACP

ABOVE FINISHED COUNTER

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

BELOW FINISHED CEILING

CONDUIT

ELECTRICAL CONTRACTOR

G OR GND

EXISTING TO BE DEMOLISHED

EXISTING TO REMAIN

EXISTING TO BE RELOCATED

FIRE ALARM

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

GROUND

CR CARD READER

INTERCOM INTERCOMMUNICATION

J-BOX JUNCTION BOX

GC GENERAL CONTRACTOR

CLG CEILING

BET BUILDING ENTRANCE TERMINAL

NEC

POS

UON

W

WP

POINT OF SALE

UNLESS OTHERWISE NOTED

WATTS OR WIRE

WEATHERPROOF

P POLE

MD MOTION DETECTOR

MIC MICROPHONE

NATIONAL ELECTRICAL CODE

NTS NOT TO SCALE

OC ON CENTER

PA PUBLIC ADDRESS

PB PUSHBUTTON SWITCH

SPD SURGE PROTECTION DEVICE

TTB TELEPHONE TERMINAL BOARD

TC TELECOMMUNCATIONS CONTRACTOR

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

WG WIRE GUARD

PC PLUMBING CONTRACTOR

SPKR SPEAKER

MC MECHANICAL CONTRACTOR

SOG SLAB ON GRADE

LV LOW VOLTAGE

NIC NOT IN CONTRACT

ABBREVIATIONS

DESCRIPTIONTYPE

Cx EXISTING UNDERGROUND COMMUNICATIONS

ACS ACCESS CONTROL SYSTEM

NIPR

NON-CLASSIFIED INTERNET PROTOCOL

ROUTER NETWORK

GWB GYPSUM WALLBOARD

TYPE DESCRIPTION

SYMBOL LEGEND (NOTE: NOT ALL SYMBOLS ARE NECESSARILY USED ON PLANS)

TYPE DESCRIPTION

TERMINATE THREE (3) CATEGORY 6 CABLES ON RJ-45 JACKS, ONE (1) FOR VOICE AND TWO (2) FOR DATA.

ALSO PROVIDE ONE (1) UNUSED SPACE AND FILL WITH BLANK. PROVIDE 4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING AND 1" CONDUIT FROM THE OUTLET TO ABOVE CEILING TO ACCESSIBLE CEILING IN THE CORRIDOR, THEN CABLES SHALL BE ROUTED IN NON-CONTINUOUS CABLE SUPPORTS (J-

HOOKS) BACK TO NEAREST TELECOMMUNICATIONS ROOM. OUTLET MOUNTED 18" AFF, UON.

WALL PHONE. TERMINATE ONE (1) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J- BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM. VOICE OUTLET

MOUNTED 54" AFF, UON.

TELECOMMUNICATIONS TERMINATION BACKBOARD BY TC. PROVIDE 3/4" THICK x 8' HIGH x LENGTH PER PLANS, UON. BACKBOARD SHALL BE A-C GRADE FIRE RATED PLYWOOD WITH 'A' SIDE FACING

OUT.

TELECOMMUNICATIONS STYLE COPPER GROUND BAR BY EC. SUBSCRIPT "TMGB" DENOTES

TELECOM MAIN GROUND BAR. SUBSCRIPT "TGB" DENOTES TELECOM GROUND BAR.

TTB

4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING. J-BOX AND CONDUIT ROUGH-

IN BY EC.JJ

RACK/CABINET BY TC. SEE RACK ELEVATION DETAILS AND FLOOR PLANS FOR ADDITIONAL INFORMATION.

CABLE RUNWAY 18" WIDE. LOCATION AND LENGTH OF EACH TYPE SHALL BE PER ENLARGED TELECOM ROOM PLANS. PROVIDE ALL REQUIRED HARDWARE, MANUFACTURERED SWEEPING BENDS, HANGERS ETC. AND INSTALL PER MANUFACTURERS RECOMMENDATIONS. COORDINATION RUNWAY LOCATION WITH

OTHER DISCIPLINES. CABLE RUNWAY IN TELECOM ROOMS IS BY TC.

PROVIDE ONE (1) RG-6 COAXIAL CABLE WITH 'F' CONNECTOR FOR WALL-MOUNTED CABLE

TELEVISION OUTLET. ROUTE CABLE IN 1" CONDUIT FROM OUTLET TO TR ROOM. MOUNT

OUTLET 72" AFF, UON.

TV

CCTV CAMERA ROUGH-IN ONLY. CONTRACTOR TO PROVIDE 4-11/16" X 2-1/8" J-BOX WITH 1" CONDUIT WITH PULL STRING TO ABOVE NEAREST ACCESSIBLE CEILING. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATION AND CEILING TYPES. CAMERAS LOCATED IN LAY-IN (ACT) TYPE CEILINGS DO NOT

REQUIRE J-BOX AND CONDUIT ROUGH-IN AND ARE SHOWN FOR REFERENCE ONLY.

CAM

CARD READERCR

RX REQUEST TO EXIT BUTTON WALL MOUNTED AND TIED TO MAGLOCK POWER SUPPLY.

DOOR CONTACT OR DOOR POSITION SWITCH DEVICEDC

ML MAGNETIC LOCKING DEVICE. COORDINATE EXACT LOCATION AND REQUIREMENTS WITH GENERAL

CONTRACTOR(G.C.).

PIR REQUEST TO EXIT PASSIVE INFRARED DEVICE.

1/2

W

TERMINATE TWO (2) CATEGORY 6 CABLES ON RJ-45 JACKS, FOR DATA. PROVIDE 4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING AND 1" CONDUIT FROM THE OUTLET TO ABOVE CEILING TO ACCESSIBLE CEILING IN THE CORRIDOR, THEN CABLES SHALL BE ROUTED IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO NEAREST TELECOMMUNICATIONS ROOM . DATA OUTLET MOUNTED 18"

AFF, UON.

C PROVIDE WALL MOUNTED SAPLING SBL 3000 SERIES DIGITAL WIRELESS CLOCK, OR EQUAL. COORDINATE

LOACATION WITH SIMPLEX RECEPTACLE PROVIDED ON POWER PLANS.

WIRELESS ACCESS POINT OUTLET. NO FACEPLATE. FLUSH MOUNT TO GYPSUM BOARD CEILING WITH SINGLE GANG J-BOX. EXTEND CABLE IN 1" CONDUIT TO ABOVE ACCESSIBLE CEILING IN THE CORRIDOR, THEN EXTEND CABLES IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM (TR/TER). TERMINATE TWO (2) ORANGE JACKET CATEGORY 6A CABLES ON ORANGE RJ-45 JACKS.

OUTLET LABEL SHALL BE LOCATED ON THE CEILING AS CLOSE AS POSSIBLE TO THE LOCATION OF THE WAP

OUTLET.

WAP

ELEVATOR PHONE. TERMINATE ONE (1) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J-BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN

ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM

(TR/TER). VOICE OUTLET MOUNTED 54" AFF, UON. SUBSCRIPT DENOTES QUANTITY. ELEVATOR

MANUFACTURER SHALL PROVIDE EXTRA TRAVELER CABLE FOR PHONE IN ELEVATOR CAB.

BASKET TYPE CABLE TRAY. REFER TO PLANS FOR DIMENSIONS. SEE FLOOR PLANS FOR LOCATION AND LENGTH/WIDTH. PROVIDE ALL REQUIRED HARDWARE, MAUFACTURERED SWEEPING BENDS, HANGERS ETC. AND INSTALL PER MANUFACTURERS RECOMMENDATIONS. COORDINATE CABLE TRAY LOCATION

WITH OTHER DISCIPLINES. CABLE TRAY SHALL BE PROVIDED AND INSTALLED BY E.C.

EL ELECTRIC LOCKING DEVICE. ELECTRONIC LOCKING HARDWARE PROVIDED AND INSTALLED BY GC.

S CEILING MOUNTED PA SPEAKER.

DAS ANTENNADA

LMR ANTENNALA

TERMINATE THREE (3) CATEGORY 6 CABLES ON RJ-45 JACKS, ONE (1) FOR VOICE AND TWO (2) FOR DATA.

ALSO PROVIDE ONE (1) UNUSED SPACE AND FILL WITH BLANK. PROVIDE 4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING AND 1" CONDUIT FROM THE OUTLET TO ABOVE CEILING TO ACCESSIBLE CEILING IN THE CORRIDOR, THEN CABLES SHALL BE ROUTED IN NON-CONTINUOUS CABLE SUPPORTS (J-

HOOKS) BACK TO NEAREST TELECOMMUNICATIONS ROOM . OUTLET MOUNTED 36" AFF, UON.

1/2

CABLE ROUTING. CABLES SHALL BE SUPPORTED BY J-HOOKS ALONG PROPOSED CABLE ROUTE. REFER TO J-HOOK DETAIL FOR ADDITIONAL INFORMATION. TC SHALL COORDINATE J-HOOK LOCATIONS WITH

OTHER TRADES PRIOR TO ROUGH-IN.

TERMINATE ONE (1) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J-BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN ROUTE IN NON- CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM (TR/TER). VOICE

OUTLET MOUNTED 72" AFF, UON.

FIRE ALARM PHONE. TERMINATE ONE (2) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J-BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM .

COORDINATE MOUNTING HEIGHT WITH FIRE ALARM CONTRACTOR.

PT

POKE-THRU DEVICE PROVIDED UNDER ELECTRICAL CONTRACT. TELECOM CONTRACTOR TO PROVIDE ALL CONNECTORS AND FACE PLATE AS REQUIRED. TERMINATE TWO (2) CATEGORY 6 CABLES ON RJ-45 JACKS.

PROVIDE 1" CONDUIT FROM POKE-THUR TO NEAREST ACCESSIBLE CEILING ON FLOOR BELOW. THEN ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM ON

FLOOR BELOW.

A. ALL TELECOMMUNICATIONS WORK SHALL CONFORM TO THE LATEST ANSI/TIA, LATEST EDITION BICSI TDMM DESIGN MANUAL, NATIONAL

ELECTRICAL CODE, IBC REQUIREMENTS, UFC STANDARDS & LOCAL REQUIREMENTS.

B. PRIOR TO ACCOMPLISHING ANY WORK IN ANY AREA, ALL WORK SHALL BE PLANNED AND COORDINATED WITH OTHER TRADES AND THE

GOVERNMENT.

C. IT SHALL BE THE TELECOM CONTRACTORS RESPONSIBILITY TO COORDINATE WITH THE TELEPHONE AND/OR CATV SERVICE PROVIDER

TO ENSURE TIMELY DELIVERY OR PERMANENT TELEPHONE AND/OR CATV SERVICE.

D. TELECOMMUNICATION RACKS, CABLE RUNWAYS AND ALL ACCESSORIES WITHIN THE TER AND TR ROOMS SHALL BE PROVIDED AND

INSTALLED BY THE TELECOMMUNICATIONS CONTRACTOR.

E. A MAXIMUM 40% FILL RATIO IS ALLOWED FOR ALL CONDUIT SIZES.

F. A PULL CORD (NYLON; 200LB STRENGTH, 1/8-INCH MINIMUM) SHALL BE CO-INSTALLED WITH ALL BACKBONE CABLES INSTALLED IN ANY

CONDUIT LONGER THAN FIFTEEN (15) FEET.

G. E.C. SHALL PROVIDE PULL CORD (NYLON; 200LB STRENGTH, 1/8-INCH MINIMUM) WITH CABLES IN ALL CONDUITS 2" AND LARGER.

H. A PULL CORD (NYLON; 200LB STRENGTH, 1/8-INCH MINIMUM) SHALL BE INSTALLED IN ANY EMPTY TELECOM CONDUITS.

I. WHERE BACKBONE CABLES AND HORIZONTAL DISTRIBUTION CABLES ARE INSTALLED IN A CABLE TRAY OR WIREWAY, BACKBONE

CABLES SHALL BE BUNDLED SEPARATELY FROM THE HORIZONTAL DISTRIBUTION CABLES

J. ALL CABLES INSTALLED IN THE CEILING CAVITY SHALL BE PLENUM RATED UNLESS OTHERWISE NOTED.

K. ALL CABLES INSTALLED IN CONDUIT BELOW SLAB OR UNDERGROUND SHALL BE RATED FOR WET CONDITIONS.

L. NO CABLING SHALL BE LAID ON CEILING GRID PER THE NEC OR ANSI/TIA 569-D. CABLING SHALL MAINTAIN A MINIMUM 5” SEPARATION

FROM ANY LIGHT FIXTURE PER ANSI/TIA 569-D AND 12” FROM ANY EMI ENDUCING EQUIPMENT. RODS OR WIRES CURRENTLY USED TO SUPPORT OTHER STRUCTURAL (CEILING GRID), MECHANICAL (PIPES OR DUCTWORK) AND ELECTRICAL (LIGHT FIXTURES OR CONDUITS) SHALL NOT BE UTILIZED AS ATTACHMENT POINTS FOR NON-CONTINUOUS SUPPORTS (J-HOOKS) PER ANSI/TIA 569-D.

USE PLENUM RATED TIE-WRAPS ABOVE ACCESSIBLE CEILINGS AND VELCRO WRAPS BELOW ACCESSIBLE CEILINGS.

M. TC SHALL USE CABLE TRAYS AND CONDUIT SLEEVES AS THEIR PATHWAY THROUGHOUT MOST OF THE BUILDING U.O.N. IN AREAS WHERE SUPPORT STRUCTURE IS NOT AVAILABLE , CABLES SHALL BE SUPPORTED WITH METALLIC J-HOOKS EVERY 4-FEET OR LESS AND HAVE A MINIMUM 3 INCH VERTICAL CLEARANCE FROM THE CEILING GRID AND TILE. CABLES SHALL NOT BE SUPPORTED IN AREAS WHERE CABLE IS SUSCEPTIBLE TO DAMAGE OR EMI. CABLES SHALL BE NEATLY GROOMED WHEN INSTALLED IN J-HOOKS.

N. HORIZONTAL DISTRIBUTION CABLES SHALL BE BUNDLED IN GROUPS OF NO MORE THAN 40 CABLES. THIS INCLUDES CABLE BUNDLES

SUPPORTED IN J-HOOKS.

O. ALL PENETRATIONS THROUGH WALLS AND FLOOR SHALL BE SLEEVED.

P. STUDY ALL DRAWINGS, MANUFACTURER'S INSTRUCTIONS, UL LISTINGS, AND CATALOG DATA TO DETERMINE HOW EQUIPMENT

ACCESSORIES AND RELATED ITEMS ARE TO BE SUPPORTED, MOUNTED, OR SUSPENDED. PROVIDE ALL BOLTS, INSERTS, BRACKETS, SPACERS, STRUCTURAL SUPPORTS, AND ACCESSORIES FOR PROPER SUPPORT OF CABLES FURNISHED UNDER THIS CONTRACT.

Q. TC SHALL PROVIDE BONDING FOR CABLE RUNWAYS, CABLE TRAYS, RACKS, EQUIPMENT IN RACKS, ARMORED CABLES, AND HOUSINGS WITH #6 AWG STRANDED INSULATED GREEN JACKET CONDUCTOR WITH DUAL HOLE EXOTHERMIC OR COMPRESSION LUG. EC SHALL PROVIDE TMGB, TGB AND ALL OTHER GROUNDING AND BONDING FOR TELECOMMUNICATIONS. BONDING AND GROUNDING SHALL BE PER NFPA 70 (NEC), BICSI TDMM DESIGN MANUAL AND ANSI/TIA-607-C COMMERCIAL BUILDING GROUNDING AND BONDING

REQUIREMENTS FOR TELECOMMUNICATIONS.

R. ALL HORIZONTAL COPPER, FIBER AND COAXIAL CABLE INSTALLATIONS SHALL CONFORM TO THE LATEST ANSI/TIA-568 STANDARDS.

S. ALL LABELING SHALL COMPLY WITH LATEST ANSI/TIA-606 AND LOCAL STANDARDS.

T. ALL TELECOMMUNICATIONS CONDUITS SHALL NOT BE INSTALLED ADJACENT TO ANY HEAT SOURCE SUCH AS; BOILERS, HEATERS

(ELECTRIC OR GAS), HOT WATER LINES, STEAM LINES ETC.

U. ALL TELECOM CONDUIT ENDS SHALL BE REAMED AND FIT WITH AN INSULATED BUSHING BY EC.

V. ALL FLOOR SLEEVES AND CONDUIT PENETRATIONS BY EC THROUGH THE FLOOR SHALL PROTRUDE A MINIMUM 4" ABOVE THE FINISHED

FLOOR.

W. EC SHALL PROVIDE FIRE PENETRATION SYSTEM FOR ALL TELECOM PATHWAYS AND SLEEVES. TC SHALL PROVIDE FIRE PENETRATION

FOR ANY ANNULAR OPENINGS OF PATHWAYS AFTER CABLES HAVE BEEN INSTALLED AND TESTED.

X. REFER TO TELECOMMUNICATIONS RISER DIAGRAM FOR ADDITIONAL INFORMATION.

Y. CONDUIT RUNS BETWEEN (2) PULL POINTS OR JUNCTION BOXES SHALL NOT HAVE AN AGGREGATE OF BENDS GREATER THAN 180

DEGREES.

Z. ALL CONDUIT RUNS SHALL BE BONDED OR GROUNDED BY EC ON ONE OR BOTH ENDS.

AA. MAINTAIN MINIMUM 3' CLEARANCE ON ONE SIDE OF CABLE TRAY AND MINIMUM OF 12" ON OPPOSITE SIDE. MAINTAIN 12" CLEARANCE

FROM ALL HVAC, LIGHTS, AND STRUCTURE ON TOP AND BOTTOM OF CABLE TRAY. CABLE TRAY SHALL NOT BE RUN PARALLEL BELOW

ANY WATER OR SANITARY PIPES.

BB. ALL EXPOSED CABLES IN THE TELECOM EQUIPMENT ROOM (TER) AND TELECOM ROOMS (TR) SHALL BE INSTALLED INSIDE POLYETHYLENE TEREPHTHALATE (PET) EXPANDABLE BRAIDED SLEEVING TO PROVIDE A PROFESSIONAL LOOK ON FINISHED PRODUCT.

PROVIDE YELLOW COLORED SLEEVING FOR DATA CABLING AND GREEN COLORED SLEEVING FOR VOICE CABLES.

CC. CONTRACTOR SHALL SUPPLY FACTORY TERMINATED FIBER OPTIC AND CAT 6 PATCH CORDS FOR EACH VOICE, AND DATA PORTS AND CAT 6A FOR WIRELESS PORTS AT THE TELECOM EQUIPMENT ROOM (TER) AND TELECOM ROOMS (TR) ON EACH FLOOR FOR A COMPLETE AND WORKING TURN-KEY COMMUNICATIONS SYSTEM. LENGTH OF PATCH CORDS TO BE DETERMINED BY USMA/NEC PROJECT MANAGER. CONTRACTOR SHALL ALSO SUPPLY 150 EACH 5 FEET, AND 150 EACH 7 FEET GREEN JACKET CAT 6 PATCH CORDS

FOR THE OUTSIDE PLANT (OSP) COPPER CABLE CROSS CONNECTION IN THE TELECOM ROOMS.

TELECOM - GENERAL NOTES

A. NO WORK IN HATCHED AREAS. TELECOM CONTRACTOR TO MAINTAIN ALL CIRCUITS IN THIS AREA DURING

CONSTRUCTION.

B. DEVICES/EQUIPMENT NOTED AS ETBR ON THE DEMOLITION PLAN(S) SHALL BE REMOVED AND RELOCATED TO

THE NEW LOCATION AS INDICATED ON THE NEW TELECOM PLAN(S). DEVICES AND EQUIPMENT NOTED AS ETBR ON THE TELECOM PLAN(S) INDICATES THE NEW LOCATION FOR THE RELOCATED EXISTING DEVICE/EQUIPMENT.

C. ALL WORK SHOWN LIGHT AND SOLID, AND/OR NOTED AS ETR IS EXISTING TO REMAIN, UNO. ALL WORK SHOWN BOLD AND SOLID ON A NEW WORK PLAN IS NEW, UON. ALL WORK SHOWN BOLD AND DASHED ON A DEMOLITION

WORK PLAN IS EXISTING TO BE DEMOLISHED, UON.

D. ALL EXISTING TELECOM/DATA OUTLETS, CONDUIT, AND SUPPORTS LOCATED ABOVE OR AT THE CEILING AND WITHIN THE AREA OF RENOVATION WITHOUT AN 'ETR' DESIGNATION SHALL BE REMOVED BACK TO TELECOM

ROOM OR SOURCE BY EC.

E. EC SHALL REMOVE ALL ABANDON CONDUITS, HANGERS AND BRACING ABOVE OR IN THE CEILING OF THE AREAS

OF RENOVATION.

F. TELECOM CONTRACTOR SHALL REMOVE ALL EXISTING TELECOM, WIRELESS ACCESS, COAX AND LEGACY CABLES THROUGHOUT THE ENTIIRE BUILDING BACK TO SOURCE (PATCH PANEL OR PUNCH DOWN BLOCK).

G. PROVIDE BLANK STAINLESS STEEL COVERPLATES FOR ALL EXISTING FLUSH MOUNTED OUTLETS THAT ARE

ABANDON IN CMU WALLS.

H. TELECOM CONTRACTOR SHALL COORDINATE REMOVAL OF ALL DAS SYSTEM AMPLIFIERS, ANTENNAS, SPLITTERS, REPEATERS, HUBS, AND RACK MOUNTED EQUIPMENT WITH MR. GARY ALBAUGH, WP STAFF CIO/G6.

REMOVE ALL DEVICES, PROVIDE COMPLETE INVENTORY AND STORE IN LOCATION PROVIDED BY CIO/G6.

I. TELECOM CONTRACTOR SHALL COORDINATE REMOVAL OF ALL NETWORK SWITCHES PRIOR TO BUILDING DEMOLITION WITH MR. CANH NGO, NETWORK ENTERPRISE CENTER (NEC). REMOVE ALL SWITCHES, PROVIDE

COMPLETE INVENTORY AND STORE IN LOCATION PROVIDED BY NEC.

J. CONTRACTOR SHALL REMOVE ALL EXISTING WIRELESS ACCESS POINTS (WAPS) PRIOR TO BUILDING DEMOLITION AND TURN OVER TO GOVERNMENT. CONTRACTOR WILL REINSTALL WAPS IN NEW LOCATIONS UPON

BUILDING COMPLETION.

TELECOM - GENERAL NOTES - DEMOLITION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

T-001

T E

L E

C O

M

S Y

M B

O L L

E G

E N

D

G E

N E

R A

L N

O T

E S

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

EXISTING

'HH-1028'

EXISTING

'MH-5A'

COMMUNICATION

ROOM

B005

TRUNK ROOM

B009

BLDG 747

BLDG 745 A&B

BLDG 745 A&B

SUBSTATION

RM

B006b

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

TD100

T E

L E

C O

M

P A

R T

IA

L D

E M

O L

IT

IO

N

P L A

N

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1" = 20'-0"1

TELECOM - PARTIAL DEMOLITION PLAN

# KEYED NOTES:

1. REMOVE 48-STRAND SINGLE MODE FIBER CABLE FROM

BUILDING 756 TO DAVIS BARRACKS BACK TO HANDHOLE

HH-1028, COIL AND PROTECT CABLE. EXISTING DUCTBANK

SHALL REMAIN AND BE REUSED.

2. EXISTING FIBER OPTIC CABLE FROM BLDG 756, SERVING

BUILDING 747, SHALL BE REMOVED BACK TO MANHOLE MH-5A

AND COILED UP DURING CONSTRUCTION. THE FIBER OPTIC

CABLE SHALL REMAIN FROM MANHOLE MH-5A TO BUILDING 747.

SEE SITE PLAN TS101 FOR ADDITIONAL INFORMATION.

3. REMOVE THE FOLLOWING FIBER AND COPPER CABLES FROM

BUILDING 756 BACK TO MANHOLE MH-5A, COIL AND PROTECT

CABLES IN MANHOLE. EXISTING DUCTBANK SHALL REMAIN

AND BE REUSED.

a. 300-PAIR COPPER CABLE (CA14, 1001-1300)

b. 24-STRAND MULTIMODE (FOC, CB1, 61-84)

c. 24-STRAND MULTIMODE (BIT)

d. 6-STRAND SINGLE MODE (DISTRIBUTION ANTENNA

SYSTEM (DAS))

e. 12-STRAND SINGLE MODE (FOC 756D2, 1-12)

f. 48-STRAND SINGLE MODE (FOC 756D, 1-48)

g. 96-STRAND SINGLE MODE (FOC 756CORE, 1-96)

h. 12-STRAND SINGLE MODE BETWEEN DAVIS BARRACKS

AND BLDG 745C (GATE CONTROL)

GRAPHICS SCALE

40' 60' 80'20'

SCALE: 1/20" = 1'-0"

GENERAL NOTES:

A. PLEASE REFER TO THE ARCHITECTURAL DEMO SHEETS (AD100

TO AD302) FOR THE CONSTRUCTION PHASING AND SEQUENCE

OF WORK.

BLDG 756

BRADLEY BARRACKS

751 753

PB 2 PB 1 MH 3E

MH 3B

HH 1028

BREWERTON ROAD

JEFFERSON PLACE

BREWERTON ROAD

745C

VAULT

MH 4

MH 5

MH 3

MH 2

MH 22

MH 7

MH 5A

T H

A Y

E R

T H

A Y

E R

MH 3A1

MH 3A

MH 8

295'

137'

301'

140'

116'

99'

262' 200'

MH 2A

21 6

21 6

21 6

21 6

21 6

21 6

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

TS101

T E

L E

C O

M

O V

E R

A L L S

IT

E

P L A

N

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

# KEYED NOTES:

1. INSTALL (1) NEW 24 STRAND INDOOR/OUTDOOR RATED SINGLE

MODE FIBER OPTIC CABLE FROM BUILDING 747 TO BUILDING 600

USING EXISTING UNDERGROUND DUCTBANK AND MANHOLE

SYSTEM. FIBER SHALL BE INSTALLED TESTED AND ACTIVE

PRIOR TO REMOVING THE EXISTING FIBER FROM BUILDING 756.

TERMINATE BOTH ENDS OF NEW FIBER OPTIC CABLE IN NEW

2RU CCH PATCH PANEL WITH FACTORY TERMINATED DUPLEX

LC PIGTAILED SPLICE CASSETTES. SEE RACK ELEVATION

DETAIL FOR ADDITIONAL INFORMATION.

2. INSTALL (1) NEW 96 STRAND INDOOR/OUTDOOR RATED SINGLE

MODE FIBER OPTIC CABLE FROM BUILDING 756 TO BUILDING 600

USING EXISTING UNDERGROUND DUCTBANK AND MANHOLE

SYSTEM. TERMINATE BOTH ENDS OF NEW FIBER OPTIC CABLE

IN NEW 4RU CCH PATCH PANEL WITH FACTORY TERMINATED

DUPLEX LC PIGTAILED SPLICE CASSETTES. SEE RACK

ELEVATION DETAIL FOR ADDITIONAL INFORMATION. FIBER

OPTIC CABLE SHALL BE INSTALLED CONTINUOUS THROUGH

EXISTING DUCT AND MANHOLE SYSTEM WITHOUT SPLICES.

3. TERMINATE NEW 24 STRAND AND 96 STRAND FIBER IN 2ND

BASEMENT, ROOM 29C OF BUILDING 600.

4. RE-INSTALL THE FOLLOWING EXISTING FIBER AND COPPER

CABLES FROM MANHOLE MH-5A TO NEW COMMUNICATIONS

EQUIPMENT ROOM B005 IN BLDG 756 USING THE EXISTING

DUCTBANK. TERMINATE EXISTING FIBER OPTIC CABLES

(EXCEPT DAS) IN NEW 2RU AND 4RU CCH PATCH PANELS

WITH FACTORY TERMINATED DUPLEX LC PIGTAILED SPLICE

CASSETTES. TERMINATE DAS FIBER ONTO SC/ACP

CONNECTORS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CABLE LENGTHS AND PROVIDE ALL NECESSARY EQUIPMENT

REQUIRED TO RE-INSTALL EXISTING CABLES FROM MANHOLE

MH-5A TO NEW COMMUNICATIONS ROOM. IF CABLES ARE NOT

LONG ENOUGH THEN NEW OSP COPPER OR FIBER CABLES

SHALL BE SPLICED TO EXISTING CABLES IN MANHOLE 5A. USE

3M 2-TYPE 505 SPLICE ENCLOSURE FOR COPPER CABLES WITH

3M MS2 CONNECTOR MODULES 4000/4005/4008 SERIES AND

COYOTE BRAND SPLICE ENCLOSURE FOR FIBER OPTIC CABLES.

SEE RACK ELEVATION DETAIL FOR ADDITIONAL INFORMATION.

a. 300-PAIR COPPER CABLE (CA14, 1001-1300)

b. 24-STRAND MULTIMODE (FOC, CB1, 61-84)

c. 24-STRAND MULTIMODE (BIT)

d. 6-STRAND SINGLE MODE (DISTRIBUTION ANTENNA

SYSTEM (DAS))

e. 12-STRAND SINGLE MODE (FOC 756D2, 1-12)

f. 48-STRAND SINGLE MODE (FOC 756D, 1-48)

g. 96-STRAND SINGLE MODE (FOC 756CORE, 1-96)

h. 12-STRAND SINGLE MODE BETWEEN DAVIS BARRACKS

AND BLDG 745C (GATE CONTROL)

i. 24-STRAND SINGLE MODE (FOC FROM BLDG 747) LABEL AS

SPARE

5. RE-INSTALL EXISTING 48-STRAND SINGLE MODE FIBER CABLE

FROM HANDHOLE HH-1028 TO NEW COMMUNICATIONS

EQUIPMENT ROOM. TERMINATE EXISTING FIBER OPTIC CABLE

IN NEW 2RU CCH PATCH PANEL WITH FACTORY TERMINATED

DUPLEX LC PIGTAILED SPLICE CASSETTES. CONTRACTOR

SHALL FIELD VERIFY EXISTING CABLE LENGTH AND PROVIDE

ALL NECESSARY EQUIPMENT REQUIRED TO RE-INSTALL

EXISTING CABLES FROM HANDHOLE HH-1028 TO NEW

COMMUNICATIONS ROOM. IF CABLE IS NOT LONG ENOUGH

THEN A NEW OSP FIBER CABLE SHALL BE SPLICED TO EXISTING

CABLE IN HANDHOLE HH-1028 USING A COYOTE BRAND SPLICE

ENCLOSURE. SEE RACK ELEVATION DETAIL FOR ADDITIONAL

INFORMATION.

6. INSTALL NEW 24-STRAND INDOOR/OUTDOOR RATED SINGLE-

MODE FIBER FROM BUILDING 756 TO BUILDING 600 USING

EXISTING UNDERGROUND DUCTBANK AND MANHOLE

SYSTEM FOR DAS. TERMINATE BOTH ENDS OF DAS FIBER ONTO

SC/APC CONNECTORS. FIBER OPTIC CABLE SHALL BE

INSTALLED CONTINUOUS THROUGH EXISTING DUCT AND

MANHOLE SYSTEM WITHOUT SPLICES.

GRAPHICS SCALE

100' 150' 200'50'

SCALE: 1/50" = 1'-0"

1" = 50'-0"1

TELECOM - OVERALL SITE PLAN

TRUNK ROOM

B022

STAIR 4

S-0-4

ELEV2 MACH

RM

B024

SUBSTATION

RM

B020b

EXIT

B021

T-400

T-400

W

W

(4)4" CONDUIT SLEEVES

(3)4" CONDUIT SLEEVES

ELEV 11

B025

FURNITURE

STORAGE

B019

CORRIDOR 07

B026

TELECOM

B018

TRUNK ROOM

B023

ELECTRICAL

B020a

STEAM

TUNNEL

B027

8"x2"

8"x2"

W

(4)4" CONDUIT SLEEVES

12"X4"

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART A

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-101

B A

S E

M E

N T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

A

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

BASEMENT FLOOR PLAN - TELECOM - PART A

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART A'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 CABLE BASKET TRAY ABOVE ACCESSIBLE CEILING.

REFER TO PLANS FOR DIMENSIONS. CONTRACTOR

SHALL COORDINATE WITH ALL TRADES PRIOR TO

ROUGH-IN.

2 SEAL ALL CONDUIT WALL PENETRATIONS USING

GROUT, SILICONE OR OTHER SEALANTS THAT MEET

THE TEMPERATURE AND DAMP ENVIRONMENT OF

THE STEAM TUNNEL.

STAIR 3

S-0-3

ELEV1 MACH

RM

B014

STEAM

TUNNEL

B027

W

WAP

CORRIDOR 05

B032

TRUNK ROOM

B009

GAME ROOM

B010

STORAGE

B015

JANITOR

OFFICE

B017

JANITOR

SUITE

B016a

WOMENS RM

B013

MENS RM

B012

1/2

1/2

1/2

1/2

1/2

12"X4" 12"X4"

12"X4"

12"X4"

1/2

W

JANITOR

SUPPLY

CLOSET

B016b

12"X4"

WAP

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART B

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-102

B A

S E

M E

N T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

B

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

BASEMENT FLOOR PLAN - TELECOM - PART B

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART A'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE

CEILING. REFER TO PLANS FOR DIMENSIONS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN.

2 SEAL ALL CONDUIT WALL PENETRATIONS USING

GROUT, SILICONE OR OTHER SEALANTS THAT MEET

THE TEMPERATURE AND DAMP ENVIRONMENT OF

THE STEAM TUNNEL.

3 WIRELESS ACCESSPOINT FOR CATV SERVICE.

PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH

CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER

DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.

B004

STAIR 2

S-0-2

AREAWAY

B007b

T-400

T-400

W

W

W

(4)4" CONDUIT SLEEVES

(4)4"

CONDUIT

SLEEVES

(4)4" CONDUIT

SLEEVES

WAP

JANITOR

B033

CORRIDOR 04

B034

COMMUNICATION

ROOM

B005

MECHANICAL

ROOM

B007a

ELECTRICAL

ROOM

B006a

FIRE PUMP

ROOM

B008

SUBSTATION

RM

B006b

W

CORRIDOR 05

B032

GAME ROOM

B010

1/2

1/2

1/2

1/2

18"x2" 18"x2"

12"X4" 12"X4" 12"X4" 8"x2"

12"X4"

6 6

(4)4" CONDUITS9

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART C

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-103

B A

S E

M E

N T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

C

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

BASEMENT FLOOR PLAN - TELECOM - PART C

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 PROVIDE NEW PULL BOX AND EXTEND EXISTING (2)4”

SERVICE CONDUITS TO NEW COMMUNICATION

ROOM. SIZE PULL BOX PER TIA AND NEC

REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”

INTO NEW COMM ROOM. PROVIDE WATERFALL

DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON

END OF CONDUITS IN COMM ROOM.

2 PROVIDE (2) NEW 4” CONDUITS FROM NEW PULL BOX

AND EXTEND ABOVE ACCESSIBLE CEILING BACK TO

NEW COMM ROOM. PROVIDE WATERFALL DEVICE

PANDUIT CDF400 OR APPROVED EQUAL ON END OF

CONDUIT IN COMM ROOM.

3 COORDINATE EXACT LOCATION OF DATA DROP FOR

CONNECTION TO EMCS/BMS SYSTEM WITH MC

PRIOR TO ROUGH-IN.

4 PROVIDE NEW METAL PULL BOX, SIZE PER TIA AND

NEC REQUIREMENTS.

5 CABLE LADDER TRAY. REFER TO PLANS FOR

DIMENSIONS. CONTRACTOR SHALL COORDINATE

WITH ALL TRADES PRIOR TO ROUGH-IN. LADDER

TRAY SHALL BE COORDINATED WITH CONDUIT

SLEEVE LOCATIONS THROUGH FIRST FLOOR.

6 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE

CEILING. REFER TO PLANS FOR DIMENSIONS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN.

7 INSTALL CONDUIT WATERFALL DEVICE ON TELECOM

ROOM SIDE OF CONDUIT SLEEVES, USE PANDUIT

CDF400 OR APPROVED EQUAL.

8 TWO VOICE DROPS. COORDINATE EXACT LOCATION

OF FIRE ALARM CONTROL PANEL WITH FIRE ALARM

CONTRACTOR.

9 PROVIDE NEW PULL BOX AND EXTEND EXISTING (4)4”

SERVICE CONDUITS TO NEW COMMUNICATION

ROOM. SIZE PULL BOX PER TIA AND NEC

REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”

INTO NEW COMM ROOM. PROVIDE WATERFALL

DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON

END OF CONDUITS IN COMM ROOM.

# KEYED NOTES:

1 PROVIDE NEW PULL BOX AND EXTEND EXISTING (2)4”

SERVICE CONDUITS TO NEW COMMUNICATION

ROOM. SIZE PULL BOX PER TIA AND NEC

REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”

INTO NEW COMM ROOM. PROVIDE WATERFALL

DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON

END OF CONDUITS IN COMM ROOM.

2 PROVIDE (2) NEW 4” CONDUITS FROM NEW PULL BOX

AND EXTEND ABOVE ACCESSIBLE CEILING BACK TO

NEW COMM ROOM. PROVIDE WATERFALL DEVICE

PANDUIT CDF400 OR APPROVED EQUAL ON END OF

CONDUIT IN COMM ROOM.

3 COORDINATE EXACT LOCATION OF DATA DROP FOR

CONNECTION TO EMCS/BMS SYSTEM WITH MC

PRIOR TO ROUGH-IN.

4 PROVIDE NEW METAL PULL BOX, SIZE PER TIA AND

NEC REQUIREMENTS.

5 CABLE LADDER TRAY. REFER TO PLANS FOR

DIMENSIONS. CONTRACTOR SHALL COORDINATE

WITH ALL TRADES PRIOR TO ROUGH-IN. LADDER

TRAY SHALL BE COORDINATED WITH CONDUIT

SLEEVE LOCATIONS THROUGH FIRST FLOOR.

6 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE

CEILING. REFER TO PLANS FOR DIMENSIONS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN.

7 INSTALL CONDUIT WATERFALL DEVICE ON TELECOM

ROOM SIDE OF CONDUIT SLEEVES, USE PANDUIT

CDF400 OR APPROVED EQUAL.

8 TWO VOICE DROPS. COORDINATE EXACT LOCATION

OF FIRE ALARM CONTROL PANEL WITH FIRE ALARM

CONTRACTOR.

9 PROVIDE NEW PULL BOX AND EXTEND EXISTING (4)4”

SERVICE CONDUITS TO NEW COMMUNICATION

ROOM. SIZE PULL BOX PER TIA AND NEC

REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”

INTO NEW COMM ROOM. PROVIDE WATERFALL

DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON

END OF CONDUITS IN COMM ROOM.

B001

TRUNK ROOM

B003

STAIR 1

S-0-1

TRUNK ROOM

B002

CORRIDOR 02

B035

8"x2" 8"x2"

1 1

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

PART DKEY PLAN

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-104

B A

S E

M E

N T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

D

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

BASEMENT FLOOR PLAN - TELECOM -PART D

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE

CEILING. REFER TO PLANS FOR DIMENSIONS.

TYPICAL. CONTRACTOR SHALL COORDINATE WITH

ALL TRADES PRIOR TO ROUGH-IN.

CADET RM.

B1035

STAIR 4

S-1-4

ELEV 11

B117

CADET RM.

B1034

MENS ROOM

B116

WOMENS

ROOM

B115

UNISEX TLT.

B114

JANITOR

B113

TELECOM

B111

ELECTRICAL

B112

STORAGE

B118

CADET RM.

B1024

CADET RM.

B1025

CADET RM.

B1026

CADET RM.

B1027

CADET RM.

B1029

VESTIBULE

B119b

CADET RM.

B1031

CADET RM.

B1032

CADET RM.

B1033

CADET RM.

B1036

CADET RM.

B1037

CADET RM.

B1038

CADET RM.

B1040

CADET RM.

B1041

CADET RM.

B1039

CADET RM.

B1042

CADET RM.

B1043

CADET RM.

B1028CORRIDOR 02

B121

CORRIDOR 02

B119a

CORRIDOR 02

B120

EXIT

B151

CORRIDOR 02

B150

T-401

T-401

W

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

WAP

WAP

WAP

WAP

WAP

WAP

WAP

(3)4" CONDUIT SLEEVES

61 CABLES

139 CABLES

(2)4" CONDUIT SLEEVES

1 1

W

1/2

WAP

WAP

1/2

WAP

W

1/2

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART A

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-111

F

IR

S T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

A

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

FIRST FLOOR PLAN - TELECOM - PART A

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR

SHALL COORDINATE WITH ALL TRADES PRIOR TO

ROUGH-IN. REFER TO J-HOOK DETAIL FOR

ADDITIONAL INFORMATION. COORDINATE J-HOOK

LOCATIONS WITH CEILING ACCESS PANELS IN GWB

CEILINGS IN CORRIDORS.

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART A'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

S-1-3

ELEV 12

B110

LAUNDRY

B109

COLLAB. RM.

B125a

ORDERLY RM.

B1050

CADET RM.

B1021

CADET RM.

B1049

JANITOR

B124

CORRIDOR 01

B123

CADET RM.

B1048

CADET RM.

B1047

STORAGE

B125b

CADET RM.

B1053

CADET RM.

B1052

CADET RM.

B1051

CADET RM.

B1046

CADET RM.

B1020

MENS ROOM

B108

SALLY PORT

B122b

CORRIDOR 01

B122a

CORRIDOR 01

B128

1/21/2

1/2

1/2 1/2

1/2

1/2

1/21/2

1/2

1/2

1/21/2

1/2

1/2

1/21/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

WAP

WAP

WAP

WAP WAP

1/2

1/2

1/2

1/2

CORRIDOR 01

B127

WAP

WAP

3 3 3 3

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART B

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-112

F

IR

S T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

B

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

FIRST FLOOR PLAN - TELECOM - PART B

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR

SHALL COORDINATE WITH ALL TRADES PRIOR TO

ROUGH-IN. REFER TO J-HOOK DETAIL FOR

ADDITIONAL INFORMATION. COORDINATE J-HOOK

LOCATIONS WITH CEILING ACCESS PANELS IN GWB

CEILINGS IN CORRIDORS.

2 WIRELESS ACCESSPOINT FOR CATV SERVICE.

PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH

CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER

DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.

3 ROUTE CONDUIT FOR POKE-THRU DEVICE TO BASKET

CABLE TRAY ON BASEMENT FLOOR.

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

TELECOM

B104

ELECTRICAL

B105STAIR 2

S-1-2

MENS ROOM

B103

WOMENS

ROOM

B102

WOMENS

ROOM

B107

CADET RM.

B1054

CADET RM.

B1056

CADET RM.

B1055

CADET RM.

B1058

CADET RM.

B1057

CADET RM.

B1060

CADET RM.

B1059

CADET RM.

B1062

CADET RM.

B1061

CADET RM.

B1063

CADET RM.

B1010

CADET RM.

B1011

CADET RM.

B1012

CADET RM.

B1013

CADET RM.

B1014VESTIBULE

B126b

CADET RM.

B1016

CADET RM.

B1017

CADET RM.

B1018

CADET RM.

B1019

CORRIDOR 01

B127

T-401

T-401

W

1/2

1/21/2 1/2 1/2

1/2

1/2

1/2 1/2 1/2 1/2

1/2 1/2

1/2 1/2

1/2 1/2

1/2 1/2

1/2 1/2 1/2 1/2

1/2

1/2

1/2 1/2 1/2

1/21/2

1/21/2

1/2

1/2

1/21/2

1/2

1/2 1/2

1/21/2

1/2

1/21/2

1/2

1/21/2

1/2

1/2

1/21/2

1/21/2

1/2

1/2

1/2 1/2

1/2

1/2

W

WAP WAP WAP WAP WAP

WAP WAP WAP WAP WAP

(3)3" CONDUIT SLEEVES

(4)4" CONDUIT SLEEVES CORRIDOR 01

B126a

CORRIDOR 01

B123

100 CABLES 142 CABLES

154 CABLES127 CABLES

(3)4" CONDUIT

SLEEVES

(2)3" CONDUIT SLEEVES

(3)3" CONDUIT SLEEVES

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART C

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-113

F

IR

S T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

C

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

FIRST FLOOR PLAN - TELECOM - PART C

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK

DETAIL FOR ADDITIONAL INFORMATION.

COORDINATE J-HOOK LOCATIONS WITH CEILING

ACCESS PANELS IN GWB CEILINGS IN CORRIDORS.

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK

DETAIL FOR ADDITIONAL INFORMATION.

COORDINATE J-HOOK LOCATIONS WITH CEILING

ACCESS PANELS IN GWB CEILINGS IN CORRIDORS.

STAIR 1

S-1-1

CADET RM.

B1071

CADET RM.

B1074

CADET RM.

B1073

STORAGE

B130

STORAGE

B131

CADET RM.

B1064

CADET RM.

B1066

CADET RM.

B1065

CADET RM.

B1068

CADET RM.

B1067

CADET RM.

B1070

CADET RM.

B1069

CADET RM.

B1072

CADET RM.

B1001

CADET RM.

B1005

CADET RM.

B1006

CADET RM.

B1003

VESTIBULE

B126c

CADET RM.

B1002

CADET RM.

B1007

CADET RM.

B1008

CADET RM.

B1009

MENS ROOM

B101

1/2

1/2

1/2

1/2 1/2 1/2 1/2

1/2

1/2

1/2 1/2 1/2 1/2 1/2 1/2

1/2

1/2 1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/21/2

1/21/2

1/2

1/2

1/21/2

1/21/2

1/2

1/21/2

1/2

1/2

1/21/2

1/2

1/21/2

1/2

1/2

1/21/2

1/2

1/2

1/2

1/2

1/2

1/2

WAP WAP WAP WAP

WAP WAP WAP WAP WAP

WAP

CORRIDOR 01

B128

CORRIDOR 01

B127

CORRIDOR 01

B126a

WOMENS

ROOM

B102

1/2

(2)4" CONDUIT SLEEVES

1/2

1/2

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

PART DKEY PLAN

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-114

F

IR

S T

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

D

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

FIRST FLOOR PLAN - TELECOM - PART D

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK

DETAIL FOR ADDITIONAL INFORMATION.

B2035

STAIR 4

S-2-4

ELEV 11

B217

CADET RM.

B2034

MENS ROOM

B216

WOMENS

ROOM

B215

UNISEX TLT.

B214

JANITOR

B213

TELECOM

B211

ELECTRICAL

B212

STORAGE

B218

CADET RM.

B2024

CADET RM.

B2025

CADET RM.

B2026

CADET RM.

B2027

CADET RM.

B2029

CADET RM.

B2030

CADET RM.

B2031

CADET RM.

B2032

CADET RM.

B2033

CADET RM.

B2036

CADET RM.

B2037

CADET RM.

B2038

CADET RM.

B2040

CADET RM.

B2041

CADET RM.

B2039

CADET RM.

B2042

CADET RM.

B2043

CADET RM.

B2028

CORRIDOR 02

B219

CORRIDOR 02

B220

CORRIDOR 02

B221

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/21/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

T-402

T-402

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

(3)4" CONDUIT SLEEVES

(3)4" CONDUIT SLEEVES

1/2

1/2

1/2

1/2

155 CABLES

200 CABLES

W

W

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART A

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-121

S E

C O

N D

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

A

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

SECOND FLOOR PLAN - TELECOM - PART A

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR

SHALL COORDINATE WITH ALL TRADES PRIOR TO

ROUGH-IN. REFER TO J-HOOK DETAIL FOR

ADDITIONAL INFORMATION. COORDINATE J-HOOK

LOCATIONS WITH CEILING ACCESS PANELS IN GWB

CEILINGS IN CORRIDORS.

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART A'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

S-2-3

ELEV 12

B210

MENS ROOM

B208

LAUNDRY

B209

COLLAB. RM.

B225a

ORDERLY RM.

B2050

CADET RM.

B2021

CADET RM.

B2049

STORAGE

B224

CADET RM.

B2048

CADET RM.

B2047

STORAGE

B225b

CADET RM.

B2053

CADET RM.

B2052

CADET RM.

B2051

CADET RM.

B2046

CADET RM.

B2045

CADET RM.

B2020

CADET RM.

B2023

CADET RM.

B2022

CADET RM.

B2044

CORRIDOR 01

B222

CORRIDOR 01

B223

1/2 1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2

1/2

WAP

WAP

WAP

WAP

WAP

WAPWAP

1/2

1/2

1/2

1/2

1/2

WAP

WAP

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART B

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-122

S E

C O

N D

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

B

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

SECOND FLOOR PLAN - TELECOM - PART B

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR

SHALL COORDINATE WITH ALL TRADES PRIOR TO

ROUGH-IN. REFER TO J-HOOK DETAIL FOR

ADDITIONAL INFORMATION. COORDINATE J-HOOK

LOCATIONS WITH CEILING ACCESS PANELS IN GWB

CEILINGS IN CORRIDORS.

2 WIRELESS ACCESSPOINT FOR CATV SERVICE.

PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH

CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER

DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART A'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

B204

ELECTRICAL

B205

JANITOR

B206

STAIR 2

S-2-2 MENS ROOM

B203

WOMENS

ROOM

B202

WOMENS

ROOM

B207

CORRIDOR 01

B226

CADET RM.

B2054

CADET RM.

B2056

CADET RM.

B2055

CADET RM.

B2058

CADET RM.

B2057

CADET RM.

B2060

CADET RM.

B2059

CADET RM.

B2062

CADET RM.

B2061

CADET RM.

B2063

CADET RM.

B2010

CADET RM.

B2011

CADET RM.

B2012

CADET RM.

B2013

CADET RM.

B2014

CADET RM.

B2015

CADET RM.

B2016

CADET RM.

B2017

CADET RM.

B2018

CADET RM.

B2019

CORRIDOR 01

B227

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2 1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/21/2

1/2

1/21/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2 1/2

1/2

T-402

T-402

1/2

W

WAP WAP WAP WAP WAP

WAPWAPWAPWAPWAP

(4)3" CONDUIT SLEEVES

(4)4" CONDUIT SLEEVES(3)4" CONDUIT SLEEVES60 CABLES

160 CABLES

60 CABLES

1/2

364 CABLES 144 CABLES

(2)3" CONDUIT SLEEVES

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART C

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-123

S E

C O

N D

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

C

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

SECOND FLOOR PLAN - TELECOM - PART C

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK

DETAIL FOR ADDITIONAL INFORMATION.

S-2-1

JANITOR

B229

MENS ROOM

B201

CADET RM.

B2072

STORAGE

B230

FIRE PANEL

ROOM

B231

CADET RM.

B2064

CADET RM.

B2066

CADET RM.

B2065

CADET RM.

B2068

CADET RM.

B2067

CADET RM.

B2070

CADET RM.

B2069

CADET RM.

B2071

CADET RM.

B2001

CADET RM.

B2005

CADET RM.

B2006

CADET RM.

B2004

CADET RM.

B2007

CADET RM.

B2008

CADET RM.

B2009

CADET RM.

B2002

CADET RM.

B2003

CORRIDOR 01

B228

1/2

1/2

1/2

1/2

1/2 1/2

1/21/2

1/2

1/2

1/2

1/2

1/21/2

1/2

1/2

1/2

1/2

1/21/2

1/2

1/2 1/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/21/2

1/2

1/2

1/2 1/2

1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

WAP WAP WAP WAP WAP

WAP

WAPWAPWAPWAPWAP

1/2

WOMENS

ROOM

B202

1/2

1/2

1/2

CADET RM.

B2073

CADET RM.

B2074

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

PART DKEY PLAN

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-124

S E

C O

N D

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

D

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

SECOND FLOOR PLAN - TELECOM - PART D

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART C'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

DROP CEILING); COORDINATE CEILING TYPES AND

LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS.

CONTRACTOR SHALL COORDINATE WITH ALL

TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK

DETAIL FOR ADDITIONAL INFORMATION.

B3035

STAIR 4

S-3-4

ELEV 11

B317

CADET RM.

B3034

MENS ROOM

B316

WOMENS

ROOM

B315

UNISEX TLT.

B314

JANITOR

B313

TELECOM

B311

ELECTRICAL

B312

STORAGE

B318

CADET RM.

B3024

CADET RM.

B3025

CADET RM.

B3026

CADET RM.

B3027

CADET RM.

B3029

CADET RM.

B3030

CADET RM.

B3031

CADET RM.

B3032

CADET RM.

B3033

CADET RM.

B3036

CADET RM.

B3037

CADET RM.

B3038

CADET RM.

B3040

CADET RM.

B3041

CADET RM.

B3039

CADET RM.

B3042

CADET RM.

B3043

CADET RM.

B3028

CORRIDOR 02

B319

CORRIDOR 02

B320

CORRIDOR 02

B321

T-403

T-403

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

W

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

(3)4" CONDUIT SLEEVES

(3)4" CONDUIT SLEEVES

155 CABLES

W

200 CABLES

1/2

1/2

1/2

1/2

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART A

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-131

T H

IR

D

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

A

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

THIRD FLOOR PLAN - TELECOM - PART A

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR

SHALL COORDINATE WITH ALL TRADES PRIOR TO

ROUGH-IN. REFER TO J-HOOK DETAIL FOR

ADDITIONAL INFORMATION. COORDINATE J-HOOK

LOCATIONS WITH CEILING ACCESS PANELS IN GWB

CEILINGS IN CORRIDORS.

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART A'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

S-3-3

ELEV 12

B310

MENS ROOM

B308

LAUNDRY

B309

COLLAB. RM.

B325a

ORDERLY RM.

B3050

CADET RM.

B3021

CADET RM.

B3049

STORAGE

B324

CADET RM.

B3048

CADET RM.

B3047

STORAGE

B325b

CADET RM.

B3053

CADET RM.

B3052

CADET RM.

B3051

CADET RM.

B3046

CADET RM.

B3045

CADET RM.

B3020

CADET RM.

B3023

CADET RM.

B3022

CADET RM.

B3044

CORRIDOR 01

B322

CORRIDOR 01

B323

1/21/2

1/2

1/2 1/2

1/2

1/2

1/21/2

1/2

1/2

1/21/2

1/2

1/2

1/2

1/21/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

WAP

WAP

WAPWAP

WAP

WAP

WAP

1/2

1/2

1/2

1/2

WAP

WAP

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART B

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-132

T H

IR

D

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

B

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

R K

N

Y

D A

P A

L

J E

D

/2

/1

W D

S -1

-D

-0

100% FINAL DESIGN SUBMISSION

C B

U P

B R

A D

L E

Y B

A R

R A

C K

S

F Y

P

N

1/8" = 1'-0"1

THIRD FLOOR PLAN - TELECOM - PART B

# KEYED NOTES:

1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLING AND

COORDINATING ALL CABLE ROUTING. CABLE

ROUTING SHOWN FOR REFERENCE ONLY. CABLES

SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR

SHALL COORDINATE WITH ALL TRADES PRIOR TO

ROUGH-IN. REFER TO J-HOOK DETAIL FOR

ADDITIONAL INFORMATION. COORDINATE J-HOOK

LOCATIONS WITH CEILING ACCESS PANELS IN GWB

CEILINGS IN CORRIDORS.

2 WIRELESS ACCESSPOINT FOR CATV SERVICE.

PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH

CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER

DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.

GENERAL NOTES:

A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS

"PART" SHALL BE ROUTED BACK TO THE TELECOM

RM ON THIS FLOOR LOCATED IN "PART A'.

B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO

THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT

B304

ELECTRICAL

B305

JANITOR

B306

STAIR 2

S-3-2

MENS ROOM

B303

WOMENS

ROOM

B302

WOMENS

ROOM

B307

CORRIDOR 01

B326

CADET RM.

B3054

CADET RM.

B3056

CADET RM.

B3055

CADET RM.

B3058

CADET RM.

B3057

CADET RM.

B3060

CADET RM.

B3059

CADET RM.

B3062

CADET RM.

B3061

CADET RM.

B3063

CADET RM.

B3010

CADET RM.

B3011

CADET RM.

B3012

CADET RM.

B3013

CADET RM.

B3014

CADET RM.

B3015

CADET RM.

B3016

CADET RM.

B3017

CADET RM.

B3018

CADET RM.

B3019

CORRIDOR 01

B327

T-403

T-403

1/2

1/21/2 1/2

1/2 1/2

1/2

1/2 1/2

1/2 1/2 1/2

1/2

1/2

1/2

1/2 1/2

1/2 1/2

1/2 1/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2 1/2

1/2

1/21/2

1/21/2

1/2

1/2

1/21/2

1/2

1/2 1/2

1/21/2

1/2

1/21/2

1/2 1/2

1/2

1/2

1/2

1/2

1/2

1/21/2

1/2

1/2

1/2 1/2

1/2

1/2

1/2

W

WAP WAP WAP WAP WAP

WAPWAPWAPWAPWAP

(4)4" CONDUIT SLEEVES(3)4" CONDUIT SLEEVES60 CABLES

160 CABLES

60 CABLES

144 CABLES

W

1/2

(4)3" CONDUITS SLEEVES

144 CABLES

(2)3" CONDUITS SLEEVES

WALL TYPE LEGEND

SMOKE PARTITION

1 HR PARTITION

2 HR PARTITION

SCALE: 1/8"=1'-0"

8 04 8

KEY PLAN PART C

A

B

C D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

PLAN NORTH

T-133

T H

IR

D

F L O

O R

P L A

N

T E

L E

C O

M

P A

R T

C

W E

S T

P O

IN

T

N

Y

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N

E W

Y O

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .