- DAS (DISTRIBUTED ANTENNA SYSTEM) expansion to Bradley Barracks Federal contract opportunity
- Solicitation number
- W911SD24R0128
About this file
This document appears to be a solicitation for a Distributed Antenna System (DAS) expansion to the Bradley Barracks at the United States Military Academy. The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis is the procuring agency.
The solicitation indicates that the existing DAS system does not meet the design standards due to the use of alternative building materials during the renovation process. The full solicitation details, including the required products and services, will be attached on SAM.gov. No specific response dates, award dates, pricing terms, or set asides are provided in this document. The solicitation seeks to address the DAS performance issues at the Bradley Barracks.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 170_Telecom - DAS_PA_SYSTEM - 1.pdf | ||
| Amendment Solicitation W911SD24R01280007.pdf | ||
| BRADLEY_IBWAVE_REDACT.pdf | ||
| Amendment Solicitation W911SD24R01280006.pdf | ||
| Amendment Solicitation W911SD24R01280005.pdf | ||
| Amendment Solicitation W911SD24R01280004.pdf | ||
| Amendment Solicitation W911SD24R01280003.pdf | ||
| Sign In Sheets 10 July 2024.pdf | ||
| Bradley Barracks DAS Draft Revised Solicitation 2.docx | DOCX document | |
| Amendment Solicitation W911SD24R0128.pdf | ||
| Bradley Barracks DAS Solicitation W911SD24R0128.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
DESCRIPTIONTYPE
AFC
AFF
AFG
BFC
C
EC
ETBD
ETR
ETBR
FA
FAAP
FACP
ABOVE FINISHED COUNTER
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
BELOW FINISHED CEILING
CONDUIT
ELECTRICAL CONTRACTOR
G OR GND
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
EXISTING TO BE RELOCATED
FIRE ALARM
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
GROUND
CR CARD READER
INTERCOM INTERCOMMUNICATION
J-BOX JUNCTION BOX
GC GENERAL CONTRACTOR
CLG CEILING
BET BUILDING ENTRANCE TERMINAL
NEC
POS
UON
W
WP
POINT OF SALE
UNLESS OTHERWISE NOTED
WATTS OR WIRE
WEATHERPROOF
P POLE
MD MOTION DETECTOR
MIC MICROPHONE
NATIONAL ELECTRICAL CODE
NTS NOT TO SCALE
OC ON CENTER
PA PUBLIC ADDRESS
PB PUSHBUTTON SWITCH
SPD SURGE PROTECTION DEVICE
TTB TELEPHONE TERMINAL BOARD
TC TELECOMMUNCATIONS CONTRACTOR
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
WG WIRE GUARD
PC PLUMBING CONTRACTOR
SPKR SPEAKER
MC MECHANICAL CONTRACTOR
SOG SLAB ON GRADE
LV LOW VOLTAGE
NIC NOT IN CONTRACT
ABBREVIATIONS
DESCRIPTIONTYPE
Cx EXISTING UNDERGROUND COMMUNICATIONS
ACS ACCESS CONTROL SYSTEM
NIPR
NON-CLASSIFIED INTERNET PROTOCOL
ROUTER NETWORK
GWB GYPSUM WALLBOARD
TYPE DESCRIPTION
SYMBOL LEGEND (NOTE: NOT ALL SYMBOLS ARE NECESSARILY USED ON PLANS)
TYPE DESCRIPTION
TERMINATE THREE (3) CATEGORY 6 CABLES ON RJ-45 JACKS, ONE (1) FOR VOICE AND TWO (2) FOR DATA.
ALSO PROVIDE ONE (1) UNUSED SPACE AND FILL WITH BLANK. PROVIDE 4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING AND 1" CONDUIT FROM THE OUTLET TO ABOVE CEILING TO ACCESSIBLE CEILING IN THE CORRIDOR, THEN CABLES SHALL BE ROUTED IN NON-CONTINUOUS CABLE SUPPORTS (J-
HOOKS) BACK TO NEAREST TELECOMMUNICATIONS ROOM. OUTLET MOUNTED 18" AFF, UON.
WALL PHONE. TERMINATE ONE (1) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J- BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM. VOICE OUTLET
MOUNTED 54" AFF, UON.
TELECOMMUNICATIONS TERMINATION BACKBOARD BY TC. PROVIDE 3/4" THICK x 8' HIGH x LENGTH PER PLANS, UON. BACKBOARD SHALL BE A-C GRADE FIRE RATED PLYWOOD WITH 'A' SIDE FACING
OUT.
TELECOMMUNICATIONS STYLE COPPER GROUND BAR BY EC. SUBSCRIPT "TMGB" DENOTES
TELECOM MAIN GROUND BAR. SUBSCRIPT "TGB" DENOTES TELECOM GROUND BAR.
TTB
4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING. J-BOX AND CONDUIT ROUGH-
IN BY EC.JJ
RACK/CABINET BY TC. SEE RACK ELEVATION DETAILS AND FLOOR PLANS FOR ADDITIONAL INFORMATION.
CABLE RUNWAY 18" WIDE. LOCATION AND LENGTH OF EACH TYPE SHALL BE PER ENLARGED TELECOM ROOM PLANS. PROVIDE ALL REQUIRED HARDWARE, MANUFACTURERED SWEEPING BENDS, HANGERS ETC. AND INSTALL PER MANUFACTURERS RECOMMENDATIONS. COORDINATION RUNWAY LOCATION WITH
OTHER DISCIPLINES. CABLE RUNWAY IN TELECOM ROOMS IS BY TC.
PROVIDE ONE (1) RG-6 COAXIAL CABLE WITH 'F' CONNECTOR FOR WALL-MOUNTED CABLE
TELEVISION OUTLET. ROUTE CABLE IN 1" CONDUIT FROM OUTLET TO TR ROOM. MOUNT
OUTLET 72" AFF, UON.
TV
CCTV CAMERA ROUGH-IN ONLY. CONTRACTOR TO PROVIDE 4-11/16" X 2-1/8" J-BOX WITH 1" CONDUIT WITH PULL STRING TO ABOVE NEAREST ACCESSIBLE CEILING. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATION AND CEILING TYPES. CAMERAS LOCATED IN LAY-IN (ACT) TYPE CEILINGS DO NOT
REQUIRE J-BOX AND CONDUIT ROUGH-IN AND ARE SHOWN FOR REFERENCE ONLY.
CAM
CARD READERCR
RX REQUEST TO EXIT BUTTON WALL MOUNTED AND TIED TO MAGLOCK POWER SUPPLY.
DOOR CONTACT OR DOOR POSITION SWITCH DEVICEDC
ML MAGNETIC LOCKING DEVICE. COORDINATE EXACT LOCATION AND REQUIREMENTS WITH GENERAL
CONTRACTOR(G.C.).
PIR REQUEST TO EXIT PASSIVE INFRARED DEVICE.
1/2
W
TERMINATE TWO (2) CATEGORY 6 CABLES ON RJ-45 JACKS, FOR DATA. PROVIDE 4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING AND 1" CONDUIT FROM THE OUTLET TO ABOVE CEILING TO ACCESSIBLE CEILING IN THE CORRIDOR, THEN CABLES SHALL BE ROUTED IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO NEAREST TELECOMMUNICATIONS ROOM . DATA OUTLET MOUNTED 18"
AFF, UON.
C PROVIDE WALL MOUNTED SAPLING SBL 3000 SERIES DIGITAL WIRELESS CLOCK, OR EQUAL. COORDINATE
LOACATION WITH SIMPLEX RECEPTACLE PROVIDED ON POWER PLANS.
WIRELESS ACCESS POINT OUTLET. NO FACEPLATE. FLUSH MOUNT TO GYPSUM BOARD CEILING WITH SINGLE GANG J-BOX. EXTEND CABLE IN 1" CONDUIT TO ABOVE ACCESSIBLE CEILING IN THE CORRIDOR, THEN EXTEND CABLES IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM (TR/TER). TERMINATE TWO (2) ORANGE JACKET CATEGORY 6A CABLES ON ORANGE RJ-45 JACKS.
OUTLET LABEL SHALL BE LOCATED ON THE CEILING AS CLOSE AS POSSIBLE TO THE LOCATION OF THE WAP
OUTLET.
WAP
ELEVATOR PHONE. TERMINATE ONE (1) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J-BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN
ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM
(TR/TER). VOICE OUTLET MOUNTED 54" AFF, UON. SUBSCRIPT DENOTES QUANTITY. ELEVATOR
MANUFACTURER SHALL PROVIDE EXTRA TRAVELER CABLE FOR PHONE IN ELEVATOR CAB.
BASKET TYPE CABLE TRAY. REFER TO PLANS FOR DIMENSIONS. SEE FLOOR PLANS FOR LOCATION AND LENGTH/WIDTH. PROVIDE ALL REQUIRED HARDWARE, MAUFACTURERED SWEEPING BENDS, HANGERS ETC. AND INSTALL PER MANUFACTURERS RECOMMENDATIONS. COORDINATE CABLE TRAY LOCATION
WITH OTHER DISCIPLINES. CABLE TRAY SHALL BE PROVIDED AND INSTALLED BY E.C.
EL ELECTRIC LOCKING DEVICE. ELECTRONIC LOCKING HARDWARE PROVIDED AND INSTALLED BY GC.
S CEILING MOUNTED PA SPEAKER.
DAS ANTENNADA
LMR ANTENNALA
TERMINATE THREE (3) CATEGORY 6 CABLES ON RJ-45 JACKS, ONE (1) FOR VOICE AND TWO (2) FOR DATA.
ALSO PROVIDE ONE (1) UNUSED SPACE AND FILL WITH BLANK. PROVIDE 4-11/16" SQ BY 2-1/8" DEEP J-BOX WITH SINGLE GANG MUD RING AND 1" CONDUIT FROM THE OUTLET TO ABOVE CEILING TO ACCESSIBLE CEILING IN THE CORRIDOR, THEN CABLES SHALL BE ROUTED IN NON-CONTINUOUS CABLE SUPPORTS (J-
HOOKS) BACK TO NEAREST TELECOMMUNICATIONS ROOM . OUTLET MOUNTED 36" AFF, UON.
1/2
CABLE ROUTING. CABLES SHALL BE SUPPORTED BY J-HOOKS ALONG PROPOSED CABLE ROUTE. REFER TO J-HOOK DETAIL FOR ADDITIONAL INFORMATION. TC SHALL COORDINATE J-HOOK LOCATIONS WITH
OTHER TRADES PRIOR TO ROUGH-IN.
TERMINATE ONE (1) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J-BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN ROUTE IN NON- CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM (TR/TER). VOICE
OUTLET MOUNTED 72" AFF, UON.
FIRE ALARM PHONE. TERMINATE ONE (2) CATEGORY 6 CABLE ON RJ-45 JACK IN A SINGLE GANG 2-1/8" DEEP J-BOX. ROUTE CABLE IN 1" CONDUIT FROM THE OUTLET TO ABOVE ACCESSIBLE CEILING, THEN ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM .
COORDINATE MOUNTING HEIGHT WITH FIRE ALARM CONTRACTOR.
PT
POKE-THRU DEVICE PROVIDED UNDER ELECTRICAL CONTRACT. TELECOM CONTRACTOR TO PROVIDE ALL CONNECTORS AND FACE PLATE AS REQUIRED. TERMINATE TWO (2) CATEGORY 6 CABLES ON RJ-45 JACKS.
PROVIDE 1" CONDUIT FROM POKE-THUR TO NEAREST ACCESSIBLE CEILING ON FLOOR BELOW. THEN ROUTE IN NON-CONTINUOUS CABLE SUPPORTS (J-HOOKS) BACK TO TELECOMMUNICATIONS ROOM ON
FLOOR BELOW.
A. ALL TELECOMMUNICATIONS WORK SHALL CONFORM TO THE LATEST ANSI/TIA, LATEST EDITION BICSI TDMM DESIGN MANUAL, NATIONAL
ELECTRICAL CODE, IBC REQUIREMENTS, UFC STANDARDS & LOCAL REQUIREMENTS.
B. PRIOR TO ACCOMPLISHING ANY WORK IN ANY AREA, ALL WORK SHALL BE PLANNED AND COORDINATED WITH OTHER TRADES AND THE
GOVERNMENT.
C. IT SHALL BE THE TELECOM CONTRACTORS RESPONSIBILITY TO COORDINATE WITH THE TELEPHONE AND/OR CATV SERVICE PROVIDER
TO ENSURE TIMELY DELIVERY OR PERMANENT TELEPHONE AND/OR CATV SERVICE.
D. TELECOMMUNICATION RACKS, CABLE RUNWAYS AND ALL ACCESSORIES WITHIN THE TER AND TR ROOMS SHALL BE PROVIDED AND
INSTALLED BY THE TELECOMMUNICATIONS CONTRACTOR.
E. A MAXIMUM 40% FILL RATIO IS ALLOWED FOR ALL CONDUIT SIZES.
F. A PULL CORD (NYLON; 200LB STRENGTH, 1/8-INCH MINIMUM) SHALL BE CO-INSTALLED WITH ALL BACKBONE CABLES INSTALLED IN ANY
CONDUIT LONGER THAN FIFTEEN (15) FEET.
G. E.C. SHALL PROVIDE PULL CORD (NYLON; 200LB STRENGTH, 1/8-INCH MINIMUM) WITH CABLES IN ALL CONDUITS 2" AND LARGER.
H. A PULL CORD (NYLON; 200LB STRENGTH, 1/8-INCH MINIMUM) SHALL BE INSTALLED IN ANY EMPTY TELECOM CONDUITS.
I. WHERE BACKBONE CABLES AND HORIZONTAL DISTRIBUTION CABLES ARE INSTALLED IN A CABLE TRAY OR WIREWAY, BACKBONE
CABLES SHALL BE BUNDLED SEPARATELY FROM THE HORIZONTAL DISTRIBUTION CABLES
J. ALL CABLES INSTALLED IN THE CEILING CAVITY SHALL BE PLENUM RATED UNLESS OTHERWISE NOTED.
K. ALL CABLES INSTALLED IN CONDUIT BELOW SLAB OR UNDERGROUND SHALL BE RATED FOR WET CONDITIONS.
L. NO CABLING SHALL BE LAID ON CEILING GRID PER THE NEC OR ANSI/TIA 569-D. CABLING SHALL MAINTAIN A MINIMUM 5” SEPARATION
FROM ANY LIGHT FIXTURE PER ANSI/TIA 569-D AND 12” FROM ANY EMI ENDUCING EQUIPMENT. RODS OR WIRES CURRENTLY USED TO SUPPORT OTHER STRUCTURAL (CEILING GRID), MECHANICAL (PIPES OR DUCTWORK) AND ELECTRICAL (LIGHT FIXTURES OR CONDUITS) SHALL NOT BE UTILIZED AS ATTACHMENT POINTS FOR NON-CONTINUOUS SUPPORTS (J-HOOKS) PER ANSI/TIA 569-D.
USE PLENUM RATED TIE-WRAPS ABOVE ACCESSIBLE CEILINGS AND VELCRO WRAPS BELOW ACCESSIBLE CEILINGS.
M. TC SHALL USE CABLE TRAYS AND CONDUIT SLEEVES AS THEIR PATHWAY THROUGHOUT MOST OF THE BUILDING U.O.N. IN AREAS WHERE SUPPORT STRUCTURE IS NOT AVAILABLE , CABLES SHALL BE SUPPORTED WITH METALLIC J-HOOKS EVERY 4-FEET OR LESS AND HAVE A MINIMUM 3 INCH VERTICAL CLEARANCE FROM THE CEILING GRID AND TILE. CABLES SHALL NOT BE SUPPORTED IN AREAS WHERE CABLE IS SUSCEPTIBLE TO DAMAGE OR EMI. CABLES SHALL BE NEATLY GROOMED WHEN INSTALLED IN J-HOOKS.
N. HORIZONTAL DISTRIBUTION CABLES SHALL BE BUNDLED IN GROUPS OF NO MORE THAN 40 CABLES. THIS INCLUDES CABLE BUNDLES
SUPPORTED IN J-HOOKS.
O. ALL PENETRATIONS THROUGH WALLS AND FLOOR SHALL BE SLEEVED.
P. STUDY ALL DRAWINGS, MANUFACTURER'S INSTRUCTIONS, UL LISTINGS, AND CATALOG DATA TO DETERMINE HOW EQUIPMENT
ACCESSORIES AND RELATED ITEMS ARE TO BE SUPPORTED, MOUNTED, OR SUSPENDED. PROVIDE ALL BOLTS, INSERTS, BRACKETS, SPACERS, STRUCTURAL SUPPORTS, AND ACCESSORIES FOR PROPER SUPPORT OF CABLES FURNISHED UNDER THIS CONTRACT.
Q. TC SHALL PROVIDE BONDING FOR CABLE RUNWAYS, CABLE TRAYS, RACKS, EQUIPMENT IN RACKS, ARMORED CABLES, AND HOUSINGS WITH #6 AWG STRANDED INSULATED GREEN JACKET CONDUCTOR WITH DUAL HOLE EXOTHERMIC OR COMPRESSION LUG. EC SHALL PROVIDE TMGB, TGB AND ALL OTHER GROUNDING AND BONDING FOR TELECOMMUNICATIONS. BONDING AND GROUNDING SHALL BE PER NFPA 70 (NEC), BICSI TDMM DESIGN MANUAL AND ANSI/TIA-607-C COMMERCIAL BUILDING GROUNDING AND BONDING
REQUIREMENTS FOR TELECOMMUNICATIONS.
R. ALL HORIZONTAL COPPER, FIBER AND COAXIAL CABLE INSTALLATIONS SHALL CONFORM TO THE LATEST ANSI/TIA-568 STANDARDS.
S. ALL LABELING SHALL COMPLY WITH LATEST ANSI/TIA-606 AND LOCAL STANDARDS.
T. ALL TELECOMMUNICATIONS CONDUITS SHALL NOT BE INSTALLED ADJACENT TO ANY HEAT SOURCE SUCH AS; BOILERS, HEATERS
(ELECTRIC OR GAS), HOT WATER LINES, STEAM LINES ETC.
U. ALL TELECOM CONDUIT ENDS SHALL BE REAMED AND FIT WITH AN INSULATED BUSHING BY EC.
V. ALL FLOOR SLEEVES AND CONDUIT PENETRATIONS BY EC THROUGH THE FLOOR SHALL PROTRUDE A MINIMUM 4" ABOVE THE FINISHED
FLOOR.
W. EC SHALL PROVIDE FIRE PENETRATION SYSTEM FOR ALL TELECOM PATHWAYS AND SLEEVES. TC SHALL PROVIDE FIRE PENETRATION
FOR ANY ANNULAR OPENINGS OF PATHWAYS AFTER CABLES HAVE BEEN INSTALLED AND TESTED.
X. REFER TO TELECOMMUNICATIONS RISER DIAGRAM FOR ADDITIONAL INFORMATION.
Y. CONDUIT RUNS BETWEEN (2) PULL POINTS OR JUNCTION BOXES SHALL NOT HAVE AN AGGREGATE OF BENDS GREATER THAN 180
DEGREES.
Z. ALL CONDUIT RUNS SHALL BE BONDED OR GROUNDED BY EC ON ONE OR BOTH ENDS.
AA. MAINTAIN MINIMUM 3' CLEARANCE ON ONE SIDE OF CABLE TRAY AND MINIMUM OF 12" ON OPPOSITE SIDE. MAINTAIN 12" CLEARANCE
FROM ALL HVAC, LIGHTS, AND STRUCTURE ON TOP AND BOTTOM OF CABLE TRAY. CABLE TRAY SHALL NOT BE RUN PARALLEL BELOW
ANY WATER OR SANITARY PIPES.
BB. ALL EXPOSED CABLES IN THE TELECOM EQUIPMENT ROOM (TER) AND TELECOM ROOMS (TR) SHALL BE INSTALLED INSIDE POLYETHYLENE TEREPHTHALATE (PET) EXPANDABLE BRAIDED SLEEVING TO PROVIDE A PROFESSIONAL LOOK ON FINISHED PRODUCT.
PROVIDE YELLOW COLORED SLEEVING FOR DATA CABLING AND GREEN COLORED SLEEVING FOR VOICE CABLES.
CC. CONTRACTOR SHALL SUPPLY FACTORY TERMINATED FIBER OPTIC AND CAT 6 PATCH CORDS FOR EACH VOICE, AND DATA PORTS AND CAT 6A FOR WIRELESS PORTS AT THE TELECOM EQUIPMENT ROOM (TER) AND TELECOM ROOMS (TR) ON EACH FLOOR FOR A COMPLETE AND WORKING TURN-KEY COMMUNICATIONS SYSTEM. LENGTH OF PATCH CORDS TO BE DETERMINED BY USMA/NEC PROJECT MANAGER. CONTRACTOR SHALL ALSO SUPPLY 150 EACH 5 FEET, AND 150 EACH 7 FEET GREEN JACKET CAT 6 PATCH CORDS
FOR THE OUTSIDE PLANT (OSP) COPPER CABLE CROSS CONNECTION IN THE TELECOM ROOMS.
TELECOM - GENERAL NOTES
A. NO WORK IN HATCHED AREAS. TELECOM CONTRACTOR TO MAINTAIN ALL CIRCUITS IN THIS AREA DURING
CONSTRUCTION.
B. DEVICES/EQUIPMENT NOTED AS ETBR ON THE DEMOLITION PLAN(S) SHALL BE REMOVED AND RELOCATED TO
THE NEW LOCATION AS INDICATED ON THE NEW TELECOM PLAN(S). DEVICES AND EQUIPMENT NOTED AS ETBR ON THE TELECOM PLAN(S) INDICATES THE NEW LOCATION FOR THE RELOCATED EXISTING DEVICE/EQUIPMENT.
C. ALL WORK SHOWN LIGHT AND SOLID, AND/OR NOTED AS ETR IS EXISTING TO REMAIN, UNO. ALL WORK SHOWN BOLD AND SOLID ON A NEW WORK PLAN IS NEW, UON. ALL WORK SHOWN BOLD AND DASHED ON A DEMOLITION
WORK PLAN IS EXISTING TO BE DEMOLISHED, UON.
D. ALL EXISTING TELECOM/DATA OUTLETS, CONDUIT, AND SUPPORTS LOCATED ABOVE OR AT THE CEILING AND WITHIN THE AREA OF RENOVATION WITHOUT AN 'ETR' DESIGNATION SHALL BE REMOVED BACK TO TELECOM
ROOM OR SOURCE BY EC.
E. EC SHALL REMOVE ALL ABANDON CONDUITS, HANGERS AND BRACING ABOVE OR IN THE CEILING OF THE AREAS
OF RENOVATION.
F. TELECOM CONTRACTOR SHALL REMOVE ALL EXISTING TELECOM, WIRELESS ACCESS, COAX AND LEGACY CABLES THROUGHOUT THE ENTIIRE BUILDING BACK TO SOURCE (PATCH PANEL OR PUNCH DOWN BLOCK).
G. PROVIDE BLANK STAINLESS STEEL COVERPLATES FOR ALL EXISTING FLUSH MOUNTED OUTLETS THAT ARE
ABANDON IN CMU WALLS.
H. TELECOM CONTRACTOR SHALL COORDINATE REMOVAL OF ALL DAS SYSTEM AMPLIFIERS, ANTENNAS, SPLITTERS, REPEATERS, HUBS, AND RACK MOUNTED EQUIPMENT WITH MR. GARY ALBAUGH, WP STAFF CIO/G6.
REMOVE ALL DEVICES, PROVIDE COMPLETE INVENTORY AND STORE IN LOCATION PROVIDED BY CIO/G6.
I. TELECOM CONTRACTOR SHALL COORDINATE REMOVAL OF ALL NETWORK SWITCHES PRIOR TO BUILDING DEMOLITION WITH MR. CANH NGO, NETWORK ENTERPRISE CENTER (NEC). REMOVE ALL SWITCHES, PROVIDE
COMPLETE INVENTORY AND STORE IN LOCATION PROVIDED BY NEC.
J. CONTRACTOR SHALL REMOVE ALL EXISTING WIRELESS ACCESS POINTS (WAPS) PRIOR TO BUILDING DEMOLITION AND TURN OVER TO GOVERNMENT. CONTRACTOR WILL REINSTALL WAPS IN NEW LOCATIONS UPON
BUILDING COMPLETION.
TELECOM - GENERAL NOTES - DEMOLITION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
T-001
T E
L E
C O
M
S Y
M B
O L L
E G
E N
D
G E
N E
R A
L N
O T
E S
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
EXISTING
'HH-1028'
EXISTING
'MH-5A'
COMMUNICATION
ROOM
B005
TRUNK ROOM
B009
BLDG 747
BLDG 745 A&B
BLDG 745 A&B
SUBSTATION
RM
B006b
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
TD100
T E
L E
C O
M
P A
R T
IA
L D
E M
O L
IT
IO
N
P L A
N
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1" = 20'-0"1
TELECOM - PARTIAL DEMOLITION PLAN
# KEYED NOTES:
1. REMOVE 48-STRAND SINGLE MODE FIBER CABLE FROM
BUILDING 756 TO DAVIS BARRACKS BACK TO HANDHOLE
HH-1028, COIL AND PROTECT CABLE. EXISTING DUCTBANK
SHALL REMAIN AND BE REUSED.
2. EXISTING FIBER OPTIC CABLE FROM BLDG 756, SERVING
BUILDING 747, SHALL BE REMOVED BACK TO MANHOLE MH-5A
AND COILED UP DURING CONSTRUCTION. THE FIBER OPTIC
CABLE SHALL REMAIN FROM MANHOLE MH-5A TO BUILDING 747.
SEE SITE PLAN TS101 FOR ADDITIONAL INFORMATION.
3. REMOVE THE FOLLOWING FIBER AND COPPER CABLES FROM
BUILDING 756 BACK TO MANHOLE MH-5A, COIL AND PROTECT
CABLES IN MANHOLE. EXISTING DUCTBANK SHALL REMAIN
AND BE REUSED.
a. 300-PAIR COPPER CABLE (CA14, 1001-1300)
b. 24-STRAND MULTIMODE (FOC, CB1, 61-84)
c. 24-STRAND MULTIMODE (BIT)
d. 6-STRAND SINGLE MODE (DISTRIBUTION ANTENNA
SYSTEM (DAS))
e. 12-STRAND SINGLE MODE (FOC 756D2, 1-12)
f. 48-STRAND SINGLE MODE (FOC 756D, 1-48)
g. 96-STRAND SINGLE MODE (FOC 756CORE, 1-96)
h. 12-STRAND SINGLE MODE BETWEEN DAVIS BARRACKS
AND BLDG 745C (GATE CONTROL)
GRAPHICS SCALE
40' 60' 80'20'
SCALE: 1/20" = 1'-0"
GENERAL NOTES:
A. PLEASE REFER TO THE ARCHITECTURAL DEMO SHEETS (AD100
TO AD302) FOR THE CONSTRUCTION PHASING AND SEQUENCE
OF WORK.
BLDG 756
BRADLEY BARRACKS
751 753
PB 2 PB 1 MH 3E
MH 3B
HH 1028
BREWERTON ROAD
JEFFERSON PLACE
BREWERTON ROAD
745C
VAULT
MH 4
MH 5
MH 3
MH 2
MH 22
MH 7
MH 5A
T H
A Y
E R
T H
A Y
E R
MH 3A1
MH 3A
MH 8
295'
137'
301'
140'
116'
99'
262' 200'
MH 2A
21 6
21 6
21 6
21 6
21 6
21 6
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
TS101
T E
L E
C O
M
O V
E R
A L L S
IT
E
P L A
N
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
# KEYED NOTES:
1. INSTALL (1) NEW 24 STRAND INDOOR/OUTDOOR RATED SINGLE
MODE FIBER OPTIC CABLE FROM BUILDING 747 TO BUILDING 600
USING EXISTING UNDERGROUND DUCTBANK AND MANHOLE
SYSTEM. FIBER SHALL BE INSTALLED TESTED AND ACTIVE
PRIOR TO REMOVING THE EXISTING FIBER FROM BUILDING 756.
TERMINATE BOTH ENDS OF NEW FIBER OPTIC CABLE IN NEW
2RU CCH PATCH PANEL WITH FACTORY TERMINATED DUPLEX
LC PIGTAILED SPLICE CASSETTES. SEE RACK ELEVATION
DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL (1) NEW 96 STRAND INDOOR/OUTDOOR RATED SINGLE
MODE FIBER OPTIC CABLE FROM BUILDING 756 TO BUILDING 600
USING EXISTING UNDERGROUND DUCTBANK AND MANHOLE
SYSTEM. TERMINATE BOTH ENDS OF NEW FIBER OPTIC CABLE
IN NEW 4RU CCH PATCH PANEL WITH FACTORY TERMINATED
DUPLEX LC PIGTAILED SPLICE CASSETTES. SEE RACK
ELEVATION DETAIL FOR ADDITIONAL INFORMATION. FIBER
OPTIC CABLE SHALL BE INSTALLED CONTINUOUS THROUGH
EXISTING DUCT AND MANHOLE SYSTEM WITHOUT SPLICES.
3. TERMINATE NEW 24 STRAND AND 96 STRAND FIBER IN 2ND
BASEMENT, ROOM 29C OF BUILDING 600.
4. RE-INSTALL THE FOLLOWING EXISTING FIBER AND COPPER
CABLES FROM MANHOLE MH-5A TO NEW COMMUNICATIONS
EQUIPMENT ROOM B005 IN BLDG 756 USING THE EXISTING
DUCTBANK. TERMINATE EXISTING FIBER OPTIC CABLES
(EXCEPT DAS) IN NEW 2RU AND 4RU CCH PATCH PANELS
WITH FACTORY TERMINATED DUPLEX LC PIGTAILED SPLICE
CASSETTES. TERMINATE DAS FIBER ONTO SC/ACP
CONNECTORS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CABLE LENGTHS AND PROVIDE ALL NECESSARY EQUIPMENT
REQUIRED TO RE-INSTALL EXISTING CABLES FROM MANHOLE
MH-5A TO NEW COMMUNICATIONS ROOM. IF CABLES ARE NOT
LONG ENOUGH THEN NEW OSP COPPER OR FIBER CABLES
SHALL BE SPLICED TO EXISTING CABLES IN MANHOLE 5A. USE
3M 2-TYPE 505 SPLICE ENCLOSURE FOR COPPER CABLES WITH
3M MS2 CONNECTOR MODULES 4000/4005/4008 SERIES AND
COYOTE BRAND SPLICE ENCLOSURE FOR FIBER OPTIC CABLES.
SEE RACK ELEVATION DETAIL FOR ADDITIONAL INFORMATION.
a. 300-PAIR COPPER CABLE (CA14, 1001-1300)
b. 24-STRAND MULTIMODE (FOC, CB1, 61-84)
c. 24-STRAND MULTIMODE (BIT)
d. 6-STRAND SINGLE MODE (DISTRIBUTION ANTENNA
SYSTEM (DAS))
e. 12-STRAND SINGLE MODE (FOC 756D2, 1-12)
f. 48-STRAND SINGLE MODE (FOC 756D, 1-48)
g. 96-STRAND SINGLE MODE (FOC 756CORE, 1-96)
h. 12-STRAND SINGLE MODE BETWEEN DAVIS BARRACKS
AND BLDG 745C (GATE CONTROL)
i. 24-STRAND SINGLE MODE (FOC FROM BLDG 747) LABEL AS
SPARE
5. RE-INSTALL EXISTING 48-STRAND SINGLE MODE FIBER CABLE
FROM HANDHOLE HH-1028 TO NEW COMMUNICATIONS
EQUIPMENT ROOM. TERMINATE EXISTING FIBER OPTIC CABLE
IN NEW 2RU CCH PATCH PANEL WITH FACTORY TERMINATED
DUPLEX LC PIGTAILED SPLICE CASSETTES. CONTRACTOR
SHALL FIELD VERIFY EXISTING CABLE LENGTH AND PROVIDE
ALL NECESSARY EQUIPMENT REQUIRED TO RE-INSTALL
EXISTING CABLES FROM HANDHOLE HH-1028 TO NEW
COMMUNICATIONS ROOM. IF CABLE IS NOT LONG ENOUGH
THEN A NEW OSP FIBER CABLE SHALL BE SPLICED TO EXISTING
CABLE IN HANDHOLE HH-1028 USING A COYOTE BRAND SPLICE
ENCLOSURE. SEE RACK ELEVATION DETAIL FOR ADDITIONAL
INFORMATION.
6. INSTALL NEW 24-STRAND INDOOR/OUTDOOR RATED SINGLE-
MODE FIBER FROM BUILDING 756 TO BUILDING 600 USING
EXISTING UNDERGROUND DUCTBANK AND MANHOLE
SYSTEM FOR DAS. TERMINATE BOTH ENDS OF DAS FIBER ONTO
SC/APC CONNECTORS. FIBER OPTIC CABLE SHALL BE
INSTALLED CONTINUOUS THROUGH EXISTING DUCT AND
MANHOLE SYSTEM WITHOUT SPLICES.
GRAPHICS SCALE
100' 150' 200'50'
SCALE: 1/50" = 1'-0"
1" = 50'-0"1
TELECOM - OVERALL SITE PLAN
TRUNK ROOM
B022
STAIR 4
S-0-4
ELEV2 MACH
RM
B024
SUBSTATION
RM
B020b
EXIT
B021
T-400
T-400
W
W
(4)4" CONDUIT SLEEVES
(3)4" CONDUIT SLEEVES
ELEV 11
B025
FURNITURE
STORAGE
B019
CORRIDOR 07
B026
TELECOM
B018
TRUNK ROOM
B023
ELECTRICAL
B020a
STEAM
TUNNEL
B027
8"x2"
8"x2"
W
(4)4" CONDUIT SLEEVES
12"X4"
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART A
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-101
B A
S E
M E
N T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
A
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
BASEMENT FLOOR PLAN - TELECOM - PART A
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART A'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 CABLE BASKET TRAY ABOVE ACCESSIBLE CEILING.
REFER TO PLANS FOR DIMENSIONS. CONTRACTOR
SHALL COORDINATE WITH ALL TRADES PRIOR TO
ROUGH-IN.
2 SEAL ALL CONDUIT WALL PENETRATIONS USING
GROUT, SILICONE OR OTHER SEALANTS THAT MEET
THE TEMPERATURE AND DAMP ENVIRONMENT OF
THE STEAM TUNNEL.
STAIR 3
S-0-3
ELEV1 MACH
RM
B014
STEAM
TUNNEL
B027
W
WAP
CORRIDOR 05
B032
TRUNK ROOM
B009
GAME ROOM
B010
STORAGE
B015
JANITOR
OFFICE
B017
JANITOR
SUITE
B016a
WOMENS RM
B013
MENS RM
B012
1/2
1/2
1/2
1/2
1/2
12"X4" 12"X4"
12"X4"
12"X4"
1/2
W
JANITOR
SUPPLY
CLOSET
B016b
12"X4"
WAP
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART B
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-102
B A
S E
M E
N T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
B
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
BASEMENT FLOOR PLAN - TELECOM - PART B
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART A'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE
CEILING. REFER TO PLANS FOR DIMENSIONS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN.
2 SEAL ALL CONDUIT WALL PENETRATIONS USING
GROUT, SILICONE OR OTHER SEALANTS THAT MEET
THE TEMPERATURE AND DAMP ENVIRONMENT OF
THE STEAM TUNNEL.
3 WIRELESS ACCESSPOINT FOR CATV SERVICE.
PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH
CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER
DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.
B004
STAIR 2
S-0-2
AREAWAY
B007b
T-400
T-400
W
W
W
(4)4" CONDUIT SLEEVES
(4)4"
CONDUIT
SLEEVES
(4)4" CONDUIT
SLEEVES
WAP
JANITOR
B033
CORRIDOR 04
B034
COMMUNICATION
ROOM
B005
MECHANICAL
ROOM
B007a
ELECTRICAL
ROOM
B006a
FIRE PUMP
ROOM
B008
SUBSTATION
RM
B006b
W
CORRIDOR 05
B032
GAME ROOM
B010
1/2
1/2
1/2
1/2
18"x2" 18"x2"
12"X4" 12"X4" 12"X4" 8"x2"
12"X4"
6 6
(4)4" CONDUITS9
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART C
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-103
B A
S E
M E
N T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
C
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
BASEMENT FLOOR PLAN - TELECOM - PART C
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 PROVIDE NEW PULL BOX AND EXTEND EXISTING (2)4”
SERVICE CONDUITS TO NEW COMMUNICATION
ROOM. SIZE PULL BOX PER TIA AND NEC
REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”
INTO NEW COMM ROOM. PROVIDE WATERFALL
DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON
END OF CONDUITS IN COMM ROOM.
2 PROVIDE (2) NEW 4” CONDUITS FROM NEW PULL BOX
AND EXTEND ABOVE ACCESSIBLE CEILING BACK TO
NEW COMM ROOM. PROVIDE WATERFALL DEVICE
PANDUIT CDF400 OR APPROVED EQUAL ON END OF
CONDUIT IN COMM ROOM.
3 COORDINATE EXACT LOCATION OF DATA DROP FOR
CONNECTION TO EMCS/BMS SYSTEM WITH MC
PRIOR TO ROUGH-IN.
4 PROVIDE NEW METAL PULL BOX, SIZE PER TIA AND
NEC REQUIREMENTS.
5 CABLE LADDER TRAY. REFER TO PLANS FOR
DIMENSIONS. CONTRACTOR SHALL COORDINATE
WITH ALL TRADES PRIOR TO ROUGH-IN. LADDER
TRAY SHALL BE COORDINATED WITH CONDUIT
SLEEVE LOCATIONS THROUGH FIRST FLOOR.
6 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE
CEILING. REFER TO PLANS FOR DIMENSIONS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN.
7 INSTALL CONDUIT WATERFALL DEVICE ON TELECOM
ROOM SIDE OF CONDUIT SLEEVES, USE PANDUIT
CDF400 OR APPROVED EQUAL.
8 TWO VOICE DROPS. COORDINATE EXACT LOCATION
OF FIRE ALARM CONTROL PANEL WITH FIRE ALARM
CONTRACTOR.
9 PROVIDE NEW PULL BOX AND EXTEND EXISTING (4)4”
SERVICE CONDUITS TO NEW COMMUNICATION
ROOM. SIZE PULL BOX PER TIA AND NEC
REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”
INTO NEW COMM ROOM. PROVIDE WATERFALL
DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON
END OF CONDUITS IN COMM ROOM.
# KEYED NOTES:
1 PROVIDE NEW PULL BOX AND EXTEND EXISTING (2)4”
SERVICE CONDUITS TO NEW COMMUNICATION
ROOM. SIZE PULL BOX PER TIA AND NEC
REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”
INTO NEW COMM ROOM. PROVIDE WATERFALL
DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON
END OF CONDUITS IN COMM ROOM.
2 PROVIDE (2) NEW 4” CONDUITS FROM NEW PULL BOX
AND EXTEND ABOVE ACCESSIBLE CEILING BACK TO
NEW COMM ROOM. PROVIDE WATERFALL DEVICE
PANDUIT CDF400 OR APPROVED EQUAL ON END OF
CONDUIT IN COMM ROOM.
3 COORDINATE EXACT LOCATION OF DATA DROP FOR
CONNECTION TO EMCS/BMS SYSTEM WITH MC
PRIOR TO ROUGH-IN.
4 PROVIDE NEW METAL PULL BOX, SIZE PER TIA AND
NEC REQUIREMENTS.
5 CABLE LADDER TRAY. REFER TO PLANS FOR
DIMENSIONS. CONTRACTOR SHALL COORDINATE
WITH ALL TRADES PRIOR TO ROUGH-IN. LADDER
TRAY SHALL BE COORDINATED WITH CONDUIT
SLEEVE LOCATIONS THROUGH FIRST FLOOR.
6 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE
CEILING. REFER TO PLANS FOR DIMENSIONS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN.
7 INSTALL CONDUIT WATERFALL DEVICE ON TELECOM
ROOM SIDE OF CONDUIT SLEEVES, USE PANDUIT
CDF400 OR APPROVED EQUAL.
8 TWO VOICE DROPS. COORDINATE EXACT LOCATION
OF FIRE ALARM CONTROL PANEL WITH FIRE ALARM
CONTRACTOR.
9 PROVIDE NEW PULL BOX AND EXTEND EXISTING (4)4”
SERVICE CONDUITS TO NEW COMMUNICATION
ROOM. SIZE PULL BOX PER TIA AND NEC
REQUIREMENTS. STUB CONDUITS MINIMUM OF 4”
INTO NEW COMM ROOM. PROVIDE WATERFALL
DEVICE PANDUIT CDF400 OR APPROVED EQUAL ON
END OF CONDUITS IN COMM ROOM.
B001
TRUNK ROOM
B003
STAIR 1
S-0-1
TRUNK ROOM
B002
CORRIDOR 02
B035
8"x2" 8"x2"
1 1
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
PART DKEY PLAN
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-104
B A
S E
M E
N T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
D
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
BASEMENT FLOOR PLAN - TELECOM -PART D
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 CABLE BASKET TRAY LOCATED ABOVE ACCESSIBLE
CEILING. REFER TO PLANS FOR DIMENSIONS.
TYPICAL. CONTRACTOR SHALL COORDINATE WITH
ALL TRADES PRIOR TO ROUGH-IN.
CADET RM.
B1035
STAIR 4
S-1-4
ELEV 11
B117
CADET RM.
B1034
MENS ROOM
B116
WOMENS
ROOM
B115
UNISEX TLT.
B114
JANITOR
B113
TELECOM
B111
ELECTRICAL
B112
STORAGE
B118
CADET RM.
B1024
CADET RM.
B1025
CADET RM.
B1026
CADET RM.
B1027
CADET RM.
B1029
VESTIBULE
B119b
CADET RM.
B1031
CADET RM.
B1032
CADET RM.
B1033
CADET RM.
B1036
CADET RM.
B1037
CADET RM.
B1038
CADET RM.
B1040
CADET RM.
B1041
CADET RM.
B1039
CADET RM.
B1042
CADET RM.
B1043
CADET RM.
B1028CORRIDOR 02
B121
CORRIDOR 02
B119a
CORRIDOR 02
B120
EXIT
B151
CORRIDOR 02
B150
T-401
T-401
W
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
WAP
WAP
WAP
WAP
WAP
WAP
WAP
(3)4" CONDUIT SLEEVES
61 CABLES
139 CABLES
(2)4" CONDUIT SLEEVES
1 1
W
1/2
WAP
WAP
1/2
WAP
W
1/2
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART A
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-111
F
IR
S T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
A
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
FIRST FLOOR PLAN - TELECOM - PART A
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR
SHALL COORDINATE WITH ALL TRADES PRIOR TO
ROUGH-IN. REFER TO J-HOOK DETAIL FOR
ADDITIONAL INFORMATION. COORDINATE J-HOOK
LOCATIONS WITH CEILING ACCESS PANELS IN GWB
CEILINGS IN CORRIDORS.
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART A'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
S-1-3
ELEV 12
B110
LAUNDRY
B109
COLLAB. RM.
B125a
ORDERLY RM.
B1050
CADET RM.
B1021
CADET RM.
B1049
JANITOR
B124
CORRIDOR 01
B123
CADET RM.
B1048
CADET RM.
B1047
STORAGE
B125b
CADET RM.
B1053
CADET RM.
B1052
CADET RM.
B1051
CADET RM.
B1046
CADET RM.
B1020
MENS ROOM
B108
SALLY PORT
B122b
CORRIDOR 01
B122a
CORRIDOR 01
B128
1/21/2
1/2
1/2 1/2
1/2
1/2
1/21/2
1/2
1/2
1/21/2
1/2
1/2
1/21/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
WAP
WAP
WAP
WAP WAP
1/2
1/2
1/2
1/2
CORRIDOR 01
B127
WAP
WAP
3 3 3 3
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART B
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-112
F
IR
S T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
B
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
FIRST FLOOR PLAN - TELECOM - PART B
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR
SHALL COORDINATE WITH ALL TRADES PRIOR TO
ROUGH-IN. REFER TO J-HOOK DETAIL FOR
ADDITIONAL INFORMATION. COORDINATE J-HOOK
LOCATIONS WITH CEILING ACCESS PANELS IN GWB
CEILINGS IN CORRIDORS.
2 WIRELESS ACCESSPOINT FOR CATV SERVICE.
PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH
CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER
DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.
3 ROUTE CONDUIT FOR POKE-THRU DEVICE TO BASKET
CABLE TRAY ON BASEMENT FLOOR.
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
TELECOM
B104
ELECTRICAL
B105STAIR 2
S-1-2
MENS ROOM
B103
WOMENS
ROOM
B102
WOMENS
ROOM
B107
CADET RM.
B1054
CADET RM.
B1056
CADET RM.
B1055
CADET RM.
B1058
CADET RM.
B1057
CADET RM.
B1060
CADET RM.
B1059
CADET RM.
B1062
CADET RM.
B1061
CADET RM.
B1063
CADET RM.
B1010
CADET RM.
B1011
CADET RM.
B1012
CADET RM.
B1013
CADET RM.
B1014VESTIBULE
B126b
CADET RM.
B1016
CADET RM.
B1017
CADET RM.
B1018
CADET RM.
B1019
CORRIDOR 01
B127
T-401
T-401
W
1/2
1/21/2 1/2 1/2
1/2
1/2
1/2 1/2 1/2 1/2
1/2 1/2
1/2 1/2
1/2 1/2
1/2 1/2
1/2 1/2 1/2 1/2
1/2
1/2
1/2 1/2 1/2
1/21/2
1/21/2
1/2
1/2
1/21/2
1/2
1/2 1/2
1/21/2
1/2
1/21/2
1/2
1/21/2
1/2
1/2
1/21/2
1/21/2
1/2
1/2
1/2 1/2
1/2
1/2
W
WAP WAP WAP WAP WAP
WAP WAP WAP WAP WAP
(3)3" CONDUIT SLEEVES
(4)4" CONDUIT SLEEVES CORRIDOR 01
B126a
CORRIDOR 01
B123
100 CABLES 142 CABLES
154 CABLES127 CABLES
(3)4" CONDUIT
SLEEVES
(2)3" CONDUIT SLEEVES
(3)3" CONDUIT SLEEVES
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART C
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-113
F
IR
S T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
C
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
FIRST FLOOR PLAN - TELECOM - PART C
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK
DETAIL FOR ADDITIONAL INFORMATION.
COORDINATE J-HOOK LOCATIONS WITH CEILING
ACCESS PANELS IN GWB CEILINGS IN CORRIDORS.
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK
DETAIL FOR ADDITIONAL INFORMATION.
COORDINATE J-HOOK LOCATIONS WITH CEILING
ACCESS PANELS IN GWB CEILINGS IN CORRIDORS.
STAIR 1
S-1-1
CADET RM.
B1071
CADET RM.
B1074
CADET RM.
B1073
STORAGE
B130
STORAGE
B131
CADET RM.
B1064
CADET RM.
B1066
CADET RM.
B1065
CADET RM.
B1068
CADET RM.
B1067
CADET RM.
B1070
CADET RM.
B1069
CADET RM.
B1072
CADET RM.
B1001
CADET RM.
B1005
CADET RM.
B1006
CADET RM.
B1003
VESTIBULE
B126c
CADET RM.
B1002
CADET RM.
B1007
CADET RM.
B1008
CADET RM.
B1009
MENS ROOM
B101
1/2
1/2
1/2
1/2 1/2 1/2 1/2
1/2
1/2
1/2 1/2 1/2 1/2 1/2 1/2
1/2
1/2 1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/21/2
1/21/2
1/2
1/2
1/21/2
1/21/2
1/2
1/21/2
1/2
1/2
1/21/2
1/2
1/21/2
1/2
1/2
1/21/2
1/2
1/2
1/2
1/2
1/2
1/2
WAP WAP WAP WAP
WAP WAP WAP WAP WAP
WAP
CORRIDOR 01
B128
CORRIDOR 01
B127
CORRIDOR 01
B126a
WOMENS
ROOM
B102
1/2
(2)4" CONDUIT SLEEVES
1/2
1/2
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
PART DKEY PLAN
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-114
F
IR
S T
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
D
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
FIRST FLOOR PLAN - TELECOM - PART D
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK
DETAIL FOR ADDITIONAL INFORMATION.
B2035
STAIR 4
S-2-4
ELEV 11
B217
CADET RM.
B2034
MENS ROOM
B216
WOMENS
ROOM
B215
UNISEX TLT.
B214
JANITOR
B213
TELECOM
B211
ELECTRICAL
B212
STORAGE
B218
CADET RM.
B2024
CADET RM.
B2025
CADET RM.
B2026
CADET RM.
B2027
CADET RM.
B2029
CADET RM.
B2030
CADET RM.
B2031
CADET RM.
B2032
CADET RM.
B2033
CADET RM.
B2036
CADET RM.
B2037
CADET RM.
B2038
CADET RM.
B2040
CADET RM.
B2041
CADET RM.
B2039
CADET RM.
B2042
CADET RM.
B2043
CADET RM.
B2028
CORRIDOR 02
B219
CORRIDOR 02
B220
CORRIDOR 02
B221
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/21/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
T-402
T-402
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
(3)4" CONDUIT SLEEVES
(3)4" CONDUIT SLEEVES
1/2
1/2
1/2
1/2
155 CABLES
200 CABLES
W
W
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART A
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-121
S E
C O
N D
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
A
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
SECOND FLOOR PLAN - TELECOM - PART A
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR
SHALL COORDINATE WITH ALL TRADES PRIOR TO
ROUGH-IN. REFER TO J-HOOK DETAIL FOR
ADDITIONAL INFORMATION. COORDINATE J-HOOK
LOCATIONS WITH CEILING ACCESS PANELS IN GWB
CEILINGS IN CORRIDORS.
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART A'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
S-2-3
ELEV 12
B210
MENS ROOM
B208
LAUNDRY
B209
COLLAB. RM.
B225a
ORDERLY RM.
B2050
CADET RM.
B2021
CADET RM.
B2049
STORAGE
B224
CADET RM.
B2048
CADET RM.
B2047
STORAGE
B225b
CADET RM.
B2053
CADET RM.
B2052
CADET RM.
B2051
CADET RM.
B2046
CADET RM.
B2045
CADET RM.
B2020
CADET RM.
B2023
CADET RM.
B2022
CADET RM.
B2044
CORRIDOR 01
B222
CORRIDOR 01
B223
1/2 1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2
1/2
WAP
WAP
WAP
WAP
WAP
WAPWAP
1/2
1/2
1/2
1/2
1/2
WAP
WAP
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART B
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-122
S E
C O
N D
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
B
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
SECOND FLOOR PLAN - TELECOM - PART B
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR
SHALL COORDINATE WITH ALL TRADES PRIOR TO
ROUGH-IN. REFER TO J-HOOK DETAIL FOR
ADDITIONAL INFORMATION. COORDINATE J-HOOK
LOCATIONS WITH CEILING ACCESS PANELS IN GWB
CEILINGS IN CORRIDORS.
2 WIRELESS ACCESSPOINT FOR CATV SERVICE.
PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH
CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER
DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART A'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
B204
ELECTRICAL
B205
JANITOR
B206
STAIR 2
S-2-2 MENS ROOM
B203
WOMENS
ROOM
B202
WOMENS
ROOM
B207
CORRIDOR 01
B226
CADET RM.
B2054
CADET RM.
B2056
CADET RM.
B2055
CADET RM.
B2058
CADET RM.
B2057
CADET RM.
B2060
CADET RM.
B2059
CADET RM.
B2062
CADET RM.
B2061
CADET RM.
B2063
CADET RM.
B2010
CADET RM.
B2011
CADET RM.
B2012
CADET RM.
B2013
CADET RM.
B2014
CADET RM.
B2015
CADET RM.
B2016
CADET RM.
B2017
CADET RM.
B2018
CADET RM.
B2019
CORRIDOR 01
B227
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2 1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/21/2
1/2
1/21/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2 1/2
1/2
T-402
T-402
1/2
W
WAP WAP WAP WAP WAP
WAPWAPWAPWAPWAP
(4)3" CONDUIT SLEEVES
(4)4" CONDUIT SLEEVES(3)4" CONDUIT SLEEVES60 CABLES
160 CABLES
60 CABLES
1/2
364 CABLES 144 CABLES
(2)3" CONDUIT SLEEVES
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART C
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-123
S E
C O
N D
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
C
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
SECOND FLOOR PLAN - TELECOM - PART C
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK
DETAIL FOR ADDITIONAL INFORMATION.
S-2-1
JANITOR
B229
MENS ROOM
B201
CADET RM.
B2072
STORAGE
B230
FIRE PANEL
ROOM
B231
CADET RM.
B2064
CADET RM.
B2066
CADET RM.
B2065
CADET RM.
B2068
CADET RM.
B2067
CADET RM.
B2070
CADET RM.
B2069
CADET RM.
B2071
CADET RM.
B2001
CADET RM.
B2005
CADET RM.
B2006
CADET RM.
B2004
CADET RM.
B2007
CADET RM.
B2008
CADET RM.
B2009
CADET RM.
B2002
CADET RM.
B2003
CORRIDOR 01
B228
1/2
1/2
1/2
1/2
1/2 1/2
1/21/2
1/2
1/2
1/2
1/2
1/21/2
1/2
1/2
1/2
1/2
1/21/2
1/2
1/2 1/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/21/2
1/2
1/2
1/2 1/2
1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
WAP WAP WAP WAP WAP
WAP
WAPWAPWAPWAPWAP
1/2
WOMENS
ROOM
B202
1/2
1/2
1/2
CADET RM.
B2073
CADET RM.
B2074
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
PART DKEY PLAN
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-124
S E
C O
N D
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
D
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
SECOND FLOOR PLAN - TELECOM - PART D
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART C'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
DROP CEILING); COORDINATE CEILING TYPES AND
LOCATION WITH GOVERNMENT PRIOR TO ROUGH-IN.
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS.
CONTRACTOR SHALL COORDINATE WITH ALL
TRADES PRIOR TO ROUGH-IN. REFER TO J-HOOK
DETAIL FOR ADDITIONAL INFORMATION.
B3035
STAIR 4
S-3-4
ELEV 11
B317
CADET RM.
B3034
MENS ROOM
B316
WOMENS
ROOM
B315
UNISEX TLT.
B314
JANITOR
B313
TELECOM
B311
ELECTRICAL
B312
STORAGE
B318
CADET RM.
B3024
CADET RM.
B3025
CADET RM.
B3026
CADET RM.
B3027
CADET RM.
B3029
CADET RM.
B3030
CADET RM.
B3031
CADET RM.
B3032
CADET RM.
B3033
CADET RM.
B3036
CADET RM.
B3037
CADET RM.
B3038
CADET RM.
B3040
CADET RM.
B3041
CADET RM.
B3039
CADET RM.
B3042
CADET RM.
B3043
CADET RM.
B3028
CORRIDOR 02
B319
CORRIDOR 02
B320
CORRIDOR 02
B321
T-403
T-403
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
W
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
(3)4" CONDUIT SLEEVES
(3)4" CONDUIT SLEEVES
155 CABLES
W
200 CABLES
1/2
1/2
1/2
1/2
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART A
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-131
T H
IR
D
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
A
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
THIRD FLOOR PLAN - TELECOM - PART A
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR
SHALL COORDINATE WITH ALL TRADES PRIOR TO
ROUGH-IN. REFER TO J-HOOK DETAIL FOR
ADDITIONAL INFORMATION. COORDINATE J-HOOK
LOCATIONS WITH CEILING ACCESS PANELS IN GWB
CEILINGS IN CORRIDORS.
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART A'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
S-3-3
ELEV 12
B310
MENS ROOM
B308
LAUNDRY
B309
COLLAB. RM.
B325a
ORDERLY RM.
B3050
CADET RM.
B3021
CADET RM.
B3049
STORAGE
B324
CADET RM.
B3048
CADET RM.
B3047
STORAGE
B325b
CADET RM.
B3053
CADET RM.
B3052
CADET RM.
B3051
CADET RM.
B3046
CADET RM.
B3045
CADET RM.
B3020
CADET RM.
B3023
CADET RM.
B3022
CADET RM.
B3044
CORRIDOR 01
B322
CORRIDOR 01
B323
1/21/2
1/2
1/2 1/2
1/2
1/2
1/21/2
1/2
1/2
1/21/2
1/2
1/2
1/2
1/21/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
WAP
WAP
WAPWAP
WAP
WAP
WAP
1/2
1/2
1/2
1/2
WAP
WAP
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART B
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-132
T H
IR
D
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
B
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
R K
N
Y
D A
P A
L
J E
D
/2
/1
W D
S -1
-D
-0
100% FINAL DESIGN SUBMISSION
C B
U P
B R
A D
L E
Y B
A R
R A
C K
S
F Y
P
N
1/8" = 1'-0"1
THIRD FLOOR PLAN - TELECOM - PART B
# KEYED NOTES:
1 PROPOSED CABLE ROUTING, CONTRACTOR SHALL
BE RESPONSIBLE FOR INSTALLING AND
COORDINATING ALL CABLE ROUTING. CABLE
ROUTING SHOWN FOR REFERENCE ONLY. CABLES
SHALL BE SUPPORTED WITH J-HOOKS. CONTRACTOR
SHALL COORDINATE WITH ALL TRADES PRIOR TO
ROUGH-IN. REFER TO J-HOOK DETAIL FOR
ADDITIONAL INFORMATION. COORDINATE J-HOOK
LOCATIONS WITH CEILING ACCESS PANELS IN GWB
CEILINGS IN CORRIDORS.
2 WIRELESS ACCESSPOINT FOR CATV SERVICE.
PROVIDE FLUSH MOUNTED OUTLET IN CEILING WITH
CAT6A CABLE BACK TO CATV TTB. SEE CATV RISER
DIAGRAM 1/T-609 FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
A CABLE ZONING. ALL VOICE AND DATA DROPS IN THIS
"PART" SHALL BE ROUTED BACK TO THE TELECOM
RM ON THIS FLOOR LOCATED IN "PART A'.
B ALL TELECOM CONDUITS SHALL BE STUBBED IN TO
THE NEAREST ACCESSIBLE CORRIDOR CEILING (ACT
B304
ELECTRICAL
B305
JANITOR
B306
STAIR 2
S-3-2
MENS ROOM
B303
WOMENS
ROOM
B302
WOMENS
ROOM
B307
CORRIDOR 01
B326
CADET RM.
B3054
CADET RM.
B3056
CADET RM.
B3055
CADET RM.
B3058
CADET RM.
B3057
CADET RM.
B3060
CADET RM.
B3059
CADET RM.
B3062
CADET RM.
B3061
CADET RM.
B3063
CADET RM.
B3010
CADET RM.
B3011
CADET RM.
B3012
CADET RM.
B3013
CADET RM.
B3014
CADET RM.
B3015
CADET RM.
B3016
CADET RM.
B3017
CADET RM.
B3018
CADET RM.
B3019
CORRIDOR 01
B327
T-403
T-403
1/2
1/21/2 1/2
1/2 1/2
1/2
1/2 1/2
1/2 1/2 1/2
1/2
1/2
1/2
1/2 1/2
1/2 1/2
1/2 1/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2 1/2
1/2
1/21/2
1/21/2
1/2
1/2
1/21/2
1/2
1/2 1/2
1/21/2
1/2
1/21/2
1/2 1/2
1/2
1/2
1/2
1/2
1/2
1/21/2
1/2
1/2
1/2 1/2
1/2
1/2
1/2
W
WAP WAP WAP WAP WAP
WAPWAPWAPWAPWAP
(4)4" CONDUIT SLEEVES(3)4" CONDUIT SLEEVES60 CABLES
160 CABLES
60 CABLES
144 CABLES
W
1/2
(4)3" CONDUITS SLEEVES
144 CABLES
(2)3" CONDUITS SLEEVES
WALL TYPE LEGEND
SMOKE PARTITION
1 HR PARTITION
2 HR PARTITION
SCALE: 1/8"=1'-0"
8 04 8
KEY PLAN PART C
A
B
C D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
PLAN NORTH
T-133
T H
IR
D
F L O
O R
P L A
N
T E
L E
C O
M
P A
R T
C
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N
E W
Y O
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .