This memorandum outlines requirements for a laundry equipment procurement. The Department of the Army seeks to purchase twelve hot head steam presses, including apron and legger buck units as well as a double buck with vacuum component, cabinet sleever, and collar unit. The equipment will also require a buck steam pedal and insulated steam lines and heads. Additional requirements include adjustable auto-open and close timers, manual override controls, and adjustable air pressure regulators. Associated steam irons and installation of all equipment are also required. Bidders must complete a site visit, remove and dispose of existing equipment, install the new units and connect them to facility utilities, and provide a one-year parts and labor warranty.

The related federal contract opportunity is a solicitation from the Department of the Army seeking the above laundry equipment for West Point, with a closing date still to be determined.

View the file

Other files for this federal contract opportunity

Other files attached to WEST POINT- 12-HOT HEAD PRESSES & ONE 3 PEICE SHIRT SYSTEM, newest first.
File Type Posted
W911SD-23-R-0179-0004 WEST POINT -HOT HEAD PRESSES - ONE 3 PEICE SHIRT SYSTEM-CLAUSE CORRECTION.pdf PDF
W911SD-23-R-0179-0003 WEST POINT -HOT HEAD PRESSES - ONE 3 PEICE SHIRT SYSTEM-RFIs.pdf PDF
PRS.docx DOCX document
W911SD-23-R-0179-0001 WEST POINT -HOT HEAD PRESSES - ONE 3 PEICE SHIRT SYSTEM.pdf PDF
PWS 12 Laundry Presses.docx DOCX document
W911SD-23-R-0179- WEST POINT -HOT HEAD PRESSES.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

LRC WEST POINT

Bldg. 845 Laundry Plant West Point, NY 10996

ASPA-LWP-SSL 13 JUNE 2023

Memorandum To: MICC Contract Specialist

Subject: Hot Head Laundry Steam Press (12 each) PWS/Specs

Requirement: The Laundry Facility requires 12 each Hot Head Steam Presses, and additional Three Piece Shirt System to accomplish the mission of laundering clothing and linens for the USMA cadets and Medical Treatment Facilities. The equipment will replace the current items which are well beyond life cycle expectancy and could cause a delay in the processing of laundry. The presses have a life cycle expectancy of 20 years but are now 63 years old. These are utilized daily to accomplish the mission and meet terms and conditions of the laundry contract. To maintain operational tempo with properly maintained equipment, operation must be seamless and result in minimal operational deficiencies. The intent is to purchase the equipment as soon as practical utilizing the following specifications.

Hot Head Laundry Steam Presses and Three Piece Shirt System Specifications:

1. 3 each Laundry Hot Head units to be Apron buck & head approximately 54” x 17-20” padded buck with a bare steel head

2. 9 each Laundry Hot Head units to be Legger buck and head approximately 53-57” x 16-20” Padded buck with a bare steel head

3. 1 each Double Buck with vacuum component

4. 1 each Cabinet Sleever

5. I each Collar with wide cuff radius

6. Buck steam pedal

7. All heads and steam lines need to be insulated on the outside to prevent burns

8. Adjustable time before auto opening

9. Manual open override control

10. Two hand auto closing

11. Adjustable air pressure regulator

12. All steam iron alongside each press

13. 100 psi airline pressure

14. 100 psi steam pressure

15. Turn key install w/ all covers & pads in place

Vendor Requirements:

1. Must complete a site visit to examine current equipment and ensure new equipment will be compatible with all electric, plumbing, and steam, as necessary, and fits into installation space provided.

2. Must remove and dispose of current steam iron press equipment, including disconnect of all components tied into facility utilities, and install new equipment.

3. The vendor will be responsible for shipping, delivering, uncrating, installation, start-up, electrical, and demonstration of new equipment and removal of packaging and installation materials. Installation to include connection of new equipment to all existing electric, plumbing, and steam.

4. Must include a standard 1-year warranty on parts and workmanship.