This document includes an attachment outlining performance requirements for a federal contract solicitation. The solicitation is for the provision and installation of 12 utility leg press ironers and a three piece shirt system for an Army laundry plant at West Point. The performance standard requires the equipment be installed in accordance with applicable electric, steam and plumbing codes with no more than one defect. Acceptable quality will be determined through 100% inspection and any occurrences exceeding the acceptable quality level will result in a 1% deduction from the invoice amount.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
Performance Requirements Summary (PRS)
Performance Objective (from PWS Section 5)
| Performance Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Incentive / Disincentive |
| Provide and install 12 each Utility Leg Press Ironers and a Three Piece Shirt System to laundry plant. |
| Ensure steam, electric and plumbing are in accordance with code |
| No more than 1 defects |
| 100% inspection of items provided |
| 1% of invoice amount for each occurrence exceeding AQL. |