About this file

This document includes an attachment outlining performance requirements for a federal contract solicitation. The solicitation is for the provision and installation of 12 utility leg press ironers and a three piece shirt system for an Army laundry plant at West Point. The performance standard requires the equipment be installed in accordance with applicable electric, steam and plumbing codes with no more than one defect. Acceptable quality will be determined through 100% inspection and any occurrences exceeding the acceptable quality level will result in a 1% deduction from the invoice amount.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

Performance Requirements Summary (PRS)

Performance Objective (from PWS Section 5)

Performance Standard
Acceptable Quality Level
Method of Surveillance
Incentive / Disincentive
Provide and install 12 each Utility Leg Press Ironers and a Three Piece Shirt System to laundry plant.
Ensure steam, electric and plumbing are in accordance with code
No more than 1 defects
100% inspection of items provided
1% of invoice amount for each occurrence exceeding AQL.

File details come from the government source that posted it. Updated .