W911SA20B2005 Attachment 6 Breakdown of Cost.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
63rd RD MAID-IQ Region 4, CA Federal contract opportunity
Solicitation number
W911SA20B2005
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

About this file

This document contains three sheets of a construction cost estimate breakdown template for a federal contract opportunity to provide design-build services for the 63rd Regional District in California.

The construction cost estimate breakdown template includes line items for materials, labor, and other direct costs to be completed by offerors. It requests breakdowns by construction task such as site work, concrete, masonry, and mechanical, electrical and plumbing. The template provides instructions for offerors to itemize quantities, unit costs, labor hours, wage rates, equipment costs, and other direct costs. It indicates totals will be automatically calculated. The related federal contract opportunity is to provide all parts, labor, tools, equipment, materials, transportation, and supervision necessary to perform design-build projects for the 63rd Regional District in California in accordance with specifications, drawings, and contract documents under Solicitation Number W911SA20B2005 from the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort McCoy.

View the file

Other files for this federal contract opportunity

Other files attached to 63rd RD MAID-IQ Region 4, CA, newest first.
File Type Posted
W911SA20B2005 Bid Abstract.pdf PDF
W911SA20B2005 Attachment 7 Wage Determinations Revised 3-17-20.docx DOCX document
W911SA20B20050006 Solicitation Amendment 0006.docx DOCX document
W911SA20B20050005 Solicitation Amendment 0005.docx DOCX document
W911SA20B2005 Attachment 7 Wage Determinations Revised 3-10-20.docx DOCX document
W911SA20B20050004 Solicitation Amendment 0004.docx DOCX document
W911SA20B2005 Attachment 4 SOW Seed Project Revised 3-3-20.docx DOCX document
W911SA20B20050003 Solicitation Amendment 0003.docx DOCX document
W911SA20B2005 Attachment 5 Drawing Seed Project Revised 3-3-20.pdf PDF
W911SA20B2005 Attachment 9 As Builts Seed Project.pdf PDF
W911SA20B2005 Solicitation Amendment 0002.docx DOCX document
W911SA20B2005 Attachment 4 SOW Seed Project Revised 2-27-20.docx DOCX document
W911SA20B2005 Attachment 7 Wage Determinations.docx DOCX document
W911SA20B2005 Attachment 5 Drawing Seed Project Revised 2-27-20.pdf PDF
W911SA20B20050001 Solicitation Amendment 0001.docx DOCX document
W911SA20B2005 Site Visit Sign-In Sheet.pdf PDF
W911SA20B2005 Solicitation.docx DOCX document
W911SA20B2005 Attachment 5 Drawings Seed Project.pdf PDF
W911SA20B2005 Attachment 3 SOW.docx DOCX document
W911SA20B2005 Attachment 4 SOW Seed Project.docx DOCX document
W911SA20B2005 Attachment 7 Wage Determinations.xlsx XLSX spreadsheet
W911SA20B2005 Attachment 1 AT OPSEC.pdf PDF
W911SA20B2005 Attachment 8 SF24.pdf PDF
W911SA20B2005 Attachment 2 AT OPSEC Seed Project.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
001General Requirement- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
002$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
003$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
004Site Construction$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
005$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
006$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
007Concrete$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
008$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
009$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
010Masonry$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
011$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
012$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
013Metals$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
014$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
015$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0
Note: DO NOT EXCEED two decimal places.
Note: If more rows are needed, bidders may add them, but are cautioned that formulas will need to be adjusted to calculate costs correctly

SOLICITATION NUMBER ______________

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sheet 2

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
016Woods and Plactics$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
017$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
018$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
019Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
020$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
021$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
022Doors and Windows$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
023$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
024$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
025Finishes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
026$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
027$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
028Specialities$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
029$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
030$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sheet 3

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
031Equipment$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
032$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
033$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
034Furnishings$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
035$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
036$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
037Special Construction$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
038$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
039Conveying Systems$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
040$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
041Mechanical/Plumbing$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
042$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
043$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
044Electrical$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
045$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sub-Total

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SHEET 1LS$ - 0$ - 0$ - 0$ - 0
SHEET 2LS$ - 0$ - 0$ - 0$ - 0
SHEET 3LS$ - 0$ - 0$ - 0$ - 0

SUM S H E E T T O T A L LS $ - 0 $ - 0 $ - 0 $ - 0

SOLICITATION NUMBER _________________

&"Arial,Bold"FOR OFFICIAL USE ONLY

REVERSESIDE

INSTRUCTION FOR COMPLETING THE CONSTRUCTION COST ESTIMATE
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards -- SY, cubic yards -CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur-
nished by the Government, Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit material cost (Col 4) to be supplied. The total cost (col 5) is automatically calculated (Col 3 * Col 4).

Col 6, 7 and 8 Labor Costs. In Col 6 edit the existing equation by entering manhours per unit * Col 2. In Col 7, enter the average wage rate
for the discipline involved. Col 8 is automatically calculated (Col 6 * Col 7).
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 10 Line Total. Col 10 is automatically calculated.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus OH & P will be shown on the last page as follows.

TOTAL MATERIAL COSTS $ - 0

TOTAL LABOR COSTS $ - 0

TOTAL OTHER DIRECT COSTS $ - 0

TOTAL DIRECT COSTS $ - 0

LABOR BURDEN _________% ERROR:#VALUE!

OVERHEAD _________% ERROR:#VALUE!

PROFIT _________% ERROR:#VALUE!

BID BOND _________% ERROR:#VALUE!

TOTAL PRICE ERROR:#VALUE!

DATE NAME

TITLEBY
(Signature)
INSTRUCTIONS TO ESTIMATORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis.
2. In addition to the specific information required by this form, incorporate in and submit with this
form any additional data, supporting schedules, or substantioation which are reasonably required for the conduct of an appropriate review
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, it is critical the estimator's "estimating process" is documented.

SOLICITATION NUMBER _______________

&"Arial,Bold"FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .