This document outlines requirements for pavement repair and resurfacing services at a military installation in California. The contractor will repair defective pavement areas totaling approximately 229,800 square feet across three parking lots, including filling dips, cracks, holes and removing the top two inches of asphalt in one lot. Services also include removing existing asphalt curbs and planters in one parking lot. Work must comply with California Department of Transportation specifications and finished surfaces must drain correctly without ponding. The related federal contract opportunity is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort McCoy, California to provide design-build projects in accordance with specifications, drawings and contract documents for the 63rd Regional District, Region 4 in California.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
james.r.bir Text Box
FRONT POV
james.r.bir Text Box
MEP
james.r.bir Text Box
BACK P
OV
james.r.bir Text Box
MEP
james.r.bir Text Box MEP: Approximately 180,000 SF.
Repair any per-existing defective pavement problems to include all dips, cracks, low spots, poor drainage, surface damage, holes, and/or soft spots. Any and all per-existing defective pavement problems shall be properly repaired, and resolved before resurfacing pavement. The contractor shall applied on the existing surface Type II slurry. Type II should use eighteen (18) pounds of aggregate per square yard and 16% emulsion. Finished paving should surface drain correctly and shall have no depressions that retain runoff water or water pooling
Line james.r.bir Line james.r.bir Line james.r.bir Line james.r.bir Text Box Back POV: Approximately 49,000 SF Repair any per-existing defective pavement problems to include all dips, cracks, low spots, poor drainage, surface damage, holes, and/or soft spots. Any and all per-existing defective pavement problems shall be properly repaired, and resolved before resurfacing pavement. The contractor shall applied on the existing surface Type II slurry. Type II should use eighteen (18) pounds of aggregate per square yard and 16% emulsion. Finished paved surface should drain correctly and shall have no depressions that would retain runoff water or water pooling james.r.bir Line james.r.bir Line james.r.bir Text Box Demo and remove all existing asphalt curbs and planters located in front POV parking lot. See attached drawing for reference.
james.r.bir Line james.r.bir Line james.r.bir Line james.r.bir Line james.r.bir Line james.r.bir Text Box FRONT POV: Approximately 56,800 SF Remove top layers of asphalt only approximately 2inch. The contractor shall repair all low spots to correct drainage and compact base, compaction shall be at 95%. Once compaction is at 95% the contractor shall 2 inch of asphalt. The Front parking area should comply with California DOT Specifications james.r.bir Text Box Remove and replace asphalt curbings at the entrance gate james.r.bir Line james.r.bir Line james.r.bir Text Box Remove All concrete planters james.r.bir Line james.r.bir Line james.r.bir Line