This solicitation requests proposals for a design-build indefinite-delivery, indefinite-quantity multiple award task order contract to provide general construction services at Fort McCoy in Wisconsin. Services will include maintenance, repair, and alteration of real property facilities and will require multiple disciplines. The government intends to award up to ten contracts reserved for small businesses with a size standard of $36.5 million. The period of performance is five years. Offerors must submit proposals within 30 days of the solicitation posting to http://www.fbo.gov. Pricing will be evaluated for fairness and reasonableness. The total contract value is estimated between $25 million to $100 million over the five-year period. The North American Industry Classification System code 236220 applies.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011147728
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 3 is to answ er additional Contractor questions.
POC: Jamie Gregar, jamie.j.gregar.civ@mail.mil
1. CONTRACT ID CODE PAGE OF PAGES
1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SA18R0001
X 9B. DATED (SEE ITEM 11)
19-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Dec-2018
CODE
MICC - FT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
W911SA 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SA18R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
QUESTIONS & ANSWERS
Q1: Will the building for the seed project be occupied during construction?
A1: The building will remain operational during the construction. Access for the operators will be required during construction.
Q2: What do you want to show for duration at each document design phase (65%, 90%, 100%).
A2: In the Basis of Design, Paragraph 1.03 is the Allotted Completion Time requirements. In the solicitation, Sub factor 1 addresses the schedule.
Q3: The RFP notes that the government gest 30 days of allotted time out of the 365 days in the project to review design documents. Do you see this as 30 days at each phase or total?
A3: The Government will use a total of thirty days for review.
Q4: For the seed project, will the building be required to be in service the entire time of the seed project? If so, the panels will need to be slit/spliced rather than attached and then a hole drilled through the surface for the many existing penetrations. Correct?
A4: The building will remain in operation during the construction. Any outages will need to be coordinated with the COR in advance.
Q5: Please provide the approximate NTP date for the seed project as well as its period of performance (pop). This information will be used for the schedule submission as well.
A5: POP is 365 days form the NTP. The NTP is not known at this time.
Q6: Site visit notes / pg 4 of 58 - within the site visit notes it appears that the MAID-IQ submission is to be hard copy only. Please provide the number for original and copies for submission. Page 4 of 58 of the solicitation states that "proposals shall be submitted electronically to the following address...amrdec". Please confirm if both hard copy/hand carry submission and/or amrdec safe access file exchange is required as there is conflicting information the RFP.
A6: AMRDEC has been disabled. A CD will be required for proposal submission along with one hard copy. The solicitation has been revised.
Q7: 13/14 of 58 - We have several projects that we believe with similar size, scope, complexity, relevancy in the $150k - $2mm range. Would MICC consider allowing past performance and relevant experience exceeding the current $1mm cap up to $2mm?
A7: The desired range of project examples is in the $150K to $1M range as this is the range or projects that are anticipated to be required of this MAID-IQ. If a Contractor does not have projects that fall within this range, they may submit higher priced examples for consideration.
Q8: Metal wall panels - Does MICC desire to match the wall panel with any of the adjacent buildings as part of this design-build?
A8: Standard color selection will be used and required to be submitted for color selection.
Q9: Insulation - Does the building require demolition of the existing insulation and installation of new?
A9: No demolition of the existing insulation is required.
Q10: Logistics - Will this building's operations and occupants be closed for the duration of construction?
A10: The building will remain operational during the construction.
Q11: Under C-9 and E-9 of the basis of design it calls to remove and install radio antennas. Is it the base’s intent to leave any communication and alarms operational during removal and reinstall?
A11: The building will remain in operation during the construction. Any required outages will need to be coordinated with the COR in advance.
Q12: Under D-8 of the basis of design it calls for a new K style gutter with open downspouts, but in E-2 it calls to reinstall salvaged downspouts. What direction would the base like to pursue?
A12: Downspouts shall be open faced, do not re-use the salvaged downspouts.
Q13: On A1.4 note #11 where multiple fuel piping is going through the wall panels is it the base’s intent to disconnect the fuel pipes, which will take the fuel system down, and then reconnect?
A13: The building will remain in operation during the construction. The fuel pipes will not be shut down and will remain in place during the construction.
Q14: For the seed project, what gauge of wall panels are required?
A14: Panels shall be 22 gauge thickness.
Q15: For the seed project, is Kynar paint required on wall panels?
A15: All panels are to receive a factory-applied polyvinylidene fluoride.
Q16: For the seed project, discrepancy – Ref D.8 in Scope of Work calls to install new gutters and downspouts, Ref E.2 states to reinstall metal downspouts. Please clarify.
A16: Downspouts shall be open faced, do not re-use the salvaged downspouts.
Q17: For the seed project, new aluminum windows are required. Doors and frames are minimum anti-terrorism. Please clarify if doors need to be anti-terrorism.
A17: Door shall meet UFC 4-010-01.
Q18: Can you please provide an extension?
A18: Yes. The proposal due date is extended.
Q19: Under D. 7 A there is a requirement for the new doors and frames to meet the minimum antiterrorism standards required by UFC 4-010-01. Will the new aluminum windows be required to meet the minimum standard also?
A19: Windows shall also meet UFC 4-010-01.
Q20: There are lightning rods currently not fastened to the roof system of Building 3010. Will the contractor be responsible for recertification of the lightning protection system?
A20: No recertification is required, but the lightning protection system shall meet code.
Q21: Does the base have the record drawings and the shop drawings for the existing pre-engineered building 3010?
A21: No
Q22: Are there CAD drawings available for the seed project to aid in the design and for use in production of the record drawings?
A22: No
Q23: Is there a minimum thickness / gage requirement for the new exterior steel siding?
A23: Panels shall be 22 gauge thickness.
Q24: Page 1 says a offer guarantee is required and page 39 asks for a bid bond however on page 11 Part II Factor 1 only requests a notarized letter demonstrating our ability to bond etc. Do we need a bid bond or just the letter? If we need the bond where should we place it within the proposal?
A24: Performance and Payment bonds will be required on a task order level as stated in block 10.
A bid guarantee in accordance with FAR 52.228-1 is required for the seed project.
Sub factor 4: Bonding Capacity, which refers to the notarized letter, is for the MAID-IQ in it’s entirety. The Government needs to know that the Contractor has the ability to obtain sufficient bonding of at least $200K per task order and $2 Million aggregate.
Q25: RFP Part III – Factor 2 – Past Performance (page 13) requires offerors to forward Past Performance Questionnaires (PPQs) to points of contacts, who in turn are instructed to submit completed PPQs directly to MICC Fort McCoy. In order to provide the MICC with the most complete and accurate information available, we respectfully request leniency in this requirement and that MICC consider allowing the use of other previously completed internal Government reviews (such as Contractor Performance Assessment Reporting System reports) and/or PPQs.
RELYANT recently requested a PPQ from MICC – Fort McCoy for a project which we intend to utilize in support of this solicitation, and the use of this previously completed PPQ would avoid potential conflicts of interest in the pursuit of this solicitation.
A25: The PPQ requirement as stated in the solicitation will not be revised at this time. The source selection team will not be evaluating past performance so there will be no potential conflict of interest.
Q26: RFP Part II – Factor 1(b) – Experience (page 12-13) requires projects with a value range of $150,000 to $1,000,000. Scope of Work (page 46) advises that Task Orders will vary in size from $2,000 to $5 million. As such, in order to best demonstrate the ability to execute the potential Task Order size, we request that the Experience requirement be expanded to allow projects up to $5 million in value.
A26: The majority of the projects for the MAID-IQ will be in the $150K to $1M range. The Government desires to make sure that the Contractors on the MAID-IQ will bid on the smaller projects. The Government will not be revising the desired value range at this time.
Q27: RFP Part II – Factor 1(a) – Technical (page 11) requires that ‘The Technical Part shall not contain the name of the company, subcontractors/team members or individual/persons names…’ However, Sub factor 3: MAID-IQ Design-Build/Design Capability (page 12) requires ‘Offeror shall demonstrate their design-build capabilities by providing…including name(s)’. As such, we request clarification as to the MICC’s intent for offerors to provide a fully redacted Technical Part.
A27: Sub factor 3 has been revised in the solicitation. There shall be no company names in this section.
Q28: Page 9 of the solicitation Part C. explains that the overall proposal shall consist of four (4) physically separated and detachable parts, individually titled: Part I - RFP Documents Part II – Factor 1: Technical Part III – Factor 2: Past Performance Part IV –Factor 3: Price Can you please further explain this requirement? Does that mean you expect 4 separate 3 ring binders- Originals only?
A28: The Government does not want four separate three ring binders for each section. The desire is to have them in individual sections in one three ring binder and easily removed. On the CD, please have four separate files; one for each part.
Q29: Based on the site visit information posted on FBO hard copies of the proposal will need to be submitted instead of transmitting via AMERDEC. Please advise how many copies of each Volume is required.
A29: A CD will be required for proposal submission along with one hard copy. Please have four individual PDF files on the CD; one for each part. One hard copy of the proposal is also required. The solicitation has been revised to reflect this.
Q30: Will the building be occupied the entire time of construction, or can it be vacant just during the sheeting portion (approximately a week) of construction?
A30: The building will remain in operation during the construction. Access for the operators will be required during construction. Vacancy for the sheeting porting will need to be coordinated with the COR in advance.
Q31: Does turning the power off to the building affect whatever is being pumped through the manifold/pumps?
A31: Yes turning the power off to the facility affects operations. The building will remain in operation during the construction. Any required outages will need to be coordinated with the COR in advance.
Q32: The SF1442, 13B, notes that an offer guarantee is required. Please advise if the bid bond should be in Volume I - RFP Documents, Volume II Technical with the Bond Letter, or Volume IV - Price.
A32: The offer guarantee is required for the seed project only. The bid bond for the seed project should be included in Volume IV – Price.
Q33: Volume II Technical, Sub-Factor 1 requires a schedule to be submitted. Please advise what date should be utilized for the Notice of Award date.
A33: Providing a schedule is no longer required.
Q34: Not used.
Q35: Volume II Technical, Factor 1(b) - Experience. Please consider adjusting the construction range to $150,000 to $1,500,000. Design-build projects, since they include design fees, are often larger in overall contract value.
A35: The Government is looking for Contractors that have experience in participating in projects between the $150K to $1M range. Please provide project examples within this range. Should the Contractor not have any projects that fall into this category, they may provide larger project examples to be taken in to consideration.
Q36: Volume III Past Performance - Past Performance Questionnaire. For projects that have a completed CPAR evaluation can that be submitted in lieu of a PPQ? Contracting personnel can be reluctant to complete new PPQs once a final CPAR evaluation has been completed for the project.
A36: For projects that have a completed PPIRS report, this may be used in lieu of a PPQ. Make sure that the proposal includes the PPIRS report and is clearly labeled as to which project it is for.
Q37: Bid Due Date. Please consider extending the due date to the week of January 7th. With the site visit on December 4th, RFIs due on December 10th, bid due on December 19th and the holiday season this is a very tight schedule to get good subcontractor quotes and submit a well thought out proposal.
A37: The proposal due date has been extended.
Q38: Part II FACTOR 1(b) – Experience (page 12/58): Will you hold steadfast to the five (5) projects being between $150,000 - $1,000,000? Can you increase the higher end to $2,500,000?
Often times HVAC and Mechanical projects at bases are larger than your upper-limit of $1,000,000?
A38: Please refer to answer 35 above.
Q39: Part III – FACTOR 2 – Past Performance (page 13/58): Is it possible to extend the date of the MAID-IQ to the 2nd or 3rd week of January 2019? I have 2 of my 5 Past Performance Questionnaires sent out and will send the other 3 this week. However, many of my COR’s and CR’s are on “use it or lose it” time away and I am concerned that there will not be enough working days for my military COR’s to get their responses complete before the upcoming Holidays.
A39: Please see answer 36 and 37 above.
Q40: (b) Part II – FACTOR 1(a) – Technical (page 11/58): For this portion do you want us to provide a separate binder with this information for ease of your team separating it from our entire proposal? The specification as stated shouldn’t have any company nor pricing information and only have our DUNS once on the cover. In preparation I can provide a separate binder within the larger full proposal to make it easier for you and your team to evaluate.
A40: The Government does not want a separate binder.
Q41: How many proposal binders and how many CD’s for submission?
A41: One CD is required along with one 3 ring binder hard copy.
Q42: I recently tried to submit a proposal to USACE through AMRDEC and the site was down “indefinitely”. When I spoke to the contracting officer he said that there was no plan to bring AMRDEC back up online. If it is still down on the 19th, like he said, how would you like us to submit our proposal for the IDIQ Fort McCoy W911SA18R0001?
A42: AMRDEC is no longer available. One hard copy CD is now required with one 3 ring binder hard copy.
Q43: When determining which projects to be listed for Past Performance, is the expectation for the contractor to list projects similar in scope the seed project or to the various projects expected to be posted within the overall MAID-IQ?
A43: Experience must reflect projects requiring multiple disciplines or several projects of multiple disciplines. It is recommended that each project or past work being offered as an example of an offeror’s experience be discussed separately. Projects considered similar to the projects required in this solicitation include major building renovation, facility HVAC & Controls overhauls, building additions, new facility construction, repair/replace or install utilities, and parking lot & roadway construction.
Q44: (December 13, 2018): Please reference page C1.1 Grid Line “B” and “#1” – There is a section of sidewalk dying into grid line “B”, top of page. There is no indication or measurement to the length or stopping point of sidewalk A44: The sidewalk extends to the existing sidewalk intersection. There is a gate in the fence not shown on this drawing.
Q45: The Basis of Design Pg. 2 1.04 B Line 4 states to remove and dispose of metal louvers and trim. Page A1.3 on prints - #4 and #13 state to install salvaged louvers with new trim. Use new or salvage material? Please advise.
A45: Install new louvers along with new trim.
Q46: On Drawing sheet C1.0 Keynote 4 is missing from the list. Can you please add keynote 4?
A46: Remove concrete parking curbs and keep for reinstallation.
Q47: Is there existing metal building insulation?
A47: The building is insulated.
Q48: If there is existing metal building insulation, are we required to replace it?
A48: Do not replace existing building insulation
Q49: Will we need to replace the roof to wall trim?
A49: Replace the roof to wall trim.
Q50: Is this considered a low occupancy building?
A50: Yes
Q51: Will the government be responsible for disconnecting the fuel sources to the pipes that are to be removed and reinstalled. Specifically the jet fuel and gas pipes.
A51: As answered for question 13 - The building will remain in operation during the construction. The fuel pipes will not be shut down and will remain in place during the construction.
Q52: Metal wall louvers – pg A1.3 line note #4 & 13 states: reinstall salvaged metal louvers as indicated. Please clarify.
A52: Install new louvers along with new trim.
Q53: Louver size – one print A1.0 louver size on #6 is 4x2/ #7 is 1’2”x2’4”. A1.1 #6 size is 1x2
– A1.2 #4 size is 4x1’4”, please clarify.
A53: The contractor shall match existing size louvers.
Q54: In Basis of Design-pg 2 1.04 Scope “C” line #7 Exterior Doors/Frames states: removed and salvaged for re-use. On prints A1.3 Line 2 Install NEW hollow metal doors, frames, and hardware. Please clarify if new or salvaged doors.
A54: Install new metal doors and frames.
Q55: Basis of Design pg 3 “D” #3 states- new solid surface window stool at new aluminum windows. Please provide type of material and color.
A55: Solid surface is a man-made material usually composed of a combination of alumina trihydrate, acrylic, epoxy or polyester resins and pigments. It is most frequently used for seamless countertop installations. Standard color selection will be used and required to be submitted for color selection.
New Questions – Amendment 3 – 12-21-18
Q56: Bonding Capacity Letter - In the evaluation criteria of amendment #2 (page 14) it notes that "bonding capabilities are notarized and completed by surety". Please confirm is a notarized letter from the bond agent will be acceptable or if it has to come directly from the surety company.
A56: Bonding capabilities are notarized and completed by surety.
Q57: Part III - Factor 2 - Past Performance, amendment #2 (Page 12) notes "Contractors are no longer required to submit anything for Part III - Factor 2". But then the second sentence states "In conducting the Past Performance Evaluation, the Government reserves the right to use both the information provided in the offeror's Past Performance Volume and …" This contradicts the sentence above. Please advise if submitting a Past Performance Narrative in this volume would still be acceptable and considered by the evaluation committee.
A57: A past performance narrative will not be evaluated.
Q58: Part II - Factor 1(a) - Technical - Subfactor 1 MAID-IQ Design-Build Design Capability.
Please reconsider this section and allow the name/names of the A/E firms and key A/E individuals to be named in the proposal along with the offeror's name. To write a quality narrative it would be best to name the companies and list the individuals' qualifications and their previous design/build project experience. We also request that you allow information on the offer to be included in this section.
A58: No identifying statements should be included in this section. The Technical Part shall not contain the name of the company, subcontractors/team members or individual/persons names and shall identify their firm by DUNS number one time only on the cover page.
Q59: In addendum 2, Question 33 references the schedule and a start date we can use on the schedule. This specific requirement was deleted from the Part II Technical Subfactor 1 Seed Project Executions & Schedule. Is the schedule of the seed project part of the evaluation factor in the MAID IQ Design Build/Design Capability sub factor of the proposal? Is the schedule required?
A59: Providing a schedule is no longer required.
Q60: Reference Page 10 of 62 3. Proposal Content (b) Part II – Factor 1(a) Technical Part II shall not contain the name of the company, subcontractors/team members or individual/persons name of the company, subcontractors/team members or individual/persons names and shall identify them firm by DUNS number one time only on the cover page. We are asked to identify ourselves with a DUNS number on the cover page only. However, this section asks for AE capabilities, experience, etc. Do we identify the AE Firm’s DUNS number as well? If so, on the cover page or in the narrative? Also, in identifying the AE firm for this project, is the GC required to use this AE firm the duration of the contract? Or can the AE be task specific to each individual project?
A60: Provide A&E capabilities, experience, etc as requested. Do not provide names or DUNS numbers. Contract holders will not be required to use any specific A&E firm and/or the firm they spoke to in their proposal.
SUPPLEMENTAL INFORMATION
1. MAID-IQ: provide all labor, transportation, equipment, materials, supervision necessary to perform design-build and fully designed projects for alterations, repairs, maintenance of real property facilities located at Fort McCoy, WI. This will be a five year contract with an option to extend for six months.
MICC Fort McCoy is anticipating awarding up to ten contracts. In the event that there are more than ten acceptable proposals, the ten proposals with the lowest priced seed project will be awarded.
2. All discourse concerning this solicitation and its requirement shall be directed to the Fort McCoy contracting office. Any remarks, explanations, or answers provided by any other government representative shall not change or qualify any of the terms or conditions of the solicitation. The solicitation shall only be changed by a written amendment issued by the Fort McCoy contracting office.
3. All reference documents for this solicitation are available via www.fbo.gov. Potential offerors should utilize this site for all related documents.
4. This procurement is Set Aside for Small Business under NAICS Code 236220 with a size standard of $36.5
Million.
5. Proposal Submission: Proposals shall be submitted prior to the closing date and time identified in Block 13 on the SF 1442 to the following address:
MICC Fort McCoy Jamie Gregar 1108 South R Street Fort McCoy, WI 54656
Electronic submissions via email or fax will not be accepted. Offers shall be mailed through a commercial/Government carrier or hand delivered. Offerors are to supply one hard copy proposal as well as a CD. Please review additional details on proposal submission under the Instructions to Offerors section.
6. Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 180 calendar days from the date specified for receipt of offers.
7. This will be an Indefinite-Delivery Indefinite-Quantity (IDIQ) type contract. Firm Fixed Price Task orders will be issued. The Government is obligated to order only the minimum guarantee. The guaranteed minimum amount is $2,000 for each contract awarded. It is the unilateral right of the Government to exercise the potential six month option of this contract.
8. This procurement will utilize source selection procedures (FAR Part 15.3). Offerors will be evaluated using the criteria in the “Evaluation for Award” as stated in this solicitation. Noncompliance with the solicitation requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
9. SITE VISIT:
***A site visit is scheduled for 4 December 2018 at 10:00AM CST. This site visit is optional.
MICC Fort McCoy – 1108 South R Street, Fort McCoy, Wisconsin.
The POC for the site visit is Jamie Gregar, phone: (608) 388-1007, email: jamie.j.gregar.civ@mail.mil
For Site Visit information, see Site Visit clause 52.236-27, Alt 1. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable). Attendees at the pre-proposal conference/site visit are cautioned that the Government will not wait for anyone who is late or lost and will not hold another pre-proposal conference/site visit. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.
10. Written questions must be furnished to the Government no later 10 December 2018 at 10:00AM CST; in order to ensure a timely response is provided by the solicitation closing date. No questions will be accepted after that date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, offerors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.
11. Contract Administrator: TBD at time of award.
If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.
12. Contracting Officer: TBD at time of award.
13. Contracting Officer’s Representative (COR): Will be appointed on each task order.
14. Postaward Conference: In the event the Contracting Officer decides to conduct a Postaward Conference in accordance with DFARS 242.5, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
15. DUNS NUMBER ______________________________.
16. TAXPAYER ID #______________________________.
17. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.
a. A DUNS number is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.
b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 236220, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 236220, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered offeror.
18. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and
Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.
19. OFFEROR REPRESENTATIONS AND CERTIFICATIONS REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit FAR 52.204-8.
20. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-
26(b)(3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf.
21. In accordance with FAR Clause 52.222-6, the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.
22. ALTERNATE DISPUTES RESOLUTION: In furtherance of Federal policy and the Administrative
Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.
23. REQUIRED INSURANCE:
In accordance with FAR clause 52.228-5 entitled, “Insurance-- Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by state laws
Employer’s Liability Insurance $100,000 per accident General Liability Insurance - Bodily Injury Liability
$500,000 per occurrence
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $20,000 per occurrence
Within ten (10) calendar days after contract award, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained.
24. Federal Holidays are as follows:
New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December
When a holiday falls on a Sunday, the following Monday will be observed as a holiday and when a holiday falls on a Saturday, the proceeding Friday is observed as a holiday by U.S. Government Agencies. Any other Congressional or Presidential imposed Federal Holiday.
If the Contractor for his convenience desires to perform work during other than normal working hours or on other than normal work days, the Contractor shall reimburse the Government for any additional expense occasioned the Government, thereby, such as, but not limited to, overtime pay for Government Inspectors, utilities service, etc.
When required services occur on holidays, work will be performed on either the previous or the following work day, unless specified otherwise.
25. LEGAL COMPLIANCE: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.
26. ATTACHMENTS:
Attachment 1: Seed Project Basis of Design
Attachment 2: Seed Project Drawings Attachment 3: Seed Project ATOPSEC Attachment 4: Consent Form Attachment 5: Experience Overview Sheet Attachment 6: Removed Attachment 7: Seed Project Cost Breakdown Attachment 8: Fort McCoy CAD Standards Attachment 9: Wage Determination
27. Task Order participation expectation: It is expected that awardees of this contract will submit offers on most, if not all, of the Requests for Task Order Proposals (RFTOP’s). If a pattern of non-participation of projects is documented by the Contracting Office, i.e. design-build, low cost projects, etc, the Contracting Office may provide a less than satisfactory rating for this contract in the CPARS system.
INSTRUCTIONS TO OFFERORS
A. SOLICITATION/PROPOSAL REQUIREMENTS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
I – PROPOSAL PREPARATION INSTRUCTIONS
Proposal Submittal and Inquiries.
1. Proposals shall be submitted prior to the closing date and time identified in Block 13 on the SF 1442.
2. Submit signed and dated offer at or before the exact time specified in this solicitation. Failure to provide all required documents or information may exclude the Offeror(s) from further consideration. Failure to provide all required documents or information may exclude the Offeror(s) from further consideration.
3. Proposals shall be submitted prior to the closing date and time identified in Block 13 on the SF 1442 to the following address:
MICC Fort McCoy Jamie Gregar 1108 South R Street Fort McCoy, WI 54656
Electronic submissions via emails or fax will not be accepted. Offers shall be mailed through a commercial or Government carrier or hand delivered. Offerors are to supply one hard copy proposal as well as a CD. (Thumb drives will not be accepted). The CD should contain four separate files, one for each part as required below, in PDF format. Do not provide any Contractor names or other identifiable wording in Part II – Factor 1: Technical.
The point of contact responsible for supplying additional information and answering all inquiries is the
Contracting Officer via the Contract Specialist. Address all questions or concerns the offeror may have to the Contract Specialist and Contracting Officer. The Contract Specialist is Jamie Gregar jamie.j.gregar.civ@mail.mil The Contracting Officer is Steven Bailey, steven.m.bailey2.civ@mail.mil or 608-388-6077. All questions regarding this solicitation shall be submitted in writing via email to Jamie Gregar at the above email address.
General Instructions
1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Part 15.3. Offers will be evaluated using the criteria within Section 00100, “Evaluation Factors for Award.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The Offer. The submission of the documentation specified below will constitute the offeror's acceptance of the terms and conditions of the RFP, concurrence with the Specifications, and the proposed contract type.
3. It is the Government’s intention to award without discussions. Offerors are encouraged to present their best mission capability proposal and prices in their initial proposal submission. However, IAW FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If discussions are determined necessary, the contracting officer shall establish a competitive range comprised of all of the most highly rated proposals. The competitive range may be limited for purposes of efficiency IAW FAR Part 15.306 (c)(2).
4. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
5. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer (KO) in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
6. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
7. All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) web site at http://www.fedbizopps.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
8. Debriefings. The KO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The KO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR
15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
9. If an offer is based on a teaming/partnering relationship or a joint venture, the offeror shall provide with the proposal all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.
C. Proposal Preparation Instructions
1. Each offeror's proposal shall be submitted as set forth below. Proposals which do not follow these guidelines or which do not include the requested minimum information will be eliminated from consideration for award. The overall proposal shall consist of four (4) physically separated and detachable parts, individually titled:
Part I - RFP Documents Part II – Factor 1: Technical Part III – Factor 2: Past Performance Part IV –Factor 3: Price
2. Proposal Format
(a) The proposals shall be organized into four (4) parts. A cover sheet shall be clearly marked as to part number, title, copy number, solicitation identification and the offeror's DUNS. All text shall be single spaced. Pages shall be easily readable. Cross-references should be utilized to preclude unnecessary duplication of data between sections. Page limitations are as follows:
VOLUME TITLE PAGE LIMITS
I RFP Documents No Limitation
II Technical 15 Total (see specific page limitations per sub factor)
III Past Performance No Limitation IV Price No Limitation
(b) Proposal Limitation. The proposal shall not exceed the limits stated above. If the page limits are exceeded, the additional pages will not be considered. The Government will not accept any changes to the contractor’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals). If discussions become necessary, page limitations may be placed on responses to Evaluation Notice (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors.
(c) Page Limit Includes: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.
(d) Page Limit does not include covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.
(e) What Counts As A Page? A page shall be an 8 ½ X 11” sheet of paper. When both sides of a sheet display printed material, it shall be counted as two pages. Letter size and spacing requirements for illustrations and tables can be at the discretion of the offeror but must be easily readable and no less than 10 point font. Fold-outs will be counted as the appropriate number of pages based on an 8 ½ X 11” sheet of paper. Use at least 1 inch margins on the top and bottom and 3/4 inch side margins. The Contractor shall number each page in order to eliminate any confusion. In the event contractor creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.
(f) Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.
(g) Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with a definition for each.
(h) Digital Copies. File names on the CD should be listed as follows:
Name of Company - Part I - RFP Documents Name of Company - Part II – Factor 1: Technical Name of Company - Part III – Factor 2: Past Performance Name of Company - Part IV –Factor 3: Price
3. Proposal Content
(a) Part I - RFP Documents – Offerors are required to submit a completed SF 1442, acknowledgment of amendments, teaming agreements, exceptions, and representations and certifications.
Failure to follow the below Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government.
TAB A, Section A of the Solicitation; The SF 1442 shall be submitted fully completed. The offeror is cautioned that the SF 1442 must contain a signature in block 30 of the form. The contractor shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 30 and with, FAR 52.212- 1, Instructions to Offerors – Commercial Items. The offeror shall provide the name, title, telephone number, and email address of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
TAB B, Teaming Agreements/Joint Ventures – The offeror shall provide with the proposal all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall including information which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.
TAB C, Representations and Certifications – The offeror shall ensure that all representations and certifications are submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely. The electronic annual representations and certifications as required by FAR 52.204-7 shall be completed electronically via the System for Award Management (SAM) web site located at http://www.SAM.gov or completed and returned with the proposal.
(b) Part II – FACTOR 1(a) - Technical. The Technical Proposal shall consist of a written narrative that addresses the following Sub factors:
Sub factor 1: MAID-IQ Design-Build Design Capability Sub factor 2: Bonding Capacity
Part II shall have NO pricing information included. The Technical Part shall not contain the name of the company, subcontractors/team members or individual/persons names and shall identify their firm by DUNS number one time only on the cover page.
Part II shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims. Legibility, clarity and coherence are very important. Your responses will be evaluated against the criteria defined in the Evaluation Factors for Award. The proposal shall not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the Statements of Work;
statements paraphrasing the Statements of Work or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the offeror's proposal.
Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
Part II shall, at a minimum, be prepared in a form consistent with the evaluation criteria for award set forth in the solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the contractor’s technical competence and ability to comply with the contract task requirements specified in the Solicitation. Part II shall be organized according to the following general outline:
Sub factor 1: MAID-IQ Design-Build/Design Capability (no more than 10 pages)
Offeror shall demonstrate their design-build capabilities by providing written evidence of the job qualifications and experience of their certified architectural and engineering design personnel, brief history, and the ability to manage multiple design-build projects simultaneously. No names should be included in this section.
The offeror shall submit a notarized letter completed by their surety company demonstrating the offeror’s ability to obtain sufficient bonding of at least $200K per task order and $2 million aggregate. The notarized letter shall also include how long the Surety Company has provided bonding for the Contractor and the bonding limit for a single project, aggregate amount, and current available bonding.
Part II – FACTOR 1(b) – Experience. Offerors shall complete an Experience Overview Sheet Attachment 5 and a detailed narrative discussing the offeror’s experience listed in Attachment 5 in performing work of similar scope and complexity to that being solicited under this contract.
Experience Overview Sheet must provide three (3) projects, performed within the last six (6) years or currently being performed (at least 50% complete), that best represent the Offeror’s work experience required on this solicitation. Experience must reflect projects requiring multiple disciplines or several projects of multiple disciplines. It is recommended that each project or past work being offered as an example of an offeror’s experience be discussed separately.