Questions & Answers #4 Joint Base Lewis-McChord
MATOC
W911S8-15-R-0004
QUESTION 1: Paragraph 7.3.2.1, Section L, page 51 of 60 states: "...or task orders completed with the past six years from the date this RFP was issued". One of our past IDIQ contracts started on September 2010 and the last task order was completed on September 2013. Since the contract started on September 2010, this is within the six years from the date this RFP was issued. However, Paragraph 3.3, Section M, Page 59 of 60 states: "...must have been performed during the past five (5) years from the date of issuance of this solicitation." Which section is correct and if we submit an IDIQ contract for relevance, and part of the task orders were before the date this RFP was issued, then how is our IDIQ evaluated. We are very confused.
ANSWER 1: Section L, Paragraph 7.3.2.1 refers to Experience and Section M, Paragraph 3.3 refers to Past Performance. Past Performance and Experience are evaluated separately based on the Section M, Paragraph 2.1.2 for Experience and Section M, Paragraph 3.0 for Past Performance.
QUESTION 2: Pg. 46 (Section 2.1.8.5): Proposal Format and Structure. Each volume of the electronic proposal shall be in its own subdirectory on the CD-ROM, sequentially labeled Volume I through Volume IV. Volume IV, Price, shall be submitted on a separate CD-ROM.
Question: Can each Volume be on its own CD?
ANSWER 2: Yes, each Volume can be on its own CD.
QUESTION 3: Pg. 49 (Section 6.1.6):
JV’s are allowed.
Question: We are proposing as a Prime/Sub Team and want to know if we can place our Teaming Agreement here.
ANSWER 3: Since Section L, Paragraph 6.1.6 of the RFP falls under the Paragraph 6.0. Volume I- General & Contract Documentation, you can place the Teaming Agreement in Volume I.
QUESTION 4: SF 1442 (Section 7. & 8): Issued by and Address Offer to:
MICC
Mission Contracting Office
BLDG 2015, MS19, BOX 339500
Joint Base Lewis-McChord, WA 98433-9500 Pg.47 (Section 4.2): Offerors shall ensure that mailed proposals (USPS, FedEx, UPS, DHL, etc.)
are sent to the following address:
Mission & Installation Contracting Command-JBLM Attn: Renee M. Krahenbuhl 100 COL Joe Jackson Blvd, Ste 2001 Joint Base Lewis-McChord (JBLM), Washington 98438 Question: Please clarify what address is to be noted on the proposal and clarify the delivery address
ANSWER 4: The address to be noted on the proposal is noted on the RFP, Standard Form 1442, Block 7.
The delivery address is at in Section L, Paragraph 4.2 of the RFP. These are the same offices and same organization. However, the place of delivery is at Section L, Paragraph 4.2 of the RFP.
QUESTION 5: Pg. 52 (Section 8.0 – 8.1.2):
Volume III – Factor 2: Past Performance Question:
1. Are these to be the same projects that we are submitting in Volume II – Subfactor B: Experience?
Or can they be different?
2. How many projects do you want?
3. Are they to be in the same $ range as the anticipated task orders for this MATOC - $3K - $750K?
4. If we have a completed CCASS or previously completed PPQ, may those be submitted as
Attachments outside of the page count in lieu of your PPQ?
ANSWER.
1. The projects submitted in Volume II can be the same or different than the items submitted for Past Performance.
2. As stated in the RFP, Section L, Paragraph 8.1.2, “At a minimum, the Offeror shall submit three (3) Past Performance Questionnaires/ Specific Relevant Contracts.” See Amendment 3.
3. No. As stated in the RFP, Section L Paragraph 3.4, “Relevant contracts include projects consisting of any performance on multi-discipline construction projects involving repair, alteration, or new construction of real property as well as contract compliance in supplying indefinite delivery, indefinite quantity construction services with a total contract value of at least $5,000,000.00.”
4. Completed CCASS or previously completed Past Performance Questionnaires (PPQ) may not be submitted as attachments outside of the page count in lieu of PPQs.
QUESTION 6: The following are missing from Section L (6.1.5.2) & (9.3) Question: Will these be provided or considered n/a?
ANSWER 6: These paragraphs were omitted in error and shall be considered N/A.
QUESTION 7: Section L, 7.3 Volume Organization requires that offerors provide a Cross Reference Matrix. Please clarify the information required in this cross-reference matrix, and/or the preferred format for this document.
ANSWER 7: The cross-reference matrix is required as an aid to reviewers. The information contained in the matrix is to let the evaluator know where the requirements are addressed within the proposal.
QUESTION 8: Section L 2.1.8.6 requires that we provide both a “list of key terms” and a “list of acronyms and abbreviations” used in the proposal. Please clarify what is meant by the “list of key terms”.
ANSWER 8: Key terms are those terms that the Offeror submits that assist the Government in understanding its proposal.
QUESTION 9: Section L, 2.1.8.7 requires that offerors “Submit an electronically encoded cost/price model in support of the proposed cost/price.” Please clarify what is meant by “electronically encoded”.
ANSWER 9: Electronically encoded means a submission in an electronic form with formulas that are viewable by the Government.
QUESTION 10: Reference Amendment 0003 Srws 13MAY2016, Section L 8.1.4, Submission Requirements, last bullet titled Specificv Relevant Contracts Format. The narrative indicates “Sheets in accordance with Attachment 3 and are…..”. Attachment 3 has not been included as part of the amendment, will it be released in another forthcoming amendment?
ANSWER 10: Attachment 3 was provided in Amendment 1.
QUESTION 11: In Volume III - Past Performance, in reference to Section L, Paragraph 8.1.4, please clarify if the government will only accept IDIQ contracts in the "Specific Relevant Contracts Format" or if you will also accept single projects that illustrate our ability to perform multi-discipline construction efforts involving repair, alteration, or new construction of real property. If you will accept single projects, we respectfully request that you lower the required dollar value from "at least $5,000,000.00" to at least $3,000.00, in accordance with the expect minimum dollar value of each task order under the IDIQ
MATOC.
ANSWER 11: The Government will accept other types of contracts in the “Specific Relevant Contract Format.” However, as stated in Q&A 2, Answer 14, “Attachments 1 & 3 are for contract information, not individual projects/task orders.” Attachment 3 is the Relevant Contract Reference Sheet and Attachment 1 is the Past Performance Questionnaire.
QUESTION 12: During the site visit, it was noted, there is a fairly short and steep transition from the existing tile floor into the carpeted area intended to receive tile. Once converted to a hard surface, spilled water could create a safety hazard at this location. Is the intent of paragraph 2.2.1 to:
Allow the contractor to lengthen and reduce the slope of the transition area?
Require the contractor to bring the grade of the entire area, to receive tile, to the same grade as the existing tile area?
ANSWER 12: Contractor shall not be required to bring the entire area up to the grade of the tile.
Contractor shall provide an approximate 5% grade from the existing tile down to the new tile area. An amendment addressing this issue is forthcoming.