This document is a Questions and Answers file from an elevator site visit addressing clarifications to a Performance Work Statement (PWS) for elevator maintenance services under contract W911S726RA008.
The document clarifies three key PWS requirements: (1) For repairs exceeding 32 hours, the awarded contractor—as the subject matter expert—is responsible for providing written documentation to the government within 10 business days that includes scope of work, estimated parts, materials, and labor hours; the outside contractor does not prepare this documentation. (2) All elevators at the facility require load testing and certification per manufacturer specifications during the base year to establish a baseline for the contract duration, not exclusively those with overspeed valves and traction elevators. (3) Elevator #1 in Building 1601 Water Treatment will not be maintained under this contract, and the TE2 (Elevator Locations and Data) file will be revised accordingly. These clarifications establish the contractor's responsibilities for major repair coordination, comprehensive baseline testing requirements, and correct the scope of equipment to be maintained.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Elevator Site Visit Questions
1. PWS 1.15.4 – Repairs requiring more than 32 hours: Repairs that require over 32 hours shall be performed by an outside contractor. When this is identified the contractor is required within 10 business days to provide written documentation with brief scope of work, to include estimated parts, materials, and labor hours.
Q: Is outside contractor the one who writes the scope of work?
A: No, It is the responsibility of the Contractor awarded this contract as the subject matter experts to advise the government in writing to ensure proper repairs are performed.
2. PWS 5.5.4 – At the beginning of the contract ALL elevators in the Base Year require a Load Test and certification. Additional load tests required as COR or KO deem as needed.
Q: The PWS states ALL, should this be [exclusively] for units that have the overspeed valves and traction elevators or ALL units?
A: All will be load tested per manufacturer specifications in the base year to create a base line for the duration of the contract.
3. TE2 – Elevator Locations and Data Q: Elevator #1 Building 1601 Water Treatment – Can the government confirm this is part of the current W911S726RA008 scope? [If not, can the government correct the file?] A: This elevator will not be maintained under this contract and TE will be revised to reflect.