This document contains questions and answers related to a solicitation for solid waste services at Fort Leonard Wood in Missouri. The solicitation seeks refuse collection and disposal, recycling, and environmental services for the installation and LORA. Services include collection from over 600 containers ranging from 3-30 cubic yards in size, recycling services at the center including separation and baling, collection of bulk items, used oil and electronics, and contaminated soil. The incumbent contractor provides services at LORA under a subcontract. Questions clarify contractor responsibilities for container maintenance and replacement, equipment use and location, and materials handling. Pricing will be evaluated with the lowest price receiving highest consideration, provided the offeror meets business qualifications as an 8A registered small business.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

KTR QuestionGovernment Responses
Statement: There are two (2) different PWS in the solicitation documents. Both have the same dates and revision number.

1. Attachment 1 - solid waste FLW - rev 0.5

2. Standardized PWS Overarching Base Ops PWS (OPORD Annex A)- FLW Solid Waste (Reviewed) rev 0.5

Question: Can the Government indicate which PWS is the controlling document?Both are applicable - Attachment 1 provides details related to trash services and recycle center operations. The Standardized PWS… is most administrative issues.
Statement: While looking at the TE 4 and seeing Container ID Numbers and Bone Yard containers, it is uncertain if the containers listed are government-provide containers or not.
Question: Can the Government clarify if these are government provided containers and what containers the contractor is to provide?All containers listed in the TEs are government provided.

Contractor provides containers in the event that government containers are exhausted.

Statement: PWS Attachment 1 indicates that contractor are to empty compactors. I did not see any compactors in TE 2.
Questions: Can the Government clarify if compactors are to be serviced and if so, add them to TE 2.Compactors are contractor owned and serviced. A list of current compactors and locations follows:

Exact size 30CY:

•BLDG 310 – 1 trash compactor
•BLDG 485 – 1 trash compactor
•BLDG 487 – 1 trash compactor
•BLDG 930 – 1 cardboard compactor
•BLDG 836 - 1 cardboard compactor
•BLDG 820 - 1 cardboard compactor
•BLDG 653 - 1 cardboard compactor
•BLDG 630 - 1 cardboard compactor
•BLDG 2100 - 1 cardboard compactor
•BLDG/DFAC 2105 - 1 cardboard compactor
•BLDG 2323 - 1 cardboard compactor
•BLDG 3223 - 1 cardboard compactor
•BLDG/DFAC 1010 – 1 trash compactor and 1 cardboard compactor
•BLDG/DFAC 1784 – 1 trash compactor and 1 cardboard compactor
•BLDG 3200 – 1 trash compactor
•BLDG 3203 – 1 trash compactor
•BLDG/DFAC 6111 – 1 trash compactor and 1 cardboard
•Hospital – 1 trash compactor and 1 recycle compactor
•BLDG/DFAC 1792 – 1 recycle compactor
•Commissary – 1 trash compactor
Statement: PWS 2.2.2.1.1.2 states the white paper containers that are between three (3) and eight (8) cubic yards shall be serviced monthly. But TE 2 appears to show that collections are one time weekly.
Question: Can the Government clarify the service frequency of not just white paper but all services by including a Service Frequency column in TE 2? How many quantity of each size of this paper containers are required?TE 4 governs

Frequency and sizes are spelled out in this element

TE 2 only calls out the size of the container at each location

Statement: PWS 2.3.1 Recyclables Segregation. The Contractor shall segregate recyclable materials by commodity type.
Question: Are the recyclables collected in containers assigned to each type of material or are they commingled and separated after collection?Separated after collection
Statement: PWS 2.3.1.2 Bulk Items. The Contractor shall collect and dispose of bulky items (e.g., shipping cartons, scrap lumber, discarded furniture, appliances, toys, wood pallets) placed at collection stations, curb side or outside a refuse container.
Question: Historical, are bulk items generated at a level that a stake bed truck with lift gate is required or will a pickup truck generally be able to handle the workload.Either may be used, depending on the type of refuse encountered
Statement: PWS 2.3.1.5 Toner Cartridge Items. The Contractor shall palletize and shrink wrap all cartridges and electronics for shipment if collected by the Government for selling. I did not see toner cartridges listed in TE 5.
Question: Is the Recycle Center the collection point for toner cartridges or will the contractor need to collect the toner cartridges from the generation locations?The recycle center is the collection point for toner cartridges
Question: Who purchases the shrink wrap, bale wires, etc.?These should be provided by the contractor
Statement: PWS 2.3.1.8 Brass Deformer. The Contractor shall deform all expended brass ammunition casings (.50 caliber and below) and containerize the deformed casings into boxes.

I did not see brass casings listed in TE 5 non did I see the equipment to deform brass in the GFE list.

Question: Does the Recycle Center have the a brass deformer or will the contractor need to provide the equipment?Brass collection is not applicable to this contract - managed by DPW Environmental under separate contract.
Question: Historically, how many tons of brass casings are processed annually?Brass collection is not applicable to this contract - managed by DPW Environmental under separate contract.
Question: How provides the boxes?These should be provided by the contractor
Statement: TE 4 has a column called "Container ID”. Our containers already come with a visible ID numbers on them.
Question: Will the contractor be required to use government-issue serial numbers on contractor supplied containers?Containers provided by the contractor may be marked in accordance with their internal requirements
Statement: TE 4 container inventory has a column called “RD”.
Question: What does this represent?This represents the route identifier from the current contractor
Statement: TE 4 list Multi Containers in the “Description” column. Since they are not listed in the GFP Attachment, it must be assumed they are provided by the contractor.
Question: What are the specs for these containers and QTY required?TE 7 list GFP that are serialized. All items listed in TE4 are government owned as well, but are not serialized for the purposes of hand receipts.
Statement: 7.4.1 Facilities The Government will provide equipment and material storage space where space is available during the term of this contract. This storage area is for the performance of solid waste services.

Question: Can the contractor park their waste collection vehicles in the staging area overnight if the vehicles are used solely to support contract services?

Question: what size is the on-site staging area? Contractor owned vehicles used in support of trash collection may be parked in the staging area overnight.

Size of the compound is approximately 100,000 square feet (includes the recycle center building) Statement: Bidding Instructions states only pricing sheet is required to be submitted?

Question: Please confirm there is no technical nor past performance volume is required as part of the quote submission.

Question: Per Section 6 of the PWS under Deliverables there are few documents noted to be submitted with the proposal. Please confirm the quote submittal requirements.Answer1: Each Item/CLIN line must have a quoted amount.
Statement: Bid Opening.
Question: Can the government provide a teleconference number for potential offerors to attend the bid-opening?Bid opening is in-person only. Open to public.
Statement: 2.1.2.4 Waste Soil.
Question: Can government provide historical data on this as-needed service in the past few years? Quantity of requested pickups and tonnage data.TE 5 includes the item "Contaminated Soil" as a monthly average. This average covers the prior 4 years of the current contract.
Statement: 2.4.12 Container Cleaning
Question: Is there a cleaning location provided by the government on the base?Container cleaning may be done within the recycle center compound
Statement: 3.4.13.1.6 Recycling Signage

Question: How many government containers that the contractor needs to place decals on?

Question: How many government containers are provided under this contract? All items listed in TE 4 are government owned.

Statement: 2.4.13.2 Container Painting

Question: How many containers historically have been requested by DPW to be painted? Can you provide data for past few years?As part of monthly inspections for repairs, touch ups may be part of the repair process.
Statement: 3.3 Government Equipment Upkeep

Question: Will the contractor be reimbursed or who pays for the upkeep of government equipment?

Question: What has been the historical dollar value per year on total repairs/maintenance and upkeep?Government furnished equipment in TE 7 will be maintained and serviced by Logistics Readiness Command (LRC) personnel. Maintenance frequency is as required by LRC regulations.
Statement: PWS Section 3.2 Transition/Phase-in Period
Question: In order for the government to obtain competitive bids, understanding the size and magnitude of this contract, the government must consider providing any new contractor 90 days of phase-in period. With the current delays is supply chain it is impossible to order, receive, decal and place over 600 containers within 30 days. Please consider providing 90 days phase-in period.Containers and equipment are provided. 30 day transition is intended to transition operations processes.
What is the schedule and location of the Brass Deformer mentioned at PWS Attachment 1 -- - 2.3.1.8?Brass collection is not applicable to this contract - managed by DPW Environmental under separate contract.
Where is the scrap metal taken for recycling?Contractor is responsible for marketing all recyclable material (PWS Atch 1 paragraph 4.2.1)
How is the proposal to be evaluated?Lowest price in addition to meeting qualifications as an 8a registered small business. Also, capabilities of performance is considered.
PWS Base Operations – page 26 - 7.1.1.39 – Key Personnel?
Do we need to list the names of Key personnel in our proposal?yes
How many compactors are in use at Fort Leonard Wood and who provides the compactors?See similar item above
Why is the first option year only 6 months and the whole term is 4 years 6 months?This is the structure that was provided by the Governement organization.
Since substantial equipment will need to be purchased does the government intend to renew all options?

This shall be determined based on contractor performance in order to renew options.

If there any truth to the rumors that the City of St Roberts will be awarded the contract at an option year?We do not have that information.
From reviewing all the documents provided we gather the proposal will consist of the following:
a.Quality Control Plan
b.Subcontractor Management Plan
c.Key Personnel with resume and organization chart
d.Spill Plan
e.Transition Plan – Phase-In and Phase-Out

Please clarify if all information should be submitted in one document or broken into various volumes.

At time of bidding, please provide only quoted amounts for each CLIN and work specifically addressed in the provided PWS.

Yes, include resumes If the submission is to be separated into volumes – how many volumes and what should each volume contain?

See above response.

Section 2.4 and 2.4.1 PWS Rev 0.5 – states the contractor shall maintain historical properties and archaeological sites. Please provide more information on what role the contractor is required to fulfill in this area.
Contractor will notify DPW Municipal Services COR of suspected or known disturbance of historical/archaelogical sites. Known site locations will be coordinated with DPW Environmental Division
Please clarify that the only resume required is for Program Manager.

Resumes should be included for all those in the org chart(ref 21.11.1.1)

Please clarify the qualifications required for the position of Program Manager.
Program Manager duties are at the discretion of the contractor. The intent of the government is to have a designated responsible party on site to respond to management, performance and/or emergency issues.
PWS 2.1.10 – Subcontract Management – are these subcontractors currently providing services or will the offeror have to hire subcontractors? If the latter, what roles will these subcontractors fill?Subcontractors are at the discretion of the prime contractor. They are not required. At present, only services at LORA are subcontracted.
The solicitation calls for a mail-in submission. It does not specify the number of copies required, formatting, font, number of pages, etc. Will this be clarified or is it up the to Offeror to determine these details?

"Handcarried bids/proposals may be turned in at the Receptionist Desk, Building 11400, located at 8112 Nebraska Avenue, Fort Leonard Wood, MO, Monday thru Friday, between the hours of 7:30 a.m. and 4:00 p.m. MAILED: Bids/proposals mailed for submission shall be mailed to Mission Installation Contracting Command, Fort Leonard Wood, 8112 Nebraska Avenue, Building 11400, Fort Leonard Wood, Missouri 65473 when using regular postal service. For any express or overnight mailing service, the address to be used is Mission Installation Contracting Command, Fort Leonard Wood, Building 11400, 8112 Nebraska Avenue, Fort Leonard Wood, Missouri 65473."

Only 1 copy of bid is needed. Formatting, font, and number of pages is at the descression of the offerer. Quoted amounts can be handwritten or typed. Please make sure company information and signature is present in bid.

Can you give us an estimate of the number of staff currently employed on this contract and the various positions filled?No
TE 4 – Several entries list “needed lots of attention/Needs repairs/sitting in bone yard/Hwy 17 shop for repairs/bad bottom – Please clarify offeror’s responsibilities with regard to these notations.TE4 is full inventory, so it reflects all containers on site. Those that are determined to be beyone repair are in process of being removed from the installation. Since bid release, any container marked "in bone yard" has been recycled.
Is Past Performance required.

Past performance is not required for submitting a bid. This is determined upon award.

For the Quality Control Plan (QCP):

a. Could you provide an example or a template of a well-structured QCP, especially how each Contract Line Item (CLIN) service can be extracted individually?

b. What specific methods are expected for identifying and preventing defects in the quality of services performed?

c. Could you clarify the qualifications or criteria for someone to be considered a Quality Control Inspector?

d. Could you clarify the process and timeline for approval of the QCP and any subsequent changes to the plan?

C. Does the QC Manager need to be a separate person from the Project Manager? Can this be combined duties? Contractor is responsible for the development of a quality control plan, no template is provided.

Inspection and performance criteria are identified in TE 1 PRS (Performance Requirements Summary) For the Quality Assurance Surveillance Plan (QASP):

a. Can we clarify how and when the contractor will be able to access the QASP since it is not part of the solicitation?

b. How often is the QASP updated, and what specific performance results would trigger an update?

c. Can we get more details on the specific criteria and metrics that will be used to evaluate the contractor's performance?

d. What constitutes non-conforming services, and what is the process for identifying and rectifying these services?The contractor is provided TE 1 - Performance Requirements Summary (PRS) which contains the same information as the QASP. Performance metrics are contained in the PRS
How Many Miles is the longest route of service for Refuse Collection?We do not have that information.
What Landfill is being utilized?
Is the Landfill on Post?There is no landfill on the installation. Contractor is responsible for making arrangements with off site landfills.
Can we store fuel on Post?No
Is there a Parking Location for our Vehicles on Post?Contractor owned vehicles used in support of trash collection may be parked in the staging area overnight.

Size of the compound is approximately 100,000 square feet (includes the recycle center building)

Can we wash our Vehicles at the Post Wash Rack?No
Is there a Refuse Transfer Station on Post for our use?There is none on post. The nearest transfer station is in the city of St Robert MO
Recycle Center equipment maintenance is performed by whom?Government furnished equipment in TE 7 will be maintained and serviced by Logistics Readiness Command (LRC) personnel. Maintenance frequency is as required by LRC regulations.
Does the Government provide office space, electricity, Rest Rooms, and water for our use?These are provided in the Recycle Center building
Will the Government please confirm that the base year is 6 months and not 12 months?Confirmed
Will the Government please confirm that the successful contractor can operate & administer the contract out of the Recycle Center BLDG 2549?Confirmed
Will the Government please confirm that the successful contractor can park/store vehicles and equipment on Base overnight at the Recycle Center BLDG 2549 for the duration of the contract?
3a. If the contractor cannot utilize the recycling center, is there another location on Base the contractor can park/store vehicle, equipment(s), or an office trailer in order to operate the contract?Contractor owned vehicles used in support of trash collection may be parked in the staging area overnight.
Will the Government please confirm that the front load and roll off containers listed in TE2 are to be contractor furnished?All containers listed in the TEs are government provided.
CLIN 0003 for the Refuse Disposal Svcs/2.8.4.1 states that “The Contractor shall bid the cost per ton, but shall be paid based on verified and documented tonnage disposed of.” If the Government is truly reimbursing the contractor for actual cost of disposal, would the Government consider removing this CLIN from the evaluation process to eliminate a contractor bidding a cost lower than the actual cost in order to receive a lower price evaluation? Ex: If the true cost is $40.00 per ton and a contractor bids $30.00 per ton for all option years. The way it is written the Government would pay on the $40.00 per ton, but the contractor bid $30.00 per ton to receive a lower price evaluation.

-CLIN 0003/1003, et seq; If the cost of disposal per ton goes up during the term of the contract, will the Government allow the contractor to submit a price increase modification to cover the increased cost of disposal?

changes in disposal fees can be submitted to KO as request for adjustment TE 7/Attachment 1 4.8 states “Used Oil: The Contractor shall monitor the use of a Government furnished 1000 gallon used oil-recycling tank at building 2549 (FLW Recycling Center), and two Government furnished 5,000 gallon used oil storage tanks #2 and #3 at building 2582.” However, TE 7 does not have them listed as GFE.

Would the Government please advise if these tanks are GFE and add them if confirmed?The tanks are GFE
Would the Government please provide pictures of the Recycling Center processing area, baler(s) and all equipment (listed in the TEs), and tipping floor so the contractors can propose accurately on the requirements specified in the PWS?

Because the service is for the entire installation and LORA, there will not be a formal site visit. However, vendors can get a visitor pass for FLW and come get a look around on their own to get a better idea of the size and scope of the request.

Attach 1 / 4.3.2 Source Separation. Is there an assembly like separation line for sorting out the single stream recyclables? How many personnel does the current contractor have?
Will the government provide pictures?There is space allocation for separation within the recycle center.
Attach 4.1.2 Does the Recycling Center have to be manned during these business hours?Yes
Can the Government please provide the number of FTE’s that are currently working at the recycling center?No
Attach 1; Sec 4.0/4.2.1

If the commodities that are collected and recycled cost the contractor money to process or ultimately dispose of does the Government or the Contractor pay for those costs?

-If the contractor has to pay for those costs under what line item does the contractor bid that cost?Disposal costs are paid by the governmet at the rate established by the local transfer station
How far the is LORA from the main post?approximately 55 miles
Attached 1/Sec 6.0 FLW Brush/Stump Area:

Does the contractor need any specialized equipment for the operation of this area or does the Government handle the material that is brought on site on its own?

Would the Government please provide pictures of the area since there is not a site visit?

Because the service is for the entire installation and LORA, there will not be a formal site visit. However, vendors can get a visitor pass for FLW and come get a look around on their own to get a better idea of the size and scope of the request.

Attached 1/Sec 5.0 FLW Compost/Clean Fill Area:

Does the contractor need any specialized equipment for the operation of this area or does the Government handle the material that is brought on site on its own?

Would the Government please provide pictures of the area since there is not a site visit?

Because the service is for the entire installation and LORA, there will not be a formal site visit. However, vendors can get a visitor pass for FLW and come get a look around on their own to get a better idea of the size and scope of the request.

Attach 1/Sec 7/0 FLW E Waste Recycling:

Who is the current vendor for this collection?Contractor is responsible for managing arrangements for waste recycling
Attach 1/Sec 8.0 FLW Dumpsite Cleanup:
Are the dump sites in random locations or are they picked as needed through FLW and LORA?Dump sites are random. They are typically reported to DPW who then make notification to the contractor.
Attach 1/ 2.0 Scope states” The Government reserves the right to direct the Contractor to relocate refuse and recoverable material collection points, to decrease or increase the number of collection points without additional expense to the Government as long as it does not increase the overall collection points by more than +/- 15% of the original number. In the event of demand fluctuations, frequency adjustments above or below 15% must be approved by KO.”

Does this mean that that contractor has to add/deduct containers at no cost when new buildings are added, at any service level/frequency, including roll-offs?

Or is this written specifically this was so that the contractor provides unscheduled/relocations/extra pickups etc at no additional cost? This item addresses adjustments to locations and frequencies contained in TE 4. As occupancy changes, the contractor will accommodate increases or decreases in locations and frequencies within 15% of the total at the start of the contract period.

Unscheduled pick ups are covered separately under paragraph 2.7.4 and 2.7.5.

Attach 1/ 2.1 Mattresses:

Who is the current mattress vendor and how are they handled?Contractor is responsible to manage haul and disposal
Attach 1 / 4.8.4.4 Used Oil:

Can the Government please send pictures of BLDG 2582 and the oil containers/collection process?

Because the service is for the entire installation and LORA, there will not be a formal site visit. However, vendors can get a visitor pass for FLW and come get a look around on their own to get a better idea of the size and scope of the request.

Attach 1 / 4.8 Used Oil.

Are the tanks government or contractor own?

Who currently does the hauling of the oil and will the government provide pictures? Tanks are government owned

Contractor is responsible to manage haul and disposal Attach 1 / 3.2 Transition.

Please confirm 30 day phase in/out.

Will the government provide a lay down yard during this time?That cannot be determined at this time. Will be determined at time of award.
Attach 1 / 2.1.11.1 Key Personnel.
Can the PM hold multiple roles?This is at contractor discretion
TE 2

What style are the 6 CYD and 8 CYD?

Are they slant tops or straight tops with sliding doors?

Also in the TE there is a “7 CYD”. Is this a typo? Please provide pictures if possible. 8 and 6 CY containers are slant top, Poly lids.

7 CY container is a typo - should read 8 CY Attach 1 / 2.3.1.2 Bulk.

How often does bulk pick up occur around FEL cans?We do not have detailed information.
TE 2:
Does the government have the current route sheets?No
Attach 1 / 2.3.1.8
Brass Deformer. Is this government or contractor owned?Brass collection is not applicable to this contract - managed by DPW Environmental under separate contract.
Attach 1 / 2.4.13 Container Painting and Repair.
In the FEL container repair, only includes paint, lid and door repairs correct?Repair also includes welding as required, based upon inspection by DPW in paragraph 2.4.13.2.1
Attach 1/ 2.4.13 Container Painting and Repair.

If a FEL can is deemed unserviceable, but still has good lids and doors.

Is it acceptable to cannibalize the good lids and doors for future repairs for serviceable ones?Yes
TE 2:

Are there any gable top style roll offs on this contract?

If so, please provide pictures.No
TE 2 :
On average, how many roll off pulls per month are there?Refer TE 5 - Workload data
Attach 1 / 4.1.6 Recycling trailers.

Are the recycling trailers government owned or contractor owned?

Please provide pictures of the trailers?Government owned
Attach 1 / 4.8.4.10 Hazardous oil.

Does the oil that cant be recycled happen often?

Is the government or the contractor responsible for creating the manifest?

If contractor is responsible, will the contractor be reimbursed?

Because the service is for the entire installation and LORA, there will not be a formal site visit. However, vendors can get a visitor pass for FLW and come get a look around on their own to get a better idea of the size and scope of the request.

Attach 1 / 6.4 Spring and Fall cleanup.

What type of materials are being generated?

If its yard debris, is the contractor responsible for the raking of leaves?

Will the government provide bio-degradable bags?The contractor is not responsible for yard clean up. Bags are provided to units/personnel supportin clean up.
Attach 1 / 6.6 Furnishing Recycling Tube and Tote Containers.
Are these contractor owned?This item is no longer applicable to this contract.
1. Section B. 0001AC, 1001AC, 2001AC, 3001AC, 4001AC, 5001AC.
Is the disposal cost reimbursed by the Government? If so, would the Government make these items no bid and fix the cost?Disposal costs are paid by the governmet at the rate established by the local transfer station
2. Section B. X001AE Recycle Incentive Fee.

Will the Government please define how to calculate this response?

PWS Attch. 1., 4.2.1 states the Contractor will be paid 5% of proceeds for the sale of Recyclables.Checks received by the contractor for recycle proceeds are turned over to the COR. The contractor may make claim to 5% of all these proceeds from recycling.
3. PWS 2.5.1.4 “Any space required by the Contractor for office or administrative purposes aside from the Recycle Center must be acquired off the installation.”
Will the contractor be permitted to house trucks and equipment at the Recycle Center?Contractor owned vehicles used in support of trash collection may be parked in the staging area overnight.
4. PWS 7.4.2
Will the Government provide internet service to the Recycling Center as part of the utilities?Yes, but non-secure
5. PWS Attch. 1., 2.1.2.4 “Special Waste” generally requires a Profile of the contaminates in the soil which often requires sample testing in a lab.
Is the Government responsible for this process?Yes - DPW Environmental manages the determination of hazardous waste
6. PWS Attch. 1., 2.3.1.9 Mattresses generally have a disposal cost associated whether they are recycled or disposed.
Will these costs be reimbursed by the Government?Yes
7. PWS Attch. 1., 2.4.9 “Container Replacements. Deteriorated solid waste containers shall be replaced or repaired by the Contractor at no cost to the Government. The Contractor shall replace containers within two (2) working days of receiving notification. The Contractor shall furnish replacement containers when containers are removed for cleaning, painting, maintenance, or repair.”

In the absence of a site visit, contractors have no information on which to base an estimate on repair cost exposure.

Will the Government, at a minimum, add a bid item for container refurbishment each?This has historically been factored into the bid price for refuse services
8. PWS Attch. 1., 2.4.13.1
Will painting and refurbishing of containers be permitted on the Fort?Yes
9. PWS Attch. 1., 2.7.1 and 2.7.6,
How will the Contractor be compensated for these additional services?Using the history provided in TE 5, this has historically been factored into the bid price for refuse services
10. PWS Attch. 1., 4.3.1.2 and 4.3.2

There appears to be a conflict between these two sections, 4.3.1.2 says to receive and separate and 4.3.2 says not to separate.

Could the Government please clarify this? 4.3.2 is intended to keep refuse material outside the Recycle Center. Any mix of refuse and recyclables should be handled outside the Recycle Center.

4.3.1.2 is concerned with the sort/separate of recyclables only

11. PWS Attch. 1., 4.3.5 “Non-recoverable items: Items erroneously delivered to the Recycling Center that cannot be processed shall be separated and disposed of in a lawful manner at the Contractor's expense.”

Will the Government please confirm our understanding that the Contractor may refuse to accept material at the Recycle center if it is not recoverable/processable? Confirmed - a separate contract is in place with the local transfer station to receive refuse directly from units/occupants at their responsibility.

If the material is not recycable, reusable, or recoverable, then it is trash and should be put in a dumpster and processed as trash waste would be processed.

12. PWS Attch. 1., Our understanding is that if an oil spill is caused by the Contractor, then, the contractor is responsible for cleanup. If spill is caused by any third party, the Contractor is not responsible for the cost of cleanup.

Please confirm our understanding is correct.Confirmed
13. PWS Attch. 1., 5.2 and 6.2, Clean fill and contaminated fill are often identical in physical characteristics.
Will the Government please provide the current procedure to “ensure that no waste material is disposed of in the compost/clean fill area which violates the definition of clean fill and/or yard waste.”Contractor will propose procedures to meet this requirement as part of their bid
14. TE 4. Inventory.
Will the Government please provide the number, by size, of the containers required to be provided by the Contractor?Contractor provided containers are as needed to supplement requirements that can not be met by governemtn provided containers
15. TE 4. Inventory.
Will the Government please provide the number, by size, of the containers provided by the Government?refer TE 2
16. TE 5. Workload Data.
Will the Government please provide the average number of hauls per month to service the average monthly weight provided of contaminated soil?We do not have that information.
17. Submittal: Will the Government please confirm that the list of items below is complete for the acceptance of a Proposal from the Contractor?

If not please respond with an accurate list.

a.Cover Page with Name, Address, Unique Entity Identifier and EFT if applicable.
b.Completed Section B – Supplies or Services and Prices
c.Key Personnel to include resume, contact information and organization chart.
d.Spill Plan
e.Transition – Phase In/Phase Out Plan
f.Quality Control Plan
g.Subcontract Plan."Handcarried bids/proposals may be turned in at the Receptionist Desk, Building 11400, located

at 8112 Nebraska Avenue, Fort Leonard Wood, MO, Monday thru Friday, between the hours of 7:30 a.m. and 4:00 p.m. MAILED: Bids/proposals mailed for submission shall be mailed to Mission Installation Contracting Command, Fort Leonard Wood, 8112 Nebraska Avenue, Building 11400, Fort Leonard Wood, Missouri 65473 when using regular postal service. For any express or overnight mailing service, the address to be used is Mission Installation Contracting Command, Fort Leonard Wood, Building 11400, 8112 Nebraska Avenue, Fort Leonard Wood, Missouri 65473."

Only 1 copy of bid is needed. Formatting, font, and number of pages is at the descression of the offerer. Quoted amounts can be handwritten or typed. Please make sure company information and signature is present in bid.