FOLLOW UP Questions Answered.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Fort Leonard Wood Trash Refuse
- Solicitation number
- W911S7-23-B-0004
About this file
This document contains clarification questions and answers regarding Solicitation Number W911S7-23-B-0004 for Fort Leonard Wood trash and refuse services. The solicitation involves refuse collection, disposal, and recycling services for Fort Leonard Wood and surrounding areas in Missouri. Services include collection from dumpsters and roll-offs, operation of brush/stump and compost areas, and recycling. The government estimates 17 roll-off pulls per month and provides historical workload data. Pricing is required for collection, disposal, and recycling incentive fees. With proposals, contractors must submit key personnel resumes and organization charts, spill plans, transition plans, and quality control plans. Proposals are due by mail or hand delivery to the specified contracting office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract Legal Street Industries Inc..pdf | ||
| Bid Abstracts W911S723B0004 Results 08102023.pdf | ||
| Extended Question Period KTR QandA - JB.docx | DOCX document | |
| W911S7-23-B-0004-0001.pdf | ||
| W911S723B0004 - Questions Answered.xlsx | XLSX spreadsheet | |
| Standardized PWS Overarching Base Ops PWS (OPORD Annex A)- FLW Solid Waste (Reviewed) rev 0.5.pdf | ||
| Attachment 1 - solid waste FLW - rev 0.5.docx | DOCX document | |
| GfpAttachmentTemplate update 20230627.xlsx | XLSX spreadsheet | |
| TE 2 - TE 7 - resolicit Solid Waste and Recoverable rev 0.4.xlsx | XLSX spreadsheet | |
| TE 1 - PRS.docx | DOCX document | |
| W911S723B0004 - Final Draft Solicitation Trash Refuse - Released.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| KTR Question | Government Responses | ||
| 2.1.2.4 Waste Soil - who is responsible for loading the waste soil into the containers for disposal? | Either soldiers or base maintenance contractors will load | ||
| 7.0 FLW E-waste Recycling: Will the Government please provide historical volume data reports showing the counts of each type of item received, for at least the last 3 events so Contractors can estimate costs? | 12 tons for the last 3 events | ||
| The following are Clarification follow up on Original Questions | Government Responses | Follow on Question | Government Responses |
| Statement: Bidding Instructions states only pricing sheet is required to be submitted? |
Question: Please confirm there is no technical nor past performance volume is required as part of the quote submission.
| Question: Per Section 6 of the PWS under Deliverables there are few documents noted to be submitted with the proposal. Please confirm the quote submittal requirements. | Answer1: Each Item/CLIN line must have a quoted amount. | Will the Government please provide a list of any items/documents that are required to be in the submital package, in addition to the completed SF 1449, Section B Pricing, acknowledgement of amendments and reps and Certs. | Anything included in delverables that state "with proposal" must be submitted |
| Statement: 3.3 Government Equipment Upkeep |
Question: Will the contractor be reimbursed or who pays for the upkeep of government equipment?
| Question: What has been the historical dollar value per year on total repairs/maintenance and upkeep? | Government furnished equipment in TE 7 will be maintained and serviced by Logistics Readiness Command (LRC) personnel. Maintenance frequency is as required by LRC regulations. | TE 7 refers only to Recycle Center Equipment. 3.3 of PWS Attachment 1 refers to all Government owned equipment. Will the Government please respond to the question regarding all equipment listed in 3.3? | All Government owned equipment that the contractor will be handling is located at the Recycle Center and Government owned dumpsters and roll-offs. Homeland Security owns the 10CY roll-offs at TA 235. |
| Since substantial equipment will need to be purchased does the government intend to renew all options? | |||
| This shall be determined based on contractor performance in order to renew options. | Please confirm that only poor performance will determine award of options. | Option years are issued as long as the Government has funding and performance is acceptable. | |
| From reviewing all the documents provided we gather the proposal will consist of the following: | |||
| a. | Quality Control Plan | ||
| b. | Subcontractor Management Plan | ||
| c. | Key Personnel with resume and organization chart | ||
| d. | Spill Plan | ||
| e. | Transition Plan – Phase-In and Phase-Out |
Please clarify if all information should be submitted in one document or broken into various volumes.
At time of bidding, please provide only quoted amounts for each CLIN and work specifically addressed in the provided PWS.
| Yes, include resumes | Will the Government please provide a list of any items/documents that are required to be in the submital package, in addition to the completed SF 1449, Section B Pricing, acknowledgement of amendments and reps and Certs. | Anything included in delverables that state "with proposal" must be submitted |
| The solicitation calls for a mail-in submission. It does not specify the number of copies required, formatting, font, number of pages, etc. Will this be clarified or is it up the to Offeror to determine these details? |
"Handcarried bids/proposals may be turned in at the Receptionist Desk, Building 11400, located at 8112 Nebraska Avenue, Fort Leonard Wood, MO, Monday thru Friday, between the hours of 7:30 a.m. and 4:00 p.m. MAILED: Bids/proposals mailed for submission shall be mailed to Mission Installation Contracting Command, Fort Leonard Wood, 8112 Nebraska Avenue, Building 11400, Fort Leonard Wood, Missouri 65473 when using regular postal service. For any express or overnight mailing service, the address to be used is Mission Installation Contracting Command, Fort Leonard Wood, Building 11400, 8112 Nebraska Avenue, Fort Leonard Wood, Missouri 65473."
| Only 1 copy of bid is needed. Formatting, font, and number of pages is at the descression of the offerer. Quoted amounts can be handwritten or typed. Please make sure company information and signature is present in bid. | Will the Government please provide a list of any items/documents that are required to be in the submital package, in addition to the completed SF 1449, Section B Pricing, acknowledgement of amendments and reps and Certs. | Anything included in delverables that state "with proposal" must be submitted |
| CLIN 0003 for the Refuse Disposal Svcs/2.8.4.1 states that “The Contractor shall bid the cost per ton, but shall be paid based on verified and documented tonnage disposed of.” If the Government is truly reimbursing the contractor for actual cost of disposal, would the Government consider removing this CLIN from the evaluation process to eliminate a contractor bidding a cost lower than the actual cost in order to receive a lower price evaluation? Ex: If the true cost is $40.00 per ton and a contractor bids $30.00 per ton for all option years. The way it is written the Government would pay on the $40.00 per ton, but the contractor bid $30.00 per ton to receive a lower price evaluation. |
-CLIN 0003/1003, et seq; If the cost of disposal per ton goes up during the term of the contract, will the Government allow the contractor to submit a price increase modification to cover the increased cost of disposal?
| changes in disposal fees can be submitted to KO as request for adjustment | In multiple responses to questions the Government has identified "rate established at the local transfer station" as the reimbursement amount per ton to the contractor. Will the Government please confirm that the local transfer station illuded to is the City of St. Robert Transfer Station and the current rate of $52.00 per ton is what the Government will use to determine all bidder's disposal price responses in CLIN 0003? | The current Transfer Station used is the City of St. Robert Transfer Station with the current rate of $52 per ton. Transfer Station did increase to the $52 per ton during the current contract and an adjustment was made at that time. |
| Attach 1; Sec 4.0/4.2.1 |
If the commodities that are collected and recycled cost the contractor money to process or ultimately dispose of does the Government or the Contractor pay for those costs?
| -If the contractor has to pay for those costs under what line item does the contractor bid that cost? | Disposal costs are paid by the governmet at the rate established by the local transfer station | In multiple responses to questions the Government has identified "rate established at the local transfer station" as the reimbursement amount per ton to the contractor. Will the Government please confirm that the local transfer station illuded to is the City of St. Robert Transfer Station and the current rate of $52.00 per ton is what the Government will use to determine all bidder's disposal price responses in CLIN 0003? | The current Transfer Station used is the City of St. Robert Transfer Station with the current rate of $52 per ton. Transfer Station did increase to the $52 per ton during the current contract and an adjustment was made at that time. |
| Attached 1/Sec 6.0 FLW Brush/Stump Area: |
Does the contractor need any specialized equipment for the operation of this area or does the Government handle the material that is brought on site on its own?
Would the Government please provide pictures of the area since there is not a site visit?
| Because the service is for the entire installation and LORA, there will not be a formal site visit. However, vendors can get a visitor pass for FLW and come get a look around on their own to get a better idea of the size and scope of the request. | In photos of the Brush/Stump Area found on the web, a bull dozer was present. Is the Contractor responsible to provide heavy equipment and heavy equipment Operators to manage the Area? | No. The bull dozer could have been from a unit doing a drop off. |
| Attached 1/Sec 5.0 FLW Compost/Clean Fill Area: |
Does the contractor need any specialized equipment for the operation of this area or does the Government handle the material that is brought on site on its own?
Would the Government please provide pictures of the area since there is not a site visit?
| Because the service is for the entire installation and LORA, there will not be a formal site visit. However, vendors can get a visitor pass for FLW and come get a look around on their own to get a better idea of the size and scope of the request. | In photos of the Compost/Clean Fill Areafound on the web, a bull dozer was present. Is the Contractor responsible to provide heavy equipment and heavy equipment Operators to manage the Area? | No. The bull dozer could have been from a unit doing a drop off. |
| TE 2 : |
| On average, how many roll off pulls per month are there? | Refer TE 5 - Workload data | Will the Government please confirm that the additional Roll Off pulls listed I TE 5 are in addition to the Roll Off pulls listed in TE 2? | Correct. TE-5 is in addition to TE-2. |
| 2. Section B. X001AE Recycle Incentive Fee. |
Will the Government please define how to calculate this response?
PWS Attch. 1., 4.2.1 states the Contractor will be paid 5% of proceeds for the sale of Recyclables. Checks received by the contractor for recycle proceeds are turned over to the COR. The contractor may make claim to 5% of all these proceeds from recycling. Will the Government please provide an estimated revenue amount of recyclable sales in order for the contractor to calculate the 5%? Previously, the Government would add a certain amount per month when budgetting each month but it would be up to the contractor to upkeep a list of the check numbers, amount, and seller with round about date of the checks that passed through the contractor's hands to the Government for claim as the Government's COR keeps track of the checks that are depositted.
These numbers are based on market rates.
17. Submittal: Will the Government please confirm that the list of items below is complete for the acceptance of a Proposal from the Contractor?
If not please respond with an accurate list.
| a. | Cover Page with Name, Address, Unique Entity Identifier and EFT if applicable. | |
| b. | Completed Section B – Supplies or Services and Prices | |
| c. | Key Personnel to include resume, contact information and organization chart. | |
| d. | Spill Plan | |
| e. | Transition – Phase In/Phase Out Plan | |
| f. | Quality Control Plan | |
| g. | Subcontract Plan. | "Handcarried bids/proposals may be turned in at the Receptionist Desk, Building 11400, located |
at 8112 Nebraska Avenue, Fort Leonard Wood, MO, Monday thru Friday, between the hours of 7:30 a.m. and 4:00 p.m. MAILED: Bids/proposals mailed for submission shall be mailed to Mission Installation Contracting Command, Fort Leonard Wood, 8112 Nebraska Avenue, Building 11400, Fort Leonard Wood, Missouri 65473 when using regular postal service. For any express or overnight mailing service, the address to be used is Mission Installation Contracting Command, Fort Leonard Wood, Building 11400, 8112 Nebraska Avenue, Fort Leonard Wood, Missouri 65473."
| Only 1 copy of bid is needed. Formatting, font, and number of pages is at the descression of the offerer. Quoted amounts can be handwritten or typed. Please make sure company information and signature is present in bid. | Will the Government please provide a list of any items/documents that are required to be in the submital package, in addition to the completed SF 1449, Section B Pricing, acknowledgement of amendments and reps and Certs. | Anything included in delverables that state "with proposal" must be submitted |
| For the Quality Control Plan (QCP): |
a. Could you provide an example or a template of a well-structured QCP, especially how each Contract Line Item (CLIN) service can be extracted individually?
b. What specific methods are expected for identifying and preventing defects in the quality of services performed?
c. Could you clarify the qualifications or criteria for someone to be considered a Quality Control Inspector?
d. Could you clarify the process and timeline for approval of the QCP and any subsequent changes to the plan?
C. Does the QC Manager need to be a separate person from the Project Manager? Can this be combined duties? Contractor is responsible for the development of a quality control plan, no template is provided.
Inspection and performance criteria are identified in TE 1 PRS (Performance Requirements Summary) 4.2 Quality Control Plan (QCP)." No lead person or first line supervisor shall be considered a Quality Control Inspector." Will the Government please confirm that the Quality Control Inspector can not be the same person as the Project Manager? That is correct. A project manager would be considered a first line supervisor