W911S7-19-B-0001-P00004.pdf
PDF 159 KB Posted
- Attached to
- Repair / Renovate Building 1702
- Solicitation number
- W911S7-19-B-0001
About this file
W911S7-19-B-0001-P00004
View the file
Other files
Show 40 more
Latest 50 of 74 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011275155-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to revise the follow ing documents:
1.The follow ing draw ings have revisions to DFAR 252.236-7001
Draw ing C8182.38 Sheet A1 of 7_Rev2, Draw ing C8182.38 Sheet A2 of 7_Rev2 Draw ing C8182.38 Sheet A5 of 7_Rev2, Draw ing C8182.38 Sheet A6 of 7_Rev2 Draw ing C8182.38 Sheet M2 of 13_Rev1, Draw ing C8182.38 Sheet M3 of 13_Rev1, Draw ing C8182.38 Sheet M6 of 13_Rev1 Draw ing C8182.38 Sheet M9 of 13_Rev1, Draw ing C8182.38 Sheet M10 of 13_Rev1 Draw ing C8182.38 Sheet M12 of 13_Rev1, Draw ing C8182.38 Sheet M13 of 13_Rev1
2.Attachment 1 Statement of Work, 1702 Revised 3.Attachment 13 Questions and Answ ers Bldg 1702 Renovation
4. The period of performance has been extended from 120 days to 160 days after contract aw ard.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S719B0001
X 9B. DATED (SEE ITEM 11)
28-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Apr-2019
CODE
MICC - FORT LEONARD WOOD
8112 NEBRASKA AVENUE
FORT LEONARD WOOD MO 65473
W911S7 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911S719B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule Item has been deleted from CLIN 0001:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 06-MAY-2019 TO
03-SEP-2019
N/A DIRECTORATE OF PUBLIC WORKS - FLW
- MO
MATTHEW MCCRAY
1334 1ST STREET BLDG 2200
FORT LEONARD WOOD MO 65473-5000
573.596.2198 FOB: Destination
W90NM2
The following Delivery Schedule item has been added to CLIN 0001:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
160 dys. ADC 1 DPW/L
LWDPW GABLE, ANGIE L.
1334 FIRST STREET
LEONARDWOOD MO 65473
573-596-0907 FOB: Destination
W90NM2
SECTION I - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title
Drawing C8182.38 Sheet A1 of 7_Rev2 Drawing C8182.38 Sheet A2 of 7_Rev2 Drawing C8182.38 Sheet A3 of 7_Rev1 Drawing C8182.38 Sheet A4 of 7_Rev1 Drawing C8182.38 Sheet A5 of 7_Rev2 Drawing C8182.38 Sheet A6 of 7_Rev2 Drawing C8182.38 Sheet A7 of 7 Drawing C8182.38 Sheet E1 of 5 Drawing C8182.38 Sheet E2 of 5 Drawing C8182.38 Sheet E3 of 5 Drawing C8182.38 Sheet E4 of 5 Drawing C8182.38 Sheet E5 of 5 Drawing C8182.38 Sheet F1 of 1 Drawing C8182.38 Sheet M1 of 13 Drawing C8182.38 Sheet M2 of 13_Rev1 Drawing C8182.38 Sheet M3 of 13_Rev1 Drawing C8182.38 Sheet M4 of 13 Drawing C8182.38 Sheet M5 of 13 Drawing C8182.38 Sheet M6 of 13_Rev1 Drawing C8182.38 Sheet M7 of 13 Drawing C8182.38 Sheet M8 of 13 Drawing C8182.38 Sheet M9 of 13_Rev1 Drawing C8182.38 Sheet M10 of 13_Rev1 Drawing C8182.38 Sheet M11 of 13 Drawing C8182.38 Sheet M12 of 13_Rev1 Drawing C8182.38 Sheet M13 of 13_Rev1 Drawing C8182.38 Sheet MI 1 of 12 Drawing C8182.38 Sheet MI 2 of 12 Drawing C8182.38 Sheet MI 3 of 12 Drawing C8182.38 Sheet MI 4 of 12 Drawing C8182.38 Sheet MI 5 of 12 Drawing C8182.38 Sheet MI 6 of 12 Drawing C8182.38 Sheet MI 7 of 12 Drawing C8182.38 Sheet MI 8 of 12
Drawing C8182.38 Sheet MI 9 of 12 Drawing C8182.38 Sheet MI 10 of 12 Drawing C8182.38 Sheet MI 11 of 12 Drawing C8182.38 Sheet MI 12 of 12
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Attachment 1 Statement of Work, B1702
417 14-FEB-2019
Attachment 10 Attachment 10, TAC vista 2 04-DEC-2018 Attachment 11 Attachment 11, Temp IP
Network Compliance Statement
1 04-DEC-2018
Attachment 12 Attachment 12 Wage Determination
6 29-MAR-2019
Attachment 2 Attachment 2, Certificate of Networthiness
Attachment 3 Attachment 3, FLW Meter Guidance
26 04-DEC-2018
Attachment 4 Attachment 4, FLW Approved Instrument
1 04-DEC-2108
Attachment 5 Attachment 5, JACE 2 04-DEC-2018 Attachment 6 Attachment 6, QC
Checklist LNS
2 04-DEC-2018
Attachment 7 Attachment 7, LonScanner
1 04-DEC-2018
Attachment 8 Attachment 8, QC Checklist Niagara Lonworks
Attachment 9 Attachment 9, Point Schedule Lonworks
3 04-DEC-2018
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Attachment 1 Statement of Work, 1702 Revised
472 29-APR-2019
Attachment 10 Attachment 10, TAC vista 2 04-DEC-2018 Attachment 11 Attachment 11, Temp IP
Network Compliance Statement
1 04-DEC-2018
Attachment 12 Attachment 12 Wage Determination
6 29-MAR-2019
Attachment 13 Questions and Answers Bldg 1702 Renovations
8 26-APR-2019
Attachment 2 Attachment 2, Certificate of Networthiness
Attachment 3 Attachment 3, FLW Meter Guidance
26 04-DEC-2018
Attachment 4 Attachment 4, FLW Approved Instrument
1 04-DEC-2108
Attachment 5 Attachment 5, JACE 2 04-DEC-2018 Attachment 6 Attachment 6, QC
Checklist LNS
2 04-DEC-2018
Attachment 7 Attachment 7, LonScanner
1 04-DEC-2018
Attachment 8 Attachment 8, QC Checklist Niagara Lonworks
Attachment 9 Attachment 9, Point Schedule Lonworks
3 04-DEC-2018
(End of Summary of Changes)