Amendment 0001

View the file

Other files

File Type Posted
Bid_Abstract,W911S7-19-B-0001,_7_May_2019.pdf PDF
Drawing_C8182.38_Sheet_A2_of_7_Rev2.pdf PDF
Drawing_C8182.38_Sheet_M12_of_13_Rev1.pdf PDF
Attachment_1_Statement_of_Work,_1702_Revised.pdf PDF
Drawing_C8182.38_Sheet_M2_of_13_Rev1.pdf PDF
Drawing_C8182.38_Sheet_A6_of_7_Rev2.pdf PDF
Drawing_C8182.38_Sheet_M10_of_13_Rev1.pdf PDF
Drawing_C8182.38_Sheet_M3_of_13_Rev1.pdf PDF
Drawing_C8182.38_Sheet_A1_of_7_Rev2.pdf PDF
Drawing_C8182.38_Sheet_M9_of_13_Rev1.pdf PDF
Attachment_13_Questions_and_Answers_Bldg_1702_Renovations.pdf PDF
W911S7-19-B-0001-P00004.pdf PDF
Drawing_C8182.38_Sheet_M6_of_13_Rev1.pdf PDF
Drawing_C8182.38_Sheet_M13_of_13_Rev1.pdf PDF
Drawing_C8182.38_Sheet_A5_of_7_Rev2.pdf PDF
W911S7-19-B-0001-P00003.pdf PDF
Drawing_C8182.38_sheet_A6_of_7_Rev1.pdf PDF
Drawing_C8182.38_sheet_A2_of_7_Rev1.pdf PDF
W911S7-19-B-0001_Amendment_0002.pdf PDF
Drawing_C8182.38_sheet_A4_of_7_Rev1.pdf PDF
Drawing_C8182.38_sheet_A3_of_7_Rev1.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Attachment_12_Wage_Determination.pdf PDF
Wage_Determination_3-29-19.pdf PDF
Drawing_C8182.38_Sheet_MI_5_of_12.pdf PDF
Drawing_C8182.38_Sheet_F1_of_1.pdf PDF
Drawing_C8182.38_Sheet_MI_7_of_12.pdf PDF
Drawing_C8182.38_Sheet_M7_of_13.pdf PDF
Drawing_C8182.38_Sheet_M4_of_13.pdf PDF
Drawing_C8182.38_Sheet_A7_of_7.pdf PDF
Drawing_C8182.38_Sheet_M3_of_13.pdf PDF
Attachment_3,_FLW_Meter_Guidance.pdf PDF
Drawing_C8182.38_Sheet_MI_2_of_12.pdf PDF
Attachment_1_Statement_of_Work,_B1702.pdf PDF
Drawing_C8182.38_Sheet_E2_of_5.pdf PDF
Drawing_C8182.38_Sheet_MI_1_of_12.pdf PDF
Drawing_C8182.38_Sheet_A4_of_7.pdf PDF
Drawing_C8182.38_Sheet_A3_of_7.pdf PDF
Attachment_11,_Temp_IP_Network_Compliance_Statement.pdf PDF
Drawing_C8182.38_Sheet_MI_8_of_12.pdf PDF
Drawing_C8182.38_Sheet_M13_of_13.pdf PDF
Drawing_C8182.38_Sheet_M8_of_13.pdf PDF
Drawing_C8182.38_Sheet_M12_of_13.pdf PDF
Drawing_C8182.38_Sheet_A2_of_7.pdf PDF
Attachment_5,_JACE_(CoN).pdf PDF
Attachment_9,_Point_Schedule_Lonworks_BACnet_Niagara_2015-07-15.pdf PDF
Drawing_C8182.38_Sheet_MI_12_of_12.pdf PDF
Drawing_C8182.38_Sheet_MI_4_of_12.pdf PDF
Drawing_C8182.38_Sheet_A5_of_7.pdf PDF
Attachment_2,_Certificate_of_Networthiness_(CoN).pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011275155-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add Attachment 12, Wage Determination to section J. No further changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Mar-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S719B0001

X 9B. DATED (SEE ITEM 11)

28-Feb-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Mar-2019

CODE

MICC - FORT LEONARD WOOD

8112 NEBRASKA AVENUE

FORT LEONARD WOOD MO 65473

W911S7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911S719B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 1 Statement of Work, B1702

417 14-FEB-2019

Attachment 10 Attachment 10, TAC vista 2 04-DEC-2018 Attachment 11 Attachment 11, Temp IP

Network Compliance Statement

1 04-DEC-2018

Attachment 2 Attachment 2, Certificate of Networthiness

Attachment 3 Attachment 3, FLW Meter Guidance

26 04-DEC-2018

Attachment 4 Attachment 4, FLW Approved Instrument

1 04-DEC-2108

Attachment 5 Attachment 5, JACE 2 04-DEC-2018 Attachment 6 Attachment 6, QC

Checklist LNS

2 04-DEC-2018

Attachment 7 Attachment 7, LonScanner

1 04-DEC-2018

Attachment 8 Attachment 8, QC Checklist Niagara Lonworks

Attachment 9 Attachment 9, Point Schedule Lonworks

3 04-DEC-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 1 Statement of Work, B1702

417 14-FEB-2019

Attachment 10 Attachment 10, TAC vista 2 04-DEC-2018 Attachment 11 Attachment 11, Temp IP

Network Compliance Statement

1 04-DEC-2018

Attachment 12 Attachment 12 Wage Determination

6 29-MAR-2019

Attachment 2 Attachment 2, Certificate of Networthiness

Attachment 3 Attachment 3, FLW Meter Guidance

26 04-DEC-2018

W911S719B0001

Attachment 4 Attachment 4, FLW Approved Instrument

1 04-DEC-2108

Attachment 5 Attachment 5, JACE 2 04-DEC-2018 Attachment 6 Attachment 6, QC

Checklist LNS

2 04-DEC-2018

Attachment 7 Attachment 7, LonScanner

1 04-DEC-2018

Attachment 8 Attachment 8, QC Checklist Niagara Lonworks

Attachment 9 Attachment 9, Point Schedule Lonworks

3 04-DEC-2018

(End of Summary of Changes)