Drawing_C8182.38_Sheet_A1_of_7_Rev2.pdf
PDF 313 KB Posted
- Attached to
- Repair / Renovate Building 1702
- Solicitation number
- W911S7-19-B-0001
About this file
Drawing C8182.38 Sheet A1 of 7_Rev2
View the file
Other files
Show 40 more
Latest 50 of 74 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESTROOMS
4 0 4 8 16 FT8
SCALE: 18" = 1'0"
N O
R T
HDEMOLITION NOTES
REFER TO MECHANICAL AND ELECTRICAL SHEETS FOR ADDITIONAL
AND FINISHES
OR CONSTRUCTION - PATCH SHALL MATCH EXISTING CONSTRUCTION
PATCH WALLS, FLOOR, AND CEILING WHERE DAMAGED BY DEMOLITION
REFER TO CONSTRUCTION DRAWINGS FOR EXTENT OF DEMOLITION
REMOVE ALUMINUM STOREFRONTS COMPLETE IN EACH BAY
REMOVE ALL ALUMINUM WINDOWS COMPLETE IN EACH BAY
REMOVE SHELVES IN FOUR STORAGE CLOSETS COMPLETE
DEMOLITION NOTES
ABBREVIATIONS
NIC NOT IN CONTRACT
R.C.P. REFLECTED CEILING PLAN
GA. GAUGE OF METAL
MAX. MAXIMUM
MIN. MINIMUM
O.C. ON CENTER
DIA. DIAMETER
GYP. BD. GYPSUM BOARD
AFF ABOVE FINISH FLOOR
DEMOLITION PLAN
B U
IL
D
IN
G
R E
P A
IR
I
N T
E R
IO
R F
IN
IS
H E
S C
O O
R D
IN
A T
IO
N
D A
T E
D A
T E
D A
T E
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
S U
B M
IT
T E
D
M M
U E
L L E
R
T T
A Y
L O
R
M M
U E
L L E
R
M M
U E
L L E
R
A P
P R
O V
E D
D A
T E
J D B
A L E
S C /E
D B
R E
V
IS
IO
N S
D E
S C
R
IP
T
IO
N D
A T
E D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
F O
R T L
E O
N A
R D W
O O
D
M
IS
S O
U R I
M A
D E
A P
P R 'D
SCALE
AS SHOWN
DATE
27 FEB 18
PROJECT NO:
DRAWING NO:
A1SHEET OF 7
A N
D D
E T
A
IL
S D
E M
O L
IT
IO
N P
L A
N
N O
T E
S
FOR ACTUAL NORTH
REFER TO SITE PLAN
PLAN NORTH
REMOVE SUSPENDED GYPSUM BOARD CEILINGS IN VESTIBULE, JANITOR, AND RESTROOMS COMPLETE IN ALL BAYS
SPRINKLER
ENTRANCE
WALLS TO REMAIN AT SPRINKLER ENTRANCE
REMOVE GYPSUM BOARD ON WOOD STUD PARTITIONS IN THE BACK STORAGE AREAS AS SHOWN
REMOVE CARPET IN THE VAULT OF BAY 'A' COMPLETE TO THE CONCRETE
AND THE LATH AND PLASTER WALLS COMPLETE IN ALL THE RESTROOMS IN EACH BAY
REMOVE CERAMIC TILE IN EACH RESTROOM FROM THE FLOOR AND THE WALLS COMPLETE
M / W MEN'S / WOMEN'S RESTROOM
WALLS AT SPRINKLER ENTRANCE TO REMAIN
EXPANDED METAL GAGES TO REMAIN UNLESS NOTED OTHERWISE
REMOVE GYPSUM BOARD ON WOOD STUD PARTITIONS COMPLETE
STEEL CAGE AND GATE
REMOVE EXPANDED
STEEL CAGE
REMOVE EXPANDED
STEEL CAGE COMPLETE
REMOVE EXPANDED
STEEL CAGE AND GATES
REMOVE EXPANDED
REMOVE SUSPENDED CEILING SYSTEMS COMPLETE THROUGHOUT ALL BAYS
TURN OVER TO GOVERNMENT
SCREEN COMPLETE
REMOVE PULLDOWN
BAYS
THIS ROOM COMPLETE
REMOVE GYPSUM BOARD
PROVIDE DOUBLE GATE
STEEL GATE AND PASS THROUGH
REMOVE EXPANDED
REMOVE COUNTERS, MAKESHIFT CABINETS AND OTHER ITEMS LEFT BEHIND BY PREVIOUS OCCUPANT COMPLETE IN EACH BAY
REMOVE MOP SINK COMPLETE
AND ALL GYPSUM BOARD IN JANITOR ROOMS
REMOVE THE FIRST 4'0" AFF OF GYPSUM BOARD FROM EXTERIOR WALLS IN BAYS 'A' AND 'E'
DPW 03596-6J
M.0075377
REMOVE EXISTING FIRE EXTINGUISHER CABINETS AND HANGING DEVICES AND REPAIR WALL
C8182.38
PASS THRU TO REMAIN
VAULT DOOR AND
REPAIR TO MATCH ADJACENT
ON THE WALLS AND FLOOR
REMOVE HOOKS
WHERE RESTROOM DOORS ARE REMOVED FROM BAYS INFILL TO MATCH ADJACENT
REMOVE ALL THE DOORS AND FRAMES COMPLETE IN EACH BAY
STEEL CAGE COMPLETE
REMOVE EXPANDED
STEEL GATE AND PASS THROUGH
REMOVE EXPANDED
COMPLETE
STEEL CAGE AND GATES
REMOVE EXPANDED
REMOVE PLYWOOD ON EXPANDED STEEL CAGES IN THE BAY AREA REPAIR CONCRETE
STEEL CAGE AND GATES
REMOVE EXPANDED
WOOD DPW ENVIRONMENTAL BRANCH THROUGH THE CONTRACTING OFFICER AND PROVIDE THE RESULTS.
PROVIDE ASBESTOS REPORT AND LEAD BASE PAINT TESTING AND MUST BE COORDINATED WITH THE FORT LEONARD
/2
/2
R E
V
IS
IO
N D
U E T
O Q
U E
S T
IO
N S A
N D A
N S
W E
R S
A
L J
D B
| 2019-04-26T07:35:30-0500 | |
| BALES.JIMMIE.D.JR.1231309302 |
File details come from the government source that posted it.