Amendment 0003.pdf
PDF 2 MB Posted
- Attached to
- Lifelong Learning Center (LLC) Technical Suppport Services Federal contract opportunity
- Solicitation number
- W911S0-20-R-0006
About this file
This is a performance work statement for contractor technical support services for Lifelong Learning Centers. The contractor shall provide personnel, supervision, and equipment to maintain web portal, support desk, digital library, student management database, and learning content management system capabilities for four Lifelong Learning Centers and three additional locations. The contractor must submit monthly progress reports and maintain system documentation, including architecture documents, continuity of operations plans, and accreditation materials. The base period of performance is one year with four optional one-year extensions. The solicitation was issued by the Department of the Army Mission and Installation Contracting Command at Fort Eustis. The period of performance for proposals is 180 days and the closing date for proposals is April 30, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Government Responses to Industry Questions Summary Amendment 0006.xlsx | XLSX spreadsheet | |
| Amendment 0006.pdf | ||
| Government Responses to Industry Questions Summary Amendment 0005.xlsx | XLSX spreadsheet | |
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Government Responses to Industry Questions Summary Amendment 0003.xlsx | XLSX spreadsheet | |
| Amendment 0002.pdf | ||
| Government Responses to Industry Questions Summary.xlsx | XLSX spreadsheet | |
| Amendment 0001.pdf | ||
| Solicitation W911S0-20-R-0006.pdf | ||
| Attachment 11 -DD 254.pdf | ||
| Attachment 13 - Question Format.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911S020R0006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to provide additional responses to Industry questions received and notify offerors of the Governments use of the Acquisition Source Selection Interactive Support Tool (ASSIST) and ASSIST2Industry softw are in the evaluation of proposals (Ref. 52.212-1 Addendum, Paragraph C(16)). A subsequent modif ication w ill include all remaining Government question responses.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 89
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911S020R0006
X 9B. DATED (SEE ITEM 11)
30-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Apr-2020
CODE
MICC - FORT EUSTIS
705 WASHINGTON BLVD
FORT EUSTIS VA 23604
W911S0 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ADDENDUM TO 52.212-1
A. INTRODUCTION
Contract Type: The Government contemplates awarding a Firm Fixed Price (FFP) contract which will include Cost Reimbursable Contract Line Item Numbers (CLINs) for Travel and Other Direct Costs (ODC) utilizing the best value trade‐ off approach.
B. PROPOSAL SUBMITTAL AND INQUIRIES
1. Closing Date/Time: 30 April 20 12:00PM, EST. It is the Offeror’s responsibility to assure its proposal is received by the date and time specified. In accordance with (IAW) FAR 52.212-1, if your proposal is not received at the initial point of entry to the Government (e‐mail by the exact date and time specified above), it will be determined late and will not be evaluated. Proposal, as the term is used here, means ALL volumes and/or parts of the RFP. Any proposal that fails to comply with all the requirements of the RFP may be rejected from further consideration.
2. Questions regarding this RFP shall be in writing and directed via e‐mail to both the Contracting Officer, Roger McAughan, and Contract Specialist, Melinda Paynter. All correspondence shall reference RFP Number W911S0‐20‐R‐0006. The cut‐off for questions is 16 April 20, 12:00PM, EST. All questions will be answered electronically, allowing all Offerors access to each question and corresponding answer. Contractors will see both the question and the answer. However, the identity of the person/company asking the question will not be disclosed. Emails shall be clearly marked RFP W911S0‐20‐R‐0006 in the subject line to:
Roger McAughan, Contracting Officer, roger.j.mcaughan.civ@mail.mil (757) 501‐8331; Melinda Paynter, Contract Specialist, melinda.c.paynter.civ@mail.mil, (757) 501‐7093.
3. All questions received in a timely manner (within seven (7) working days following the issue date of the solicitation, shall be answered by Amendment. Questions received after that time may not be answered in sufficient time for Offerors to adjust their proposals and meet the closing date/time of the solicitation. All questions shall annotate source document, page, and paragraph number.
4. Resolution of Issues. The Contracting Officer reserves the right to withdraw and cancel the proposed RFP. In such event, the Offeror will be notified in writing of the Contracting Officer’s decision. This decision is final and conclusive and shall not be subject to the “Disputes” clause or the “Contract Disputes Act.”
5. All questions shall be included on Attachment 13 of this Addendum, see “Attachment 13 - Question Format”.
C. GENERAL INSTRUCTIONS
1. The Offer: The submission of the documentations specified below will constitute the Offeror's acceptance of the terms and conditions of the RFP, concurrence with the Performance Work Statement (PWS), provisions, and contract type.
2. The proposal shall be in full compliance with the instructions in this RFP. The proposal (to include price) shall be valid for 180 calendar days.
3. The Government will conduct evaluations using the best value Trade-Off Approach and will follow FAR 15.3, Source Selection evaluation criteria set forth in ADDENDUM TO 52.212-2 (Evaluation- Commercial Items) considering solely the Offeror’s response to this RFP.
4. The award will be based upon an integrated assessment of all price and non-price factors. Trade-offs between cost and non-cost factors are permitted. A proposal that demonstrates a Superior Technical Approach (Factor I) in the Work Processes and Work Scheduling Elements may be worth more to the Government than a proposal that only meets minimum requirements in Work Processes and Work Scheduling Elements. Evaluation and discussion procedures at FAR 15.3, Source Selection, does apply to this acquisition.
5. The Offeror shall submit an unclassified proposal that demonstrates its ability to perform and meet the requirements in the PWS. Proposals shall conform to all the requirements of this RFP. Failure to conform may result in your proposal being rejected and no longer considered for award.
6. Offerors are notified that the Government will not reimburse costs incurred for proposal preparation, to include pre-award site visits.
7. Although the Government does not intend to hold discussions/communications, the Government does reserve the right to negotiate with one or more but not necessarily all Offerors, for any reason. Any proposal revisions may be limited to the items negotiated.
8. For labor categories that are non-exempt under this RFP, calculate price using the wage determination for the specific location the individual will be assigned. Go to beta.SAM.gov to locate the applicable wage determination. All proposals submitted in response to this RFP shall reflect the use of current, updated fringe benefit rates. The contractor’s wage rate shall comply with the DOL wage rate minimum requirements for the area in which the work is to be done. The contractors shall specify the city, state, and country in which the work will take place. This is necessary so that the appropriate DOL rates can be provided. Where multiple places of performance apply, provide a separate wage determination for each place of performance that is required under this RFP.
9. If the value of this contract is expected to exceed $10,000,000.00 your firm shall be in compliance with the Equal Employment Opportunity (EEO) regulations before award of the resultant TO. Ensure your firm is on the Department of Labor (DOL) EEO National Pre-Award Registry or that you can provide verification of EEO compliance if requested by the Government. See https://ofccp.dol-esa.gov/preaward/pa_reg.html for more information. This registry is updated every two years and it does not provide information on the Parent Organization or other facility locations that have not been reviewed.
10. Offerors are cautioned that e‐mail is not instantaneous. We recommend you submit your proposal prior to the closing date, allowing enough time to ensure the entire proposal is received on time to be considered for award. If any e‐mailed portion of the Offeror’s proposal is not received by the RFP closing deadline, the proposal shall be rejected as late (see FAR 52.212-1). Re‐send your e‐mail submission if you do not receive a receipt confirmation. If you do not receive a receipt confirmation after the second transmission, contact the Contract Specialist. Due to Government exchange size limitations, we cannot receive individual e‐mails that exceed 10 MB, including the e‐mail itself plus all attachments. If your electronic proposal, including all attachments, is larger than 10 MB, you shall segment your proposal into a series of two (2) or more separate e‐mails that individually are no larger than 10 MB. We cannot receive e‐mails if they contain compressed attachments. Our security software blocks these types of e‐ mails.
11. Offerors shall identify in the e‐mail subject line the following: W911S0‐20‐R‐0006, closing date/time, content, and the Offeror’s name. For example: “fill in RFP number, day/time/content, name, Message 1 of 5, XYZ Company”.
12. In the body of each e‐mail message of the proposal, the Offeror shall provide a brief statement accounting for each e‐mail in relation to the entire proposal. For example, “Message 3 or 5, as well as inventory of attachments” or “Attachment 1 of 4” or “This message 3 of a total of 5 messages constituting the Request for Proposal of XYZ Company” or “This message provides attachments 2 and 3 of a total of 6 attachments to our complete Request for Proposal.”
13. Pages are limited to 8 ½” x 11”. Number all pages. Use at least 1 inch margins on the top and bottom and ¾ inch side margins. The font types can include Arial, Times New Roman, and Courier New. Graphs and tables included in the technical proposal need not be double-spaced, but to ensure legibility, the text in graphics may be 9-point; however, all text not in graphics shall be no smaller than 12- point type. Text in graphics, headers, footers, and tables may be 9-point. Inclusion of any graphs or tables is counted within the page limitation.
Any pages submitted in excess of the page limit stated in Table 1 will not be evaluated and will be returned to the Contractor. Volume Cover, Table of Contents, Glossary, and Compliance Matrix pages included in an offerors proposal are exclusive of the page count. Contractors are cautioned that failure to follow these instructions may result in an incomplete evaluation of the proposal. Offerors shall submit separate electronic documents, by volume, with its proposal.
14. Offerors are not authorized to include citations for, or linkages to, websites in the RFP.
15. Ensure that all volumes are submitted in response to this RFP. Failure to do so may result in your proposal not being considered. Your proposal shall be structured in a manner that clearly addresses the requirements for this RFP. Responses that are overly verbose or include marketing material are not desired.
16. During the conduct of this acquisition, the Acquisition Source Selection Interactive Support Tool (ASSIST) will be used by the Government to support the proposal evaluation and source selection process. A separate tool, the ASSIST2Industry, will be used in conjunction with ASSIST to accomplish all exchanges with Offerors after receipt of proposals pursuant to Federal Acquisition Regulation (FAR) 15.306.
ASSIST2Industry provides the ability for the Government to issue, and the Offerors to receive and respond to, all Evaluation Notices (ENs) in a secure online environment.
In order to initiate the use of ASSIST2Industry, the Government requires the names, company titles, telephone numbers, and email addresses of two (2) individuals that the Offeror has designated as responsible for receiving and responding to Government ENs through ASSIST2Industry. The designation of two (2) individuals is for the purpose of insuring availability of one individual if the other individual is not available.
The required information regarding these two (2) individuals must be submitted with the Offeror’s proposal and included in the cover letter.
After the solicitation’s closing date, the Government will establish an account in ASSIST2Industry for each individual identified by the Offeror that has submitted a proposal in response to this solicitation. The two individuals named by the Offeror will be authorized access to that account. Two (2) separate system generated emails will be sent to each individual. One of the emails will contain the individual’s ASSIST2Industry username. The other email will contain the individual’s temporary password. Using the provided username and temporary password, each individual can then go to https://ASSIST2Industry.army.mil to access the account. NOTE: The first time a user logs in, the user will be required to change the temporary password before the user can proceed to use the site.
Whenever the Government issues ENs to the Offeror through ASSIST2Industry, the Government’s Contracting Officer will notify the Offeror through a medium independent of ASSIST2Industry ( e.g., e-mail) that the Offeror has ENs in ASSIST2Industry waiting for a response. There will be no ENs in ASSIST2Industry until such notice is issued by the Contracting Officer.
All Offerors are advised that ASSIST2Industry has been updated and it is now the responsibility of PRIME
Contractors to establish accounts for their SUBCONTRACTORS to respond to Government ENs. A separate area within ASSIST2Industry has been created to allow authorized Subcontractor POCs to upload proposal files only. Subcontractors will not be able to access any other information on the ASSIST2Industry website (e.g. Questions/Evaluation Notices, Responses, etc.). Once a Subcontractor has been added, they will receive a user ID (e.g. subcontractor0001) and password (an initial password) that will be sent via two separate system generated e-mails. A Subcontractor will have one user ID for all PRIMES and solicitation responses, i.e. if you are a Subcontractor to multiple Prime Contractors and multiple solicitation responses, you will only have one user ID. Once an account has been established for the Subcontractor, go to https://ASSIST2Industry.army.mil to access the account. Prime Contractors will only be able to see the number of files submitted by their Subcontractors; but, will be UNABLE TO VIEW the Subcontractor’s files.
ACCESSING ASSIST2INDUSTRY PRIME/SUBCONTRACTORS
Access to ASSIST2Industry will require a two factor authentication for each Prime and Subcontractor user.
All ASSIST2Industry users are required to have a username/password (first authentication) and may select one of the following three methods for implementing the second authentication to access the site:
use an authenticator application on your cell phone (e.g. Google or Microsoft Authenticator) to receive a QR Code;
receive a code via an SMS Text Message to your cell phone; or receive a code via e-mail.
If you have any other problems accessing your account, contact the Army Enterprise Service Desk (AESD) at the number listed below:
Phone: 1-866-335-2769 (ARMY), # Option 7
Please be prepared to provide the following:
Contractor POC Name;
Telephone Number;
Email Address;
Procuring Contracting Officer and/or Contract Specialist Name and Telephone Number;
ASSIST Source Selection/Program Name; and Solicitation Number.
Contractor POCs should not provide any additional information than what is noted above.
NOTE: Both Prime Contractors and Subcontractors are instructed to review the ASSIST2Industry User’s Guide, located under the “Getting Started” tab on the website. The guide has been updated and provides step by step instructions on how to perform functions and navigate the website.
Contractor POCs should not provide any additional information than what is noted above.
THE OFFERORS ARE CAUTIONED THAT THE SYSTEM GENERATED EMAILS REFERRED TO
ABOVE ARE INTENDED FOR ADMINISTRATIVE PURPOSES ONLY. RECEIPT OF THESE EMAILS
DOES NOT CONSTITUTE THE COMMENCEMENT OF ANY TYPE OF EXCHANGE WITH THE
OFFEROR IN ACCORDANCE WITH FAR 15.306(A), (B), OR (D) (I.E., CLARIFICATIONS,
COMMUNICATIONS, OR DISCUSSIONS). ALSO, RECEIPT OF THESE EMAILS DOES NOT
SIGNIFY THAT A COMPETITIVE RANGE DETERMINATION IN ACCORDANCE WITH FAR
15.306(C) HAS BEEN MADE OR THAT THE OFFEROR’S PROPOSAL WILL BE INCLUDED IN THE
COMPETITIVE RANGE WHEN THAT DETERMINATION IS MADE. ALL NOTIFICATIONS THAT
ANY TYPE OF EXCHANGE WITH THE OFFEROR HAS COMMENCED AND THE OFFEROR HAS
EVALUATION NOTICES (ENS) AVAILABLE TO RESPOND TO, OR ANY NOTIFICATION THAT
THE OFFEROR’S PROPOSAL HAS BEEN INCLUDED IN OR EXCLUDED FROM THE
COMPETITIVE RANGE, WILL BE SENT TO THE OFFEROR BY THE CONTRACTING OFFICER
INDEPENDENTLY OF THE ASSIST2INDUSTRY.
D. INSTRUCTIONS AND PROPOSAL CONTENT
1. *IMPORTANT ‐ Offerors simply providing general statements or paraphrasing/parroting the PWS in whole or in any part shall result in a rating of unacceptable. The proposal shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the offeror’s proposal. Legibility, clarity and coherence are very important. Your responses will be evaluated against the factors defined in the ADDENDUM TO 52.212‐2 – (Evaluation, Commercial Items).
2. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the PWS (including referenced publications, technical data, etc.); statements paraphrasing the PWS or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the Offeror's proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
3. The length of your response to this RFP is limited, as identified below. Take extreme care and attention to ensure that all required documents are included in the RFP. Information submitted beyond the page limitations, identified below, will not be evaluated and may be considered cause for rejection of your proposal. Offerors are required to submit their proposals in four (4) separate Volumes as follows:
Section Page Limitation Volume I: General Information Tab A‐NTE* 5 pages Volume II: Technical Capability Tab B & C‐NTE* 75 pages Volume III: Past performance Tab D‐NTE* 5 pages Volume IV: Price Tab E–Unlimited
*NTE‐ Not to Exceed
4. The Offeror’s proposal volumes shall be organized and contain the information specified below in Table 1.
Table 1: Request for Proposal Content Volume Tab Section Page
Limit Title File
Submission
I. General Information A NTE 5 Word or
A1 Offeror’s General Information
A2 Executive Summary:
Organization Conflicts of Interest (OCI), OCI Risk and OCI Risk Mitigation and Teaming Arrangements (Including Sub- Contractors)
A3 Exceptions/Assumptions
II. Technical Capability
B&C
NTE 75
Technical Capability
Word or
Technical Approach (Factor I)
40 Technical Approach (Factor I)
Element I B1 Work Processes
Element II B2 Work Scheduling
Element III B3 Quality Control Approach
Management Approach (Factor II)
35 Management Approach (Factor II)
Element I C1 5 Phase-In Approach
Element II C2 10 (Excluding
Resumes and Key Personnel
Letters of Commitment)
Staffing, Resource Management and Key Personnel
Element III C3 10 Management Controls
Element IV C4 10 Organizational Interfaces and Communications
III. Past Performance D
6 Past Performance (Factor III)
Word or
IV. Price Factor E Unlimited Price (Factor IV)
Excel
E1 Pricing Notes Excel
E2 Proposal Pricing Breakdown
E3 Proposed Labor Categories and Hours
E4 SCLS Proposed Labor
E5 Total Compensation Plan
5.1 Volume I: General Information: The General Information Volume shall contain the identified information detailed below and shall not exceed five (5) pages.
TAB A1 - Standard Form 1449 (SF 1449) & Offeror’s General Information: The SF 1449 shall be submitted fully completed. The Offeror is cautioned that the SF 1449 must contain an original signature in block 30a of the form. Offeror’s General Information: The Offeror shall also provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to Offeror’s proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government. Offerors acknowledgement of the Government's solicitation amendments (SF 30's) are not included in the Volume I five page count.
TAB A2 – Executive Summary: OCI, OCI Risk and OCI Risk Mitigation and Teaming Arrangements (Including Sub-Contractors)
TAB A3 - Exceptions/Assumptions (if required): The Offeror shall identify and provide an explanation of any exceptions or deviations. If the Offeror finds it necessary to take exception to any of the requirements specified in the solicitation, the Offeror shall clearly identify the applicable Volume and exceptions with a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation.
Each exception shall be specifically related to each paragraph and/specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the Offer ineligible for award. This information shall be provided in the format outlined below in Table 2. Additionally, any assumptions used in the proposal preparation must be identified.
Table 2 – Solicitations Exceptions
Solicitation Document
Page/ Paragraph
Requirement/ Portion
Rationale & Impact
Section B, PWS, Applicable Identify the Describe etc. Page and requirement The rationale
Paragraph or portion to which and impact of
Numbers. exception is taken. the exception.
5.2 VOLUME II: Technical Capability: The Technical Capability Volume is inclusive of the Technical Approach (Factor I) and Management Approach (Factor II) and shall not exceed 75 pages.
5.2.1 Technical Approach (Factor I): The Technical Approach Factor I is inclusive of the Work Processes, Work Scheduling and Quality Control Elements. The Offerors shall demonstrate their understanding of the Technical Approach by clearly discussing the Technical Elements identified below with respect to specific requirements indicated in Part 5, Sections 5.1 through 5.6.5 of the PWS. The Offeror is highly encouraged to use the information provided in PWS Attachment 1--Contractor Responsibilities, PWS Attachment 2--Site Specific Duties, and PWS Attachment 3--Task Breakdown by Sites in the PWS to develop their Technical Approach. The Technical Approach shall include the following and shall not exceed 40 Pages:
TAB B1 - Work Processes (Element I): The Offeror’s Work Processes shall demonstrate a full understanding of LLC’s capabilities and mission. The Offeror’s Work Processes shall ensure efficient, quality and timely performance of the tasks in the PWS. The Work Processes element shall address how the Offeror will meet the following requirements as described in Part 5-- Specific Tasks of the PWS and how it will fulfill the requirements listed below:
a. Identifying and describing the major work processes that will be used to meet the requirements in the PWS.
b. Identifying and describing the interfaces between the work processes.
c. Defining the inputs and outputs of these processes.
TAB B2 - Work Scheduling (Element II): The Offeror’s proposal shall describe how work will be scheduled, to include employment of any automated systems or work loading procedures. The Offeror’s proposed Work Scheduling element shall describe the following requirements below:
a. Managing and scheduling work for the entire LLC effort at ALL the sites identified in the PWS.
b. Identifying the resources and activities needed for assigned tasks.
c. Provide coverage for work surges and after duty hours.
TAB B3 - Quality Control (Element III): The Offeror’s Quality Control Approach shall describe how it will ensure quality performance and compliance of all key control elements, deliverables and metrics IAW the PWS Paragraph 1.5.3 and the PWS Performance Requirements Summary (PRS). The Offeror’s Quality Control Approach shall address the following requirements below:
a. Quality Control Management processes.
b. Quality Control roles and responsibilities.
c. Methods of surveillance/monitoring.
d. Methods for identifying and correcting deficiencies.
e. Methods for customer feedback.
f. Measures of performance.
g. Reporting requirements and their frequencies.
5.2.2 Management Approach (Factor II): The Management Approach Factor II is inclusive of the Phase- In, Staffing, Resource Management, and Key Personnel, Management Controls, and Organizational Interface and Communication, elements. Each element will be assigned a rating to allow the Government to conduct “trade-offs” amongst the various management elements. The Offerors shall demonstrate their understanding of the various management elements identified below with respect to requirements indicated in the PWS. The Management Approach shall include the following and shall not exceed 35 pages (Excluding Resumes and Key Personnel Letters of Commitment):
TAB C1- Phase-In Plan (Element I): The Offeror will assume full responsibility for all areas of operation in accordance with the contract terms and conditions in order to ensure a smooth transition of the contracted operations. The proposed phase-in approach shall discuss the organization structure, staffing, tasks, and approach used to adequately complete transition of services from the current Contractor to the new Contractor, within the required time. The Offeror’s phase-in plan shall demonstrate how to ensure smooth transition of the contractual requirement.
The Phase-In Plan shall not exceed five (5) pages.
TAB C2 – Staffing, Resource Management, and Key Personnel (Element II): This element shall clearly describe the following and shall not exceed 10 pages.
a. Staffing: The Offeror shall include sufficient details to clearly describe its method(s) of providing a sufficiently skilled and adequate workforce capable of meeting the LLC PWS requirements. The Offerors’ staffing methods shall demonstrate the following:
i. Proposed staffing with estimated personnel numbers and labor categories for each site identified in the PWS.
ii. Methods for cross-utilization of personnel at and between sites.
iii. Training strategies to ensure personnel have the necessary skill levels for contract execution.
b. Resource Management and Key Personnel: The Offeror shall clearly detail the experience, qualifications, and abilities of their proposed key personnel, management and administrative teams. Resumes are required for all proposed key which demonstrate the proposed Key Personnel are capable of meeting the PWS requirements. The Offerors’ resource management and key personnel methods shall demonstrate the following:
i. How its program manager and other key personnel will be utilized to meet the requirements of the PWS.
ii. Staffing processes and tools to be used such as headhunter and recruiting sites.
iii. Key personnel possess required certifications, security clearances, education and work experience established by the PWS to perform the work requirements.
TAB C3 - Management Controls: (Element III): The Offeror’s proposal shall describe its management procedures and the manner in which personnel will be monitored to ensure they are capable of meeting the requirements detailed in the PWS. The Offeror’s Management Controls shall address the following areas and shall not exceed 10 pages.
a. Performance monitoring procedures.
b. Performance indicators to ensure timely and quality work.
c. Management Risk Mitigation and problem escalation processes.
TAB C4 - Organizational Interfaces and Communications (Element IV): The Offeror’s Organizational Interfaces and Communications element shall clearly describe the methods, strategies, and tools used to facilitate information exchange. This approach shall demonstrate interfaces and communications between its different work groups (i.e. departments, teams, offices, etc.) subcontractors and/or team members, and Government representatives. The Offeror’s Organizational Interfaces and Communication tab shall not exceed 10 Pages.
5.3 VOLUME III: Past Performance (Factor III): The Past Performance Volume shall include the Past Performance information as described below and shall not exceed six (6) pages.
TAB D- Past Performance information described herein is required on the Offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform 25% or more of the proposed effort based on the total proposed price. The Offeror shall submit, along with the information required in this paragraph, a consent letter, executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the Offeror so the offeror can respond to such information. Attachment 9, Subcontractor/Teaming Partner Consent Form for the Release of Past Performance Information to the Prime Contractor, is provided as a SAMPLE. For each identified effort for a commercial customer, the Offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror's performance. In addition, the Offeror shall identify no more than three (3) of its most recent/relevant experienced Contracts/TOs/Delivery Orders (DOs) that either (i) it has successfully completed or (ii) it has performed in part, within the past three (3) years, including proposed Subcontractors.
a. Both recent and relevant are defined as follows:
i. Recent Contracts: Contracts, TOs, and/or DOs are those performed within (or currently performing) three (3) years from the date of issuance of this RFP.
ii. Relevant Contracts: Contracts, TOs, and/or DOs are those, which are similar in scope, magnitude, and complexity to the requirements in this RFP. Where prior relevant experience is under a broader Blanket Purchase Agreement (BPA) or IDIQ - type Contract, do not just cite the broader BPA or IDIQ Contract. Rather, include the specific individual TOs or Dos and dollar value of the firm’s portion, considered to be representative of relevant prior experience. Each prior Contract, TO, and/or DO identified by the Offeror as being responsive will be evaluated as evidence of relevant prior experience.
b. Relevancy Narrative: The Offeror shall address the relevancy of referenced contracts, TOs and/or DOs as well as similarity to the effort contemplated by the RFP. The discussion of similarity shall include a description of services or related tasks similar to those that it will be performed in support of LLC. In addition, the Offeror shall provide the following information:
i. Identify information on significant achievements. Describe any challenges or obstacles that were encountered during contract performance and the measures taken to overcome them.
ii. Include a discussion of the events or circumstances affecting any termination decision and/or performance litigation for any contracts/subcontracts identified as fully or partially “Terminated for Convenience or Default”, or was subject to litigation regarding performance.
c. The Offeror shall provide the following contract description information for each contract and/or subcontract in the order listed below. Table format is acceptable.
i. Contract number.
ii. Title of Program/Project.
iii. Identify whether you were the Prime or Subcontractor. If you were the
Subcontractor, provide the name of the Prime Contractor to whom the effort was awarded.
iv. Contract type.
v. Period of performance.
vi. Prime Contractor Awarded price/Subcontractor Award Amount.
vii. Prime Contractor Final or projected final price/Subcontractor Final or projected final price.
viii. Prime Contractor Annual dollar value/ Subcontractor Annual dollar value.
ix. Original delivery schedule.
x. Final or projected final delivery schedule.
xi. Government or commercial contracting activity, address, telephone and e-mail address.
xii. Government or commercial contracting activity technical representative or Contracting Officer’s Representative (COR), name, telephone number and e-mail address.
xiii. Status on referenced contract (prime or major Subcontractor).
d. Offerors without a record of relevant past performance shall clearly state that the Offeror does not have a record of relevant past performance information.
Note: The Government reserves the right to use data provided in the Offeror’s proposal and data obtained from other sources during past performance evaluation. To ensure inclusion of all references in the evaluation process, the Offeror is encouraged to provide the Government with the most current data on each reference. Please note that references provided on classified contracts cannot be verified. Also, it is recommended that Offerors limit references for performance as a first tier Subcontractor unless it cannot be avoided. In both of these cases, the Government could be limited to the amount of data available to perform the evaluation process.
5.4 VOLUME IV: Price (Factor IV): The Price Volume shall include the following information:
5.4.1 The Offeror shall submit its Price proposal in Microsoft Excel format, utilizing Microsoft Office 2013.
Spreadsheets shall be sent in a file format that includes all formulas, macro, and format information. Print image is not acceptable.
5.4.2 If proposing Subcontractors, the Offeror shall explicitly detail on its price proposal the amount of work subcontracted, in terms of both dollars and percentage.
5.4.3 The Contractor Manpower Reporting (CMR) requirements including CLINs 0005, 1004, 2004, and 3004 are not separately priced (NSP).
5.4.4 Travel and ODCs are anticipated; therefore, the Government has included NTE travel and ODC amounts as detailed in table 3 below. All Offerors shall propose the NTE travel and ODC amounts as identified in table 3 below for all identified travel and ODCs CLINs, for the Base and Option Years. The following amounts shall be utilized for evaluation purposes only in determining the total price for the entire contract.
Table 3: NTE Travel and ODC Amounts Description Base Period Option Year 1 Option Year 2 Option Year 3 Travel $100,000.00 $100,000.00 $100,000.00 $100,000.00
ODC $10,000.00 $10,000.00 $10,000.00 $10,000.00
5.4.5 Offerors are required only to price the base and option periods. Offerors shall not propose price for the potential six-month extension of services period (see FAR Clause 52.217-8). Procedures for price evaluation of the FAR 52.217-8, Option to Extend Services, are stated in paragraph 2.4.3 of Addendum to Clause 52.212-2.
5.4.6 The Price Volume shall include the following tabs:
TAB E1: Pricing Notes - This tab shall identify the Offeror’s proposed pricing and shall be submitted IAW with Attachment 4, CLIN Structure. This tab shall also be used to explain the Offeror’s Price Proposal, e.g., discounts offered, remittance address, explanation of Contractor-site and Government-site rates, not separately priced pricing data, etc.
TAB E2: Proposal Pricing Breakdown - This tab shall identify the Offeror’s proposal price for the full performance period of the requirement. The Offeror must clearly state the PWS Section, labor categories, proposed number of hours for each location, fully burdened labor rate for each occupation title and the total labor price. The Offeror’s total proposed price must be INCLUSIVE of the NTE Travel and ODC Government amounts reflected in Table 3 above. Attachment 5, Proposal Price Breakdown is provided as a SAMPLE.
TAB E3: Proposed Labor Categories and Hours - The Offeror shall identify labor categories, occupation titles and hours deemed necessary to successfully perform the contract. Attachment 6, Proposed Labor Categories and Hours, is provided as a SAMPLE.
Note: This Tab shall NOT include any proprietary information.
TAB E4: SCLS Labor Rates - The Offeror shall identify all proposed labor categories subject to the SCLS. When the SCLS applies, the Offeror shall cross reference the proposed labor classification with the applicable DOL Wage Determination and identify the corresponding labor category within the Wage Determination by occupation code and occupation title. The Offeror should price its proposal using the wage determination for specific location where the individual will be performing the work. The Offeror’s (and subcontractors) wage rates shall comply with the DOL Wage Rate minimum requirements for the area in which the work is to be done. The Offeror shall specify the city, state, and country in which the work will take place if other than that specified in the PWS. The Offeror is responsible for compliance with the SCLS. Attachment 7, SCLS Mapping Table, is provided as a SAMPLE.
TAB E5: Total Compensation Plan - Total Compensation Plan for Professional Employees (TCPPE). This solicitation incorporates FAR Clause 52.222-46. In its Price Proposal Volume, the Offeror shall submit a TCPPE setting forth direct labor rates and total fringe benefits proposed for labor categories identified by the Offeror as professional employees as defined by FAR 22.1102.
The TCPPE shall demonstrate the Offeror’s clear understanding of the work to be performed. The Offeror’s TCPPE shall indicate the capability of the proposed compensation structure to obtain and keep qualified personnel to meet mission objectives and provide uninterrupted high-quality work. The Offeror’s TCPPE shall address recruitment and retention, realism, and its consistency with a total plan for compensation. The Offeror’s TCPPE shall describe how the proposed salary rates for professional employees account for differences in skill, complexity of various disciplines, and professional job difficulty. The Offeror’s TCPPE shall include supporting information, such as national and regional compensation surveys and studies of professional, public and private organization used in establishing the total compensation structure Incumbent contractors shall submit information pertaining to the salaries and fringe benefits paid to incumbent contractor personnel who are currently performing, or have performed in the three (3) years prior to the date set for submission of proposals, in labor categories, or labor categories equivalent to, those identified by the offeror as professional employees. Attachment 8, Employee Total Compensation Plan, is provided as a SAMPLE. Professional Employee" is defined in FAR 22.1102 and may not apply to all labor categories. If applicable, the professional employee compensation plan must be submitted in addition to Attachment 6.
(END TO ADDENDUM 52.212-1)
ADDENDUM TO 52.212-2
A. BASIS OF AWARD – TRADE-OFF APPROACH
1. The Government intends to award a single contract resulting from the RFP to the Offeror whose proposal will provide the overall “Best Value” to the Government; Technical Capability (Technical Approach and Management Approach), Past Performance, and Price considered. Award will be based upon an integrated assessment of all price and non-price factors. Trade-offs between price and non-price factors are permitted. A proposal that demonstrates a Superior Technical Approach (Factor I) in the Work Processes and Work Scheduling Elements may be worth more to the Government than a proposal that only meets minimum requirements in Work Processes and Work Scheduling Elements. The Contracting Officer may select for award that offer in which the total evaluated Price is not necessarily the lowest, but whose overall proposal is deemed sufficiently more advantageous to the Government so as to justify the payment of a higher price. Conversely, the Contracting Officer may select for award the Offeror whose total evaluated price is the lowest when other responses are not sufficiently more advantageous to justify the payment of a higher price.
1.1 The Government intends to evaluate responses and award a contract without discussions/communications with Offerors. Therefore, the Offeror’s initial proposal shall contain its best terms from a price and technical standpoint.
However, the Government does reserve the right to negotiate with one or more, but not necessary all, Offerors for any reason, if the Government so desire. Any proposal revisions may be limited to the items negotiated. The
Government may accept other than the lowest price and waive informalities and minor irregularities in the submitted proposals.
1.2 Proposals submitted in response to this RFP will be evaluated by Government Subject Matter Experts. Careful, full, and impartial consideration will be given to all proposals not otherwise rejected. An adjectival rating scale shall be used for all non-price evaluation factors. See below for further details on Adjectival Ratings. The non-price evaluation will include: the proposal’s level of detail for the Technical Capability, the extent of experience related to the PWS requirements, strengths, weaknesses, deficiencies, and risk, and Past Performance (Factor III). Price will be evaluated for reasonableness.
B. EVALUATION CRITERIA
2.1. Evaluation Factors - Offerors will be evaluated on four (4) factors listed below:
2.1.0.1Technical Capabilities
2.1.0.1.1 Technical Approach (Factor I)
2.1.0.1.2 Management Approach (Factor II)
2.1.0.2 Past Performance - (Factor III)
2.1.0.3 Price - (Factor IV)
2.1.1. For the purposes of this RFP, the Order of Importance is clarified below:
2.1.1.1 Factor I, Technical Approach is more important than Factor II, Management Approach.
2.1.1.2 Factor I, Technical Approach and Factor II, Management Approach when combined are more important than Factor III, Past Performance and Factor IV, Price.
2.1.1.3 Factor I, Technical Approach, Factor II, Management Approach and Factor III, Past
Performance when combined are significantly more important than Factor IV, Price.
Award will be based upon an integrated assessment of all price and non-price factors. Trade-offs between price and non-price factors are permitted.
2.2. VOLUME II: Technical Capability
2.2.1. Technical Approach (Factor I): The Government will assess the Offeror’s capability to perform the technical tasks outlined in the PWS by evaluating its technical understanding and knowledge as described in the Offeror’s proposal. The Government will evaluate and assign a rating to each of the following Technical Elements listed in Descending Order of Importance.
*Note. There will NOT be an overall rating for Technical Approach; however, the elements within each factor will be evaluated and rated on its own.
TAB B1 - Work Processes (Element I): The Government will assess the Offeror’s proposed work processes to determine whether the processes demonstrate an in-depth understanding of the LLC’s capabilities and mission. In addition, the following elements addressed in the Offerors work processes will be evaluated to determine if the proposed work processes demonstrate effective work processes to implement and complete efficient, quality, and timely performance of the tasks outlined in the PWS:
a. Identification and description of the major work processes that will be used to fulfill the requirements in the PWS.
b. Identification and description of the interfaces between the work processes.
c. Definition of the inputs and outputs of these processes.
TAB B2 - Work Scheduling (Element II): The Government will evaluate the Offeror’s proposed work scheduling, including the employment of any automated systems or work loading procedures, to determine if they demonstrate an effective approach to implement and perform the requirements of the PWS with respect to the following:
a. Management and scheduling of work for the entire LLC effort at ALL the sites identified in the
PWS.
b. Identification of the resources and activities needed for assigned tasks.
c. Coverage for work surges and after duty hours.
TAB B3 - Quality Control (Element III): The Government will evaluate the following elements of the Offeror’s proposed quality control approach to determine their effectiveness to ensure quality performance and compliance of all key control elements, deliverables and metrics IAW the PWS Paragraphs 1.5.3.
a. Quality Control Management processes.
b. Quality Control roles and responsibilities.
c. Methods of surveillance/monitoring.
d. Methods for identifying and correcting deficiencies.
e. Methods for customer feedback.
f. Measures of performance.
g. Reporting requirements and their frequencies.
2.2.2. Management Approach (Factor II): The Government will assess the Offeror’s ability to demonstrate their understanding of the various Management Elements identified below with respect to requirements indicated in the PWS. The Government will evaluate and assign a rating to each of the following Management Approach Elements listed in Descending Order of Importance.
*Note. There will NOT be an overall rating for Management Approach; however, the elements within each factor will be evaluated and rated on its own.
TAB C1- Phase-In Plan (Element I): The Government will evaluate the Offeror’s capability to outline an organization structure, staffing, tasks, and approach to determine if the proposal demonstrates an effective plan to complete the transition of services from the current Contractor to the new Contractor within the required time to ensure smooth transition of the contractual requirement.
TAB C2 – Staffing, Resource Management, and Key Personnel (Element II): The Government will evaluate the Offeror’s proposed Staffing, Resource Management, and Key Personnel to determine if the Offeror is capable of providing the LLC’s requirements identified in the PWS. The staffing, resource management and key personnel approach will be evaluated as follows:
a. Staffing: The Government will evaluate the Offeror’s Staffing approach with respect to the requirements listed in the subparagraphs below to determine if the proposed methods demonstrate an effective approach to provide a sufficiently skilled and adequate workforce capable of meeting the requirements of the PWS.
i. Proposed staffing for each site identified in the PWS with the estimated personnel numbers and labor categories.
ii. Proposed methods for cross-utilization of personnel at and between sites.
iii. Proposed training strategies to ensure personnel have the necessary skill levels for contract execution.
b. Resource Management and Key Personnel: The Government will evaluate the Offeror’s Resource Management and Key Personnel approach to determine if the proposed key personnel, management, and administrative teams possess the experience, qualifications, and abilities required to implement and complete the requirements outlined in the PWS as well as the proposed program manager and key personnel are effectively utilized to meet all the PWS requirements. The
Government will evaluate the resumes of Key Personnel to determine they demonstrate the capability to perform PWS requirements. The Resource Management and Key Personnel approach will be evaluated with respect to the following:
i. How its program manager and other key personnel will be utilized.
ii. Staffing processes and tools to be used such as headhunter and recruiting sites.
iii. Key personnel certifications, security clearances, education and work experience.
TAB C3 - Management Controls: (Element III): The Government will evaluate the Offeror’s proposed performance monitoring procedures, performance indicators, management risk mitigation and problem escalation processes to determine if the proposal demonstrates effective management procedures to monitor personnel to ensure they are capable of meeting the requirements outlined in the PWS.
TAB C4 - Organizational Interfaces and Communications (Element IV): The Government will evaluate the Offeror’s proposed methods, strategies, and tools used to facilitate information exchange to determine if the proposal demonstrates an effective approach to interface and communicate with the different work…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .