This is a Performance Requirements Summary excerpt from a Performance Work Statement (PWS) for Catholic priest services for FY26. The document establishes performance objectives and minimum acceptable service levels that are critical to mission success.

The contractor must deliver the following services with 100% performance standards: conduct up to four weekend masses on Saturdays and Sundays; hold confession before or after each weekend mass; conduct eight Holy Day masses annually; conduct two penance services; and conduct 24 special masses. Additionally, the contractor must provide counseling services for various special needs including pastoral care, marital counseling, and premarital counseling as specified in sections 5.2.11, 5.2.12, and 5.2.14 of the PWS. All services are subject to periodic inspection surveillance with monthly Contracting Officer Representative (COR) reports submitted to the Contracting Officer (KO). The first failure to meet performance standards will result in issuance of a Contractor Action Request for Continuance, with consecutive failures triggering a corrective action plan developed at the KO's discretion.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS_FBTX_CatholicPriest_FY26_V6 24

TECHNICAL EXHIBIT 1

PERFORMANCE REQUIREMENTS SUMMARY

The contractor service requirements are summarized as performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Task PWS Paragraph

Standard/AQL Method of Surveillance

First failure will result in the issuance of a Contractor Action Request Continuance for not meeting performance standard. Consecutive failures will result in a corrective action plan developed at the discretion of the KO.

Weekend Mass 5.2.1 Conduct up to four weekend masses on Saturdays and Sundays. 100%

Periodic Inspection

Monthly COR Reports to the KO

Confession 5.2.4 Hold Confession before or after each weekend mass.

100%

Periodic Inspection

Monthly COR Reports to the KO

Holy Day Mass 5.2.18 Conduct eight Holy Day masses. 100%

Periodic Inspection

Monthly COR Reports to the KO

Penance Service

5.2.19 Conduct two

penance services.

100%

Periodic Inspection

Monthly COR Reports to the KO

Special Masses 5.2.21 Conduct 24 special masses. 100%

Periodic Inspection

Monthly COR Reports to the KO

Counseling (Pastoral Care, Marital & Pre-marital, etc.)

5.2.11, 5.2.12, 5.2.14

Counsel various special needs as specified.

Periodic Inspection

Monthly COR Reports to the KO