TE-1 Performance Requirements Summary.pdf

PDF 44 KB Posted

Attached to
W911RX-26-Q-A0520001: Ft Bliss Catholic Priest Services
Solicitation number
W911RX-26-Q-A052
Issued by

About this file

This is a Performance Work Statement (PWS) Technical Exhibit documenting performance requirements summary for a Catholic priest services contract for fiscal year 2026. The document establishes contractor service requirements as performance objectives directly tied to mission-essential items, with performance thresholds defining minimum acceptable service levels critical to mission success.

The PWS specifies two primary performance tasks with 100% Acceptable Quality Level (AQL) standards. The Weekend Mass requirement (PWS Paragraph 5.2.1) mandates conducting masses on Saturdays and Sundays, while the Weekday Mass requirement (PWS Paragraph 5.2.19) requires conducting weekday masses of 30 minutes each. Both tasks are subject to periodic inspection through monthly Contracting Officer's Representative (COR) reports to the Contracting Officer (KO). Performance monitoring and enforcement procedures indicate that a first failure to meet either standard will result in issuance of a Contractor Action Request Continuance, while consecutive failures will trigger development of a corrective action plan at the discretion of the KO.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS_FBTX_CatholicPriest_FY26_V6 22

TECHNICAL EXHIBIT 1

PERFORMANCE REQUIREMENTS SUMMARY

The contractor service requirements are summarized as performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Task PWS Paragraph

Standard/AQL Method of Surveillance

First failure will result in the issuance of a Contractor Action Request Continuance for not meeting performance standard.

Consecutive failures will result in a corrective action plan developed at the discretion of the KO.

Weekend Mass

5.2.1 Conduct weekend

masses on Saturdays and Sundays. 100%

Periodic Inspection

Monthly COR Reports to the KO

Weekday Mass

5.2.19 Conduct Weekday

Mass 30 minutes each. 100%

Periodic Inspection

Monthly COR Reports to the KO

File details come from the government source that posted it. Updated .