This is a Standard Form 30 contract modification issued by the U.S. Army (W96QM MICC-FT RILEY, Kansas) dated May 20, 2026, for contract number W911RX26QA034. The modification is Amendment 0003 and changes the program start date from June 1, 2026, to June 15, 2026.

The amendment modifies the period of performance for all contract line items (CLINs 0001 through 0021) and option line items (1001-4021 spanning fiscal years 2027-2031). All periods of performance are shifted forward by 14 days: base year CLINs change from "01 JUN 2026 to 31 MAY 2027" to "15 JUN 2026 to 14 JUN 2027," with corresponding 14-day shifts applied to each subsequent option year. The modification maintains the same contract structure and terms, with only the delivery schedule dates affected. The contracting officer, Savannah R. Kennedy, signed the modification on May 20, 2026. All other contract terms and conditions remain unchanged and in full force and effect per the modification language.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of 01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

W911RX26QA0340003

Performance

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of 01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

INFORMATION FROM TO

Period of Performance

01 Jun 2026 to 31 May 2027 15 Jun 2026 to 14 Jun 2027

Option Line Item 1001

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1002

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1003

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1004

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1005

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1006

INFORMATION FROM TO

Period of 01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1007

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1008

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1009

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1010

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1011

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1012

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1013

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1014

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1015

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1016

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1017

INFORMATION FROM TO

Period of 01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1018

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1019

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1020

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 1021

INFORMATION FROM TO

Period of Performance

01 Jun 2027 to 31 May 2028 15 Jun 2027 to 14 Jun 2028

Option Line Item 2001

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2002

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2003

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2004

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2005

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2006

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2007

INFORMATION FROM TO

Period of 01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2008

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2009

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2010

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2011

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2012

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2013

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2014

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2015

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2016

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2017

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2018

INFORMATION FROM TO

Period of 01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2019

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2020

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 2021

INFORMATION FROM TO

Period of Performance

01 Jun 2028 to 31 May 2029 15 Jun 2028 to 14 Jun 2029

Option Line Item 3001

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3002

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3003

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3004

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3005

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3006

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3007

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3008

INFORMATION FROM TO

Period of 01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3009

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3010

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3011

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3012

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3013

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3014

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3015

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3016

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3017

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3018

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3019

INFORMATION FROM TO

Period of 01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3020

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 3021

INFORMATION FROM TO

Period of Performance

01 Jun 2029 to 31 May 2030 15 Jun 2029 to 14 Jun 2030

Option Line Item 4001

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4002

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4003

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4004

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4005

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4006

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4007

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4008

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4009

INFORMATION FROM TO

Period of 01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4010

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4011

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4012

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4013

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4014

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4015

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4016

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4017

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4018

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4019

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4020

INFORMATION FROM TO

Period of 01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

Option Line Item 4021

INFORMATION FROM TO

Period of Performance

01 Jun 2030 to 31 May 2031 15 Jun 2030 to 14 Jun 2031

IDCode: J
Page: 1
Pages: 21
AmendNo: 0003
EffDate: 20 MAY 2026
ReqNo:
ProjNo:
IssCode: W911RX
AdmCode:
IssuedBy: W6QM MICC-FT RILEY

KO DIRECTORATE OF CONTRACTIN, 1792 12TH STREET

FORT RILEY, KS 66442-0248

UNITED STATES

PATRICIA BARTH, EMAIL: PATRICIA.J.BARTH3.CIV@ARMY.MIL TELEPHONE: 520-944-2084

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W911RX26QA034
SolDate: 22 APR 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this Amendment is to change the POP to start on 15 JUN 26.
ContNameTitle:
CoNameTitle: SAVANNAH R. KENNEDY
ContDate:
CODate: 20 MAY 2026