ACWS Solicitation Amendment 30 2026.08.04.pdf

PDF 4 MB Posted

Attached to
Roof Repair- Fort Bliss, T. X.
Solicitation number
W911RX-26-B-A003
Issued by

About this file

This is Standard Form 30 (Amendment 0002 of Solicitation W911RX26BA003), issued by the U.S. Army Corps of Engineers on July 21, 2026, with an effective date of August 4, 2026. The amendment does not extend the receipt date for offers and modifies the Table of Contents to include an updated RFO FAR 52.219-2 Equal Low Bids provision (effective July 1, 2026) applicable to small business concerns. The provision permits small business bidders to claim priority consideration in case of tie bids if they identify labor surplus areas where manufacturing or production costs exceed 50 percent of the contract price; failure to identify such areas precludes priority consideration eligibility.

The amendment adds twelve attachments to the solicitation: a Statement of Work dated April 2, 2026; Drawing, Roof Plans, and Site Map; Davis Bacon Act Wage Determination; Asbestos Lead Survey; iWATCH Training materials; TRADOC 928-R-E Material Approval Submittal Form; ENG Form 4288-R Submittal Register Form; DPW-RFI Template; Environmental Review Form and Checklist; As Builts Roof Details; and Solicitation Questions and Answers dated August 3, 2026. The contracting office is W911RX at Fort Riley, Kansas, with the contracting officer Kevin M. Jones, and the project number is MED 10211 5J. Offerors must acknowledge receipt of this amendment by completing items 8 and 15, acknowledging receipt on each offer copy, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers prior to the offer receipt deadline.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 01 10 - Table of Contents

Miscellaneous text in this section has been modified to:

RFO FAR 52.219-2 Equal Low Bids. (Updated 7/1/2026)

As prescribed in , insert the following provision: 19.203(b)

Equal Low Bids (Deviation Date)

(a) This provision applies to small business concerns only.

(b) The bidder's status as a labor surplus area (LSA) concern may affect entitlement to award in case of tie bids.

If the bidder wishes to be considered for this priority, the bidder must identify, in the following space, the LSA in which the costs to be incurred on account of manufacturing or production (by the bidder or the first-tier subcontractors) amount to more than 50 percent of the contract price.

(c) Failure to identify the labor surplus areas as specified in paragraph (b) of this provision will preclude the bidder from receiving priority consideration. If the bidder is awarded a contract as a result of receiving priority consideration under this provision and would not have otherwise received award, the bidder shall perform the contract or cause the contract to be performed in accordance with the obligations of an LSA concern.

(End of provision)

Solicitation Attachments

Attachment 1 - Statement of Work (02 April 2026)

Attachment 2 - Drawing, Roof Plans, & Site Map.pdf (31 March 2026)

Attachment 3 - Davis Bacon Act (DBA) Wage Determination.pdf (18 May 2026)

Attachment 4 - Asbestos Lead Survey.pdf (03 July 2008)

Attachment 5 - iWATCH Training.pdf

W911RX26BA0030002

Attachment 6 - TRADOC 928-R-E Material Approval Submittal Form.pdf

Attachment 7 - ENG_FORM_4288-R_Submittal Register Form.pdf

Attachment 8 - DPW-RFI Template_Blank Form V.1.2.pdf

Attachment 9 - Environmental Review Form_MED 10211 5J.pdf

Attachment 10 - Environmental Review Checklist_MED 10211 5J12_4-29-2026

- B2417_As Builts Roof Details.pdfAttachment 11

Solicitation Question and Answers 2026.08.03Attachment 12-

W911RX26BA0030002

IDCode: J
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 21 JUL 2026
ReqNo:
ProjNo: MED 10211 5J
IssCode: W911RX
AdmCode:
IssuedBy: W6QM MICC-FT RILEY

KO DIRECTORATE OF CONTRACTIN, 1792 12TH STREET

FORT RILEY, KS 66442-0248

UNITED STATES

JENNIFER DAVIS, EMAIL: JENNIFER.L.DAVIS427.CIV@ARMY.MIL TELEPHONE: 520-944-2637

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W911RX26BA003
SolDate: 08 JUL 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to add attachment 11 - B2417_As Builts Roof Details and attachment- 12 - Solicitation Questions and Answers 2026-08.03
ContNameTitle:
CoNameTitle: KEVIN M. JONES
ContDate:
CODate: 04 AUG 2026