Exhibits-7_Pricing_Spreadsheet_Amendment_0001.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Lighting protection System Service(LPS) contract
- Solicitation number
- W911RX-19-B-0007
About this file
This Exhibits 7 - Pricing Spreadsheet is the correct one to use in the pricing of a quote for the solicitation. Effective 12 Feb 19 no other changes have been made to the solicitation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule Lightning Protection System Test Points and Tests
| Location and Quantity | ||||||||||||||||||||||||||||||||||||||||||||||
| CLIN TE | Description of Task | ASP Inspection Yard - Building 919 | ASP Building 924 | ASP Building 924A | ASP Magazine 925 | ASP Building 929 | ASP Magazine 930 | ASP Magazine 934 | ASP Magazine 944 | ASP Magazine 945 | ASP Magazine 946 | ASP Magazine 947 | ASP Magazine 948 | ASP Magazine 949 | ASP Magazine 950 | ASP Magazine 951 | ASP Magazine 952 | ASP Magazine 953 | ASP Magazine 954 | ASP Magazine 955 | ASP Magazine 970 | ASP Magazine 971 | ASP Magazine 972 | ASP Magazine 973 | ASP Magazine 974 | ASP Magazine 975 | Ammunition Holding Area - Building 995 | Building 1910 ARMAG | Building 7173 ARMAGs 1 thru 3 | Range 18 Ammunition Loading Dock - Building 9080A | MPRC Ammunition Loading Dock - Building 9375 | MPRC ASP Field Storage Site Pad A - Building 9319 | MPRC ASP Field Storage Site Pad B - Building 9319 | MPRC ASP Field Storage Site Pad C - Building 9319 | MPRC ASP Field Storage Site Pad D - Building 9319 | DMPTR Ammunition Loading Dock - Building 99651 | Total Estimated Quanity | Unit | Base Year Unit Price | Base Year Total Price | Option Year One Unit Price | Option Year One Total Price | Option Year Two Unit Price | Option Year Two Total Price | Option Year Three Unit Price | Option Year Three Total Price |
| 0001 AA | Perform visual inspections, preventive maintenance, and routine repairs on terminal and caterary LPS componets and connections at ground level. | 1 | 11 | 13 | 15 | 12 | 7 | 8 | 11 | 14 | 7 | 10 | 8 | 8 | 14 | 14 | 7 | 10 | 14 | 14 | 8 | 8 | 8 | 8 | 8 | 8 | 24 | 8 | 24 | 28 | 4 | 10 | 4 | 4 | 5 | 2 | 359 | EA | n/a | n/a | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 |
| 0001 AB | Perform visual inspections, preventive maintenance, and routine repairs on terminal and caterary LPS componets and connections above ground level. | 10 | 25 | 30 | 8 | 14 | 8 | 8 | 8 | 8 | 6 | 4 | 4 | 6 | 8 | 8 | 8 | 8 | 8 | 8 | 5 | 5 | 5 | 5 | 5 | 5 | 36 | 6 | 17 | 22 | 22 | 22 | 22 | 6 | 370 | EA | n/a | n/a | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | ||
| 0001 AC | Grounding Rod Loop Test Between Grounding Rod Test Points. | 6 | 8 | 4 | 10 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 13 | 2 | 4 | 7 | 7 | 7 | 7 | 2 | 157 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | |||
| 0001 AD | Grounding Rod 3-Point Fall of Potential Resistence to Earth Test at each grounding rod with the grounding rod to be tested isolated from the all other elements of the LPS. Includes disconnecting the grounding rod to be tested from the grounding loop and reconnecting the grounding rod following the test. | 6 | 8 | 4 | 10 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 10 | 2 | 14 | 2 | 4 | 6 | 6 | 6 | 6 | 2 | 166 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | |
| 0001 AE | Grounding Rod 3-Point Fall of Potential Resistence to Earth Test at grounding rod "A" with the grounding rod connected to the grounding loop. | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 32 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | |||
| 0001 AF | Bond Resistence Test Between Ground Rod and Air Terminal, Guy Wire, Catenary Wire, Obstruction Light, or Area Lighting Pole | 10 | 25 | 30 | 8 | 14 | 8 | 8 | 8 | 8 | 6 | 4 | 4 | 6 | 8 | 8 | 8 | 8 | 8 | 8 | 5 | 5 | 5 | 5 | 5 | 5 | 36 | 6 | 17 | 22 | 22 | 22 | 22 | 6 | 370 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | ||
| 0001 AG | Bond Resistence Test Between Ground Rod and Fence Ground Point, Fence Gate Post, Fence Gate, or ARMAG Magazine Corner | 24 | 6 | 27 | 10 | 4 | 4 | 5 | 80 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | ||||||||||||||||||||||||||||
| 0001 AH | Bond Resistence Test Between Ground Rod and Personnel Door, Overhead Door, Magazine Door, Magazine Door Hinge, Magazine Door Latch, Magazine Door Stop, Magazine Door Awning, Door or Wall Louver, or Door or Wall Louver Damper, | 6 | 6 | 9 | 6 | 4 | 5 | 7 | 10 | 5 | 5 | 5 | 5 | 10 | 10 | 5 | 5 | 10 | 10 | 5 | 5 | 5 | 5 | 5 | 5 | 1 | 154 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | ||||||||||
| 0001 AI | Bond Resistence Test Between Ground Rod and Roof Ventilator | 2 | 2 | 2 | 1 | 1 | 1 | 1 | 2 | 2 | 1 | 1 | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | 26 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | ||||||||||||||||
| 0001 AJ | Bond Resistence Test Between Ground Rod and Pipe Handrail, Chain Rail Post, Electrical Conduit, Electrical Transformer, Electrical Box or Panel, Communication Panel, or Telephone Pedestal | 5 | 6 | 4 | 3 | 3 | 2 | 2 | 1 | 4 | 2 | 2 | 2 | 2 | 1 | 4 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 28 | 2 | 2 | 92 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | ||||||||
| 0001 AK | Bond Resistence Test Between Ground Rod and Trench Drain, Metal Edge - Loading Dock, or Metal Edge - Apron | 1 | 2 | 3 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | |||||||||||||||||||||||||||||||||
| 0001 AL | Bond Resistence Test Between Ground Rod and Work Bench or Grenade Box | 6 | 6 | EA | $0.00 | $0.00 | n/a | n/a | $0.00 | $0.00 | n/a | n/a | ||||||||||||||||||||||||||||||||||
| 0001 AM | 45'-0" Engine Powered, Articulating (Up/Over) Boom Manlift | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 18 | LS | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| 0001 AN | 60'-0" Engine Powered, Articulating (Up/Over) Boom Manlift | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 | LS | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||||
| 0001 AO | 125'-0" Engine Powered, Articulating (Up/Over) Boom Manlift | 1 | 1 | LS | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
CLIN Totals CLIN 0001 $0.00 CLIN 1001 $0.00 CLIN 2001 $0.00 CLIN 3001 $0.00
2 Reimbursement for invoiced cost of repair parts to repair any LPS at any location identified during visual inspections. 1 NTE $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
CLIN Totals CLIN 0002 $5,000.00 CLIN 1002 $5,000.00 CLIN 2002 $5,000.00 CLIN 3002 $5,000.00
3 Reimbursement for cost of materials, labor, and/or equipment including overhead and profit required for miscellaneous work of LPS at any location. 1 NTE $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00
CLIN Totals CLIN 0003 $20,000.00 CLIN 1003 $20,000.00 CLIN 2003 $20,000.00 CLIN 3003 $20,000.00
4 Contractor Manpower Reporting. 1 LS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CLIN Totals CLIN 0004 $0.00 CLIN 1004 $0.00 CLIN 2004 $0.00 CLIN 3004 $0.00 n/a Total Prices $25,000.00 $25,000.00 $25,000.00 $25,000.00 n/a Total Contract Price $100,000.00
File details come from the government source that posted it.