SECTION_01_55_26_TRAFFIC_CONTROL_AND_SAFETY.docx

DOCX document 27 KB Posted

Attached to
Ft Riley Road Maintenance Contract Solicitation
Solicitation number
W911RX-17-B-0009
Issued by

About this file

Section 01 55 26 Traffic Control and Safety

View the file

Other files

File Type Posted
Revised_SECTION_01_45_00_QUALITY_CONTROL_Revised_2017-09-18.docx DOCX document
W911RX-17-B-0009-0001_Confirm_Copy_27_Sep_2017.pdf PDF
Revised_W911RX-17-R-0007_Ft_Riley__Exhibit_A_through_E__Bid_form_REVISE....xlsx XLSX spreadsheet
Attachment_4_Borrow_Pits.pdf PDF
Final_W911RX-17-B-0009-0001_Ft_Riley_Road_Maintenance_27_Sep_2017.pdf PDF
Revised_SECTION_31_00_00_Earthwork_REVISED_2017-08-28.docx DOCX document
Attachment_3_KDOT_Standard_TE_Drawings.pdf PDF
W911RX-17-B-0009-0001_Ft_Riley_Road_Maintenance__SV_Q_and_A__26_SEP_2017.pdf PDF
Final_W911RX-17-B-0009_Ft_Riley_Road_Maintenance__16_August_2017.pdf PDF
Kansas_Wage_Determination_06_June_2017.pdf PDF
Attachment_1_Construction_Staging_Area.pdf PDF
SECTION_01_33_00_SUBMITTALS.docx DOCX document
SECTION_01_57_23_TEMPORARY_STORM_WATER_POLLUTION_CONTROL.docx DOCX document
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION.docx DOCX document
SECTION_32_31_13_CHAIN_LINK_SECURITY_FENCE.docx DOCX document
SECTION_32_01_16_COLD_MILLING_OF_BITUMINOUS_PAVEMENTS.docx DOCX document
W911RX-17-B-0009__Ft_Riley_Technical_Exhibit_A_through_E__Bid_form_10_August_2017.xlsx XLSX spreadsheet
Attachment_2_Daily_Rate_of_Performance.xlsx XLSX spreadsheet
SECTION_31_00_00_Earthwork.docx DOCX document
SECTION_01_12_00_SPECIAL_REQUIREMENTS.docx DOCX document
SECTION_01_45_00_QUALITY_CONTROL.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 55 26 TRAFFIC CONTROL AND SAFETY

PART 1 GENERAL

1.1 SCOPE: The work covered by this section includes the furnishing and placing of all signs, barricades and warning lights required to provide for traffic control and safety during road maintenance, repair, and construction, as well as, the furnishing and placing of permanent traffic signs.

1.2 APPLICABLE PUBLICATIONS: The publications listed below form a part of this section to the extent referenced. Publications are referred to by basic designation only. Publications shall be assumed to be the most current edition in effect at the time a contract is awarded.

1.2.1 Manual on Uniform Traffic Control Devices for Streets and Highways

1.2.2 KDOT Standard Specifications for State Road and Bridge

1.2.3 E-385-1-1 Safety and Health Requirements Manual

1.3 SUBMITTALS:

1.3.1 List of Materials: The Contractor shall submit a certified list of materials in accordance with the KDOT Standard Specifications and a traffic control plan. See KDOT Part V along with the Standard Specifications for further information.

1.4 METHOD OF PAYMENT: The cost of Construction Traffic Control and Safety shall be subsidiary to other bid items.

PART 2 PRODUCTS

2.1 MATERIALS: Materials furnished under this section shall be standard products of manufacturers regularly engaged in the production of the items, and the most current design which conforms to the requirements specified in Section 805.2 of the KDOT Standard Specifications

2.2 TRAFFIC CONTROL DEVICES: Traffic control signs and devices shall conform to Section 805 of the KDOT Standard Specifications for State Road and Bridge Construction.

PART 3 EXECUTION

3.1 GENERAL: All work shall be accomplished in accordance with Section 805 of the KDOT Standard Specifications for State Road and Bridge Construction, and the Flagging Handbook, except as modified and supplemented hereinafter.

3.2 CONSTRUCTION REQUIREMENTS: Sections of road on this project may be closed to traffic, except emergency and construction traffic, during the construction period, if approved by the COR. The Contractor shall give a minimum of two weeks’ notice before any road may be closed. A sign shall be installed a minimum of 7 business days before roadway repairs are to begin. The Contractor shall verify the location of all underground utilities prior to any excavation. Any damage to utilities or communication cables within 3 feet of marked locations shall be repaired or paid for by the Contractor at no additional expense to the Government. The Contractor shall conform to the requirements of Section 805.3 of the KDOT Standard Specifications.

3.2.1 Erection: Barricades shall be erected not more than 2 business days in advance of the date that construction is scheduled to begin. In addition, the Contractor shall notify the Contracting Officer and COR 14 business days in advance of the date proposed for closing the road to traffic.

3.3 MAINTENANCE OF TRAFFIC CONTROL DEVICES: Weekly checks of traffic control devices shall be made at night by the Contractor to ensure that such devices are in place and in satisfactory working condition. The Contractor is responsible for the maintenance of all traffic control devices according to Section 805 of the KDOT Standard Specifications. All such devices shall be removed immediately when no longer needed.

3.4 ROADSIDE SAFETY: When not engaged in construction activity, the Contractor shall place all construction equipment, vehicles and stockpiles in locations which will not constitute a hazard to the travelling public. Whenever possible, equipment shall be parked a minimum of 30 feet from the edge of a travelled way, and in locations which will not obstruct the vision of approaching drivers. The Contractor shall operate all construction traffic equipment at the project site in a safe and courteous manner.