RRAD_MATOC_RFP_Questions.pdf
PDF 79 KB Posted
- Attached to
- Construction at Red River Army Depot (RRAD)
- Solicitation number
- W911RQ-18-R-0267
About this file
This document contains questions and answers regarding a solicitation for construction services at Red River Army Depot. The solicitation seeks proposals for a variety of minor construction projects in trades such as carpentry, road repair, roofing, excavation, electrical, HVAC, fire protection, telecommunications, plumbing, sheet metal, painting, demolition, concrete, and welding. Questions addressed include clarification on pricing requirements, reporting requirements, and proposal submission instructions. Offerors are advised to price proposed welder labor to capture a mix of potential positions. Past performance may include projects with incomplete closeout or change orders if requirements in Section L are met. An official solicitation is expected to be posted on August 3rd, with proposals due around September 2nd. The U.S. Army Contracting Command in Warren, Michigan will award contracts to support real property sustainment, restoration, modernization, repair and minor construction at Red River Army Depot in Texarkana, Texas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RRAD_MATOC_RFP_Questions_(4th_Wave).pdf | ||
| RRAD_MATOC_RFP_Questions_(3rd_Wave).pdf | ||
| W911RQ-18-R-0267_0002.pdf | ||
| RRAD_MATOC_RFP_Questions(2nd_Wave).pdf | ||
| Attachment_0002_-_Past_Performance_Questionnaire.DOC | DOC document | |
| Amendment_0001_W911RQ-18-R-0267_RRAD_MATOC_.pdf | ||
| Attachment_0001_-_Pricing_Matrix.xlsx | XLSX spreadsheet | |
| Attachment_0002_-_Past_Performance_Questionnaire.DOC | DOC document | |
| RFP_W911RQ-18-R-0267_RRAD_MATOC_.pdf | ||
| RFP_W911RQ-18-R-0267_RRAD_MATOC_.pdf | ||
| Attachment_0002_-_Past_Performance_Questionnaire.DOC | DOC document | |
| Attachment_0001_-_Pricing_Matrix.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Number
Document Question/Comments Answer/Response Date Received
Date Posted
1 Solicitation On Attachment_001, the pricing matrix, most of the items are pretty straight forward. However, the welder is not. It makes a difference if the welder is welding pipe or structure steel. Can you please explain what is expected to be inputted as the base and fringe rate?
After review of the Davis Bacon Act (DBA), there is not a minimum wage and fringe that must be paid to welders. Because the "Welders" category represent only 1% or 1200 hours out of 120,000 hours included in the attachment, I would advise all offerors to price its proposed welders to capture a mix of potential welder positions.
8/10/2018 8/22/2018
2 Solicitation Starting on page 6 through page 14 there are various different reports called out.
Are these reports expected to be submitted with the proposal?
These reports are not to be submitted with a proposal. However, these Contract Data Requirements List (CDRL) reports shall be reviewed and submitted at the individual Task Order level.
8/10/2018 8/22/2018
3 Solicitation On pages 55-65 there are several blanks to be filled in. Is this to be part of our proposal?
Yes, the blanks have to be filled in. 8/10/2018 8/22/2018
4 Solicitation On pages 73-76 there is mention of a letter of credit. Are we to submit a letter of credit as part of our proposal? If not, is bid bond required in place of the letter?
The offeror may use a 52.228-14 Irrevocable Letter of Credit (ILC), in lieu of a bid bond or to secure other types of bonds such as performance and payment bonds. The ILC is available as an alternative to a construction bond.
8/10/2018 8/22/2018
5 Solicitation Are there drawings on this project? No 8/14/2018 8/22/2018
6 Solicitation I have a job currently through the MATOC procurement at RRAD that has been completed (original scope of work). The project is not closed out due to a change order that has been held up for months in legal and admin departments. Could I use that project as a past performance even though the project has not been closed out and there is a MOD in waiting?
Please refer to Section L.4.1.1, L.4.1.2, L.4.1.3.4 of the RFP. 8/17/2018 8/22/2018
7 Solicitation Question 7: We are a General Contractor in the processing of completing our renewed 5 year Contract Application. Can you please provide us with direction as to who will fill out the Past Performance Questionnaire for us?
Please refer to Section L.4.1.3.4 8/21/2018 8/22/2018