Summary of Changes for Amendment 1-5 - combined.docx

DOCX document 16 KB Posted

Attached to
Solicitation for Base-Wide Fire Alarm Transmission System
Solicitation number
W911QY-23-R-1021
Issued by

About this file

This document provides summaries of changes for five amendments to a solicitation for a base-wide fire alarm transmission system. The solicitation seeks design and installation of a new fire alarm system for buildings at the National Security Campus including an added requirement for building 65. The amendments update technical exhibits, add a design after award document, provide consolidated question and answer files, update drawings to include building 65, and extend the proposal due date four times ultimately to September 25, 2023. The solicitation is identified as W911QY-23-R-1021 and is issued by the Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground.

View the file

Other files

File Type Posted
QA Amendments 1-3 and 9 - combined 10-25-2023.xlsx XLSX spreadsheet
Appendix B - NSSC FACP Locations-Rev.pdf PDF
W911QY-23-R-1021 Amendment 8.pdf PDF
W911QY23R1021 - Solicitation Posting - 7-31-2023 - Amendment 6.pdf PDF
W911QY23R1021 - Solicitation Posting - 7-31-2023 - Amendment 5.pdf PDF
Summary of Changes for Amendment 1-4 - combined.docx DOCX document
QA Amendments 1 2 and 3 - combined.xlsx XLSX spreadsheet
W911QY23R1021 - Solicitation Posting - 7-31-2023 - Amendment 4.pdf PDF
Summary of Changes for Amendment 1 2 and 3 - combined.docx DOCX document
QA Amendments 1 2 and 3 - combined.xlsx XLSX spreadsheet
W911QY23R1021 - Solicitation Posting - 7-31-2023 - Amendment 2.pdf PDF
QA Amendments 1 and 2 - combined.xlsx XLSX spreadsheet
Summary of Changes for Amendment 1 and 2 - combined.docx DOCX document
Copy of Site-Visit Attendee List.pdf PDF
Attachment 11 - Bid Schedule.xlsx XLSX spreadsheet
W911QY23R1021 - Solicitation Posting - 7-31-2023 - Amendment 1.pdf PDF
Justification and Approval AES Equipment_Redacted.pdf PDF
Attachment 12 - Davis-Bacon Act WD MA20230001.pdf PDF
20230809 - FA Transmission Bidder Qs.xlsx XLSX spreadsheet
Appendix B - NSSC FACP Locations-Rev.pdf PDF
Attachment 13 - Past Performance Questionnaire.pdf PDF
Appendix A - Ground Floor Plan Bld 1.pdf PDF
W911QY23R1021 - Wireless Reporting Fire Alarm Transmission.pdf PDF
Attachment 12 - Past Performance Questionnaire.pdf PDF
Appendix D - NSSC Contractor Request For -.docx DOCX document
Appendix C - NSSC Campus Map.pdf PDF
Attachment 4 - TE -02 Submittal Register.pdf PDF
Appendix B - NSSC FACP Locations.pdf PDF
Attachment 10 - Bid Schedule.xlsx XLSX spreadsheet
Attachment 11 - Davis-Bacon Act WD MA20230001.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Changes – W911QY-23-R-1021 Amendment 1

1) TE-01 – Design Requirements Updated

a. Section 1.3.9.11 added building 65

b. Sections 1.3.6.4.15, 1.3.2.2, and 1.3.2.4 changed to reference TE-08 Design After Award

c. Table 1.3.9-1 Notes added building 65

2) TE-08 Design After Award Added

a. This document has been added to the Solicitation, and can be found under W911QY-23-R-1021, 1442 Solicitation Document.

3) Contractor Q&A Added

a. Answers from pre-Solicitation Notice and post-Site-Visit have been provided via Q&A Excel Document (see “20230809 – FA Transmission Bidder Q’s.xlsx”).

4) Appendix B, NSSC FACP Locations Drawing Updated

a. Appendix B has been updated to include building 65.

5) External attachments 10, 11, and 12 have been renamed 11, 12, and 13 to allow for inclusion of TE-08.

Summary of Changes – W911QY-23-R-1021 Amendment 2

1) The Requirement at 3.5.3 of TE-08 for “Life Safety Plans” has been removed from this requirement, and is no longer applicable.

2) Combined copy of Q&A for Amendment 1 and 2 added (see “QA Amendments 1 and 2 – combined.xlsx”).

Summary of Changes – W911QY-23-R-1021 Amendment 3

1) Combined copy of Q&A for Amendment 1, 2 and 3 added (see “QA Amendments 1 2 and 3 – combined.xlsx”).

Summary of Changes – W911QY-23-R-1021 Amendment 4

1) The proposal due-date has been extended to 7 September 2023.

Summary of Changes – W911QY-23-R-1021 Amendment 5

1) The proposal due-date has been extended to 25 September 2023.

File details come from the government source that posted it. Updated .