This submittal register outlines the required submittals for a design-build project to install a base-wide wireless fire alarm transmission system at the Natick Soldiers Center in Natick, Massachusetts. Key submittals include a two-week schedule of work activities, an accident prevention plan, daily reports, product information and samples for materials like metal studs, insulation, doors, flooring, and HVAC systems. The register also requires submittals for contractor-designed drawings and reports for fire suppression, plumbing, electrical, communications, and electronic security and safety systems. The related federal contract opportunity is solicitation number W911QY-23-R-1021 issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground for a base-wide fire alarm transmission system.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit TE-02
DIRECTORATE OF PUBLIC WORKS
DIRECTORATE OF PUBLIC WORKS
DESIGN-BUILD CONSTRUCTION AND INSTALLATION
BASE WIDE WIRELESS FIRE ALARM TRANSMISSION SYSTEMNATICK SOLDIERS CENTER
10 GENERAL GREENE AVENUE
NATICK MA 01760
SUBMITTAL REGISTER
Division 01 — General Requirements
• Two-Week Schedule of work activities
• Submittal Register
• Accident Prevention Plan (APP)
• Daily Reports
• Qualification Records
• Closeout Submittals o Indoor Air Quality o Commissioning: HVAC, Fire Protection, Electrical, Steam and Chilled Water
Commissioning Plan Commissioning Reports
• Waste Management Plan
• Operation and Maintenance (O&M) o O&M Manuals o O&M Training
Division 02 — Existing Conditions
• Demolition Plan
Division 03 — Concrete
• Reinforcement o Product information
• Concrete mix information
Division 04 — Masonry
Division 05 — Metals
• Cold-Formed Metal Framing / Metal Studs o Product information
Division 06 — Wood, Plastics, and Composites
Division 07 — Thermal and Moisture Protection
• Rock wool insulation o Product information
• Pipe Boots o Product information
Division 08 — Openings
• Doors o Product information o Product sample
DIRECTORATE OF PUBLIC WORKS
DESIGN-BUILD CONSTRUCTION AND INSTALLATION
BASE WIDE WIRELESS FIRE ALARM TRANSMISSION SYSTEMNATICK SOLDIERS CENTER
• Door Hardware o Product information o Hardware schedule
Division 09 — Finishes
• Interior Gypsum Board o Product Information
• Water Resistant Tile Backer Board o Product information
• Fire Rated Gypsum Board o Product Information
• Joint tape and Compound o Product Information
• Acoustical Ceilings o Product information o Product samples
• Fluid Applied Epoxy Flooring o Product information
• Paints o Product information o Paint drawdown samples
• Tile and Grout o Product information o Product samples
• Resilient Flooring o Product information o Product samples
• Carpet o Product information o Product samples
Division 10 — Specialties
Division 11 — Equipment
• Contractor Design / Build o Drawing submittal for record
Division 12 — Furnishings
Division13 — Special Construction
Division 14 — Conveying Equipment
Division 21 — Fire Suppression
DIRECTORATE OF PUBLIC WORKS
DESIGN-BUILD CONSTRUCTION AND INSTALLATION
BASE WIDE WIRELESS FIRE ALARM TRANSMISSION SYSTEMNATICK SOLDIERS CENTER
• Contractor Design / Build o Drawing submittal for record
Division 22 — Plumbing
Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)
• HVAC systems o Product information
Division 25 — Integrated Automation
Division 26 — Electrical
• Electrical systems o Product information
Division 27 — Communications
Division 28 — Electronic Safety and Security
*This checklist is provided for the Contractor’s convenience. Contractor shall provide submittals as required by the documents and to execute the design intent of the drawings.
| SUBMITTAL REGISTER |
| *This checklist is provided for the Contractor’s convenience. Contractor shall provide submittals as required by the documents and to execute the design intent of the drawings. |
File details come from the government source that posted it. Updated .