This document provides a specification conversion table and deviation package for parachute contracts. It lists Parachute Industry Association textile and hardware specifications that replace various military standards and specifications referenced in technical data packages for parachutes and other aerial delivery equipment for the U.S. Army. The document also provides information on deviations from specifications for items like webbing, thread, cloth, parachutes, and fasteners. It outlines requirements for items like color, thread type, cloth weight, and defines terms. Additionally, it includes tables listing defects for items like parachute canopies, packs, harnesses, and pilot chutes to define acceptable quality levels.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04 November 2019 supersedes all previous revisions
SPECIFICATION CONVERSION TABLE AND DEVIATION PACKAGE
This package contains the Specification Conversion Table and active deviations applicable to US Army Airdrop. Not all deviations provided in this package will apply to this contract. A deviation shall only apply if its specification is identified in the associated Technical Data Package (TDP) or contract. Any questions regarding applicability to this contract shall be addressed to the Contracting Officer.
Table of Contents:
TITLE
DATE
ATTACHMENT#
Specification Conversion Table
Engineering Support Changes to A-A-59467, Webbing, Textile, Woven, Polypropylene
Deviation List for A-A-59826A dated 05 May 2016 Commercial Item Description, Thread, Nylon
Deviation List for Detail Specification MIL-DTL-32439 Cloth, Duck, Textured Nylon
Deviation to MIL-DTL-6645J Parachutes, Personnel, General Specifications for
Deviation List for Detail Specification MIL-DTL-7567C Parachutes, Personnel, Detail Manufacturing Instructions for
Deviation List for Detail Specification MIL-DTL-7620 Parachutes and Components, Cargo, Extraction and Deceleration, General Specification for
Deviation for MIL-DTL-10884H, Detail Specification Fasteners, Snap
Deviation List for Military Specification MIL-DTL-32075
Deviation List for Detail Specification MIL-DTL-44036
Deviation List for MIL-STD-849C Inspection Requirements, Definitions and Classifications of Defects for Parachutes
Alternative Mildew Treatment for Copper-8-Quinolinolate
Color Shade Matching Requirements for Parachute Canopies, Personnel and Cargo
Deviation for ASTM D6193 Standard Practice for Stitches and Seams
Deviation List for PIA-W-27265 Webbing, Textile, Woven Nylon Impregnated
Deviation List for PIA-W-4088 Webbing, Textile, Woven Nylon
Deviation List for PIA-W-1101 Webbing, Textile Polyester Tube Edge
16 December 2009
26 January 2017
02 February 2017
06 July 2018
28 October 2019
10 September 2015
31 December 2012
04 January 2008
13 March 2008
31 January 2002
6 September 2011
15 May 2013
16 December 2015
13 January 2017
10 May 2017 all previous revisions
Attachment 1
SPECIFICATION CONVERSION TABLE
1. The following is a list of Parachute Industry Association (PIA) textile specifications which are to be used to replace MILITARY STANDARDS/SPECIFICATIONS called out in the Technical Data Package (TDP) for parachutes and other aerial delivery equipment for the U.S. Army. Future revisions of the TDP may or may not reference PIA specifications. Only those PIA specifications listed below are authorized for direct replacements in contracts for parachutes and other aerial delivery equipment for the U.S. Army.
The most current revision level shall be used for the solicitation/contract unless stated in this document or amended by the Contracting Officer. PIA specifications are available at https://www.pia.com.
Textile specifications.
PIA-C-419B
PIA-C-2001A
PIA-C-2002A
PIA-C-2003A
PIA-C-3395D
PIA-C-3953F
PIA-C-5646D
PIA-C-7020E
PIA-C-7219C
PIA-C-7350D
PIA-C-44375C
PIA-T-43618C
PIA-C-43805C
PIA-C-44378E
PIA-T-1001A*
PIA-T-5038G
PIA-T-5661D
PIA-T-6134C
PIA-T-87130C
PIA-W-530B
PIA-W-4088F
PIA-W-5625F
PIA-W-5664C
PIA-W-5665D
PIA-W-17337B
PIA-W-27265D
PIA-W-27657C
PIA-C-2754D
PIA-C-5040F
PIA-C-5651C
PIA-C-7515F
Replaces
CCC-C-419
MIL-C-10296
CCC-C-419, CCC-D-950, NPS001
CCC-C-430
MIL-C-3395
MIL-C-3953
MIL-C-5646
MIL-C-7020
MIL-C-7219
MIL-C-7350
MIL-C-44375
MIL-T-43618
MIL-C-43805 and A-A-55183
MIL-C-44378
MIL-T-6134, Type I only
MIL-PRF-5038
MIL-T-5661
MIL-T-6134, all types except Type I
MIL-T-87130
MIL-W-530
MIL-W-4088
MIL-W-5625
MIL-W-5664
MIL-W-5665
MIL-W-17337
MIL-W-27265
MIL-W-27657 and AMS 3718 T-C-2754
MIL-C-5040
MIL-C-5651
MIL-C-7515
*PIA-T-1001 replaces only Type I of MIL-T-6134.
https://www.pia.com/
SPECIFICATION CONVERSION TABLE (continued) 04 November 2019
1.A The following is a list of PIA textile specifications used in TDPs which do not replace military specifications. The most current revision level shall be used for the solicitation/contract unless stated in this document or amended by the Contracting Officer. PIA specifications are available at https://www.pia.com.
PIA-W-1002C
PIA-W-1100B*
PIA-W-1101
*PIA-W-1100 replaces PIA-W-1003, -1004, -1005 and -1006.
2. The following is a list of PIA textile specifications which may be used as direct replacements for MILITARY STANDARDS/SPECIFICATIONS. Future revisions of the TDP may or may not reference PIA specifications. The most current revision level shall be used for the solicitation/contract unless stated in this document or amended by the Contracting Officer. The following specifications are available at https://www.pia.com and https://assist.dla.mil.
Textile specifications.
PIA-T-5666D Replaces MIL-T-5666 and A-A-55208
PIA-W-25361C
PIA-W-43668D
MIL-W-25361 and A-A-55242 MIL-W-43668 and A-A-55301
3. The following is a list of PIA hardware specifications which are to be used to replace MILITARY STANDARDS/SPECIFICATIONS. Future revisions of the TDP may or may not reference PIA specifications.
The most current revision level shall be used for the solicitation/contract unless stated in this document or amended by the Contracting Officer. PIA specifications are available at https://www.pia.com.
Hardware standards.
PS22002D Replaces MS22002
PS22003C
" MS22003
PS22004C
" MS22004
PS22007D " MS22007
PS22010B " MS22010
PS22014D " MS22014
PS22017D " MS22017
PS22018C " MS22018
PS22019C " MS22019
PS22020D " MS22020
PS22021C " MS22021
PS22022C " MS22022
PS22040D " MS22040
PS22042D " MS22042
PS22043C " MS22043
PS22044C " MS22044
PS22045B " MS22045
PS22046C " MS22046
https://www.pia.com/ https://www.pia.com/ https://assist.dla.mil/
PS22047C " MS22047
PS24553C " MS24553
PS27756C " MS27756
PS27762D " MS27762
PS27763C " MS27763
PS27764C " MS27764
PS27765C " MS27765
PS27767C " MS27767
PS70085C " MS70085
PS70086C " MS70086
PS70087C " MS70087
PS70092 " MS70092
PS70099B " MS70099
PS70101D " MS70101
PS70102C " MS70102
PS70104C " MS70104
PS70105B " MS70105
PS70106C " MS70106
PS70107B " MS70107
PS70108C " MS70108
PS70113C " MS70113
PS70114C " MS70114
PS70115C " MS70115
PS70116C " MS70116
PS70118B
" MS70118
PS70120C " MS70120
PS70121G " PS70119, MS70119, MS70121
PS70123C " MS70123
PS70124D " MS70124
PS90295A " MS90295
PS90296A " MS90296
4. The following is a list of specifications which have been approved to replace canceled specifications.
Types, classes, etc. remain the same between the replacement and the canceled specification unless otherwise detailed within the specification. The most current revision level shall be used for the solicitation/contract unless stated in this document or amended by the Contracting Officer. The following specifications are available from: https://assist.dla.mil, https://www.aia-aerospace.org, https://www.astm.org, https://www.pia.com, and https://www.sae.org.
A-A-52080B A-A-52094B A-A-55126C A-A-59291A
Replaces
Cancels
MIL-T-43435
V-T-276
MIL-F-21840
MIL-I-6903
A-A-59826A A-A-59989
V-T-295
MIL-T-43624
https://assist.dla.mil/ https://www.aia-aerospace.org/ https://www.astm.org/ https://www.sae.org/
AIA/NAS NASM16491
ASTM D3990
ASTM D5486/D5486M*
ASTM D6193
MIL-DTL-32075
MIL-DTL-32439A
MIL-PRF-6855F
PIA-DTL-40137C
PIA-H-7195C
MIL-G-16491
FED-STD-4B
PPP-T-60
FED-STD-751
DDD-L-20
MIL-C-43734
MIL-R-6855, AMS-R-6855
MIL-DTL-40137
MIL-H-7195
AMS-STD-595A
FED-STD-595
*Direct replacement for Type IV only
5. The following is a list of various colors, types and classes called out in specifications which supersede the requirements as specified in the TDPs. The TDPs may have been updated to reflect the changes, thus there may be duplication between this document and TDP requirements. NOTE:
Personnel static lines manufactured IAW MIL-DTL-6645 are not included in this tabulation.
Materials as specified in the TDP for construction of the static lines must be used.
5.A Color.
When a shade of Olive Drab, Olive Green or Camouflage 483 is specified, use color Foliage Green 504 (FG 504).
When Woodland Camouflage pattern is specified, use the Operational Camouflage Pattern (OCP).
See AMS-STD-595A for further information on color chip, color selection, color matching and quality control inspection.
5.B Thread, nylon, A-A-59826.
The use of Types I or II and Class A are authorized for use. When Type I, II or III is called out, Types I or II are authorized for use. When Class B is called out, Class A is authorized for use.
5.C Tape and webbing, nylon, PIA-W-4088 and PIA-T-5038.
Except for PIA-T-5038 Type VII, the use of Class 2 is authorized. When a Class 1 or 1a is called out, Class 2 is authorized for use as an alternative. When Class 2 is called out, Class 1 or 1a is authorized for use as an alternative. For PIA-T-5038 Type VII, only Class 1 is authorized for use.
5.D Cloth, duck, nylon, PIA-C-3953.
Where “PIA-C-3953 Class 2 for parachute procurement only, 0.3–0.4 lbs warp/0.4–0.5 lbs filling”, is called out, “PIA-C-3953 Class 3” is authorized for use. Where “PIA-C-3953 Class 2 extra stiff, 0.45-0.65 lbs warp/0.65-0.85 lbs filling”, is called out, “PIA-C-3953 Class 2” is authorized for use, unless amended by the Contracting Officer.
5.E Cloth, duck, plied-yarns, dyed, army duck, PIA-C-2002.
Where PIA-C-2002, 8.25oz is called out, PIA-C-2002 Type I is authorized for use. Where PIA-C-2002, 12.29oz is called out, PIA-C-2002 Type II is authorized for use. Where PIA-C-2002, 8.25 or 12.29oz is called out, Type I or II is authorized for use, unless amended by the Contracting Officer.
5.F Webbing, textile, elastic, PIA-W-5664.
Where PIA-W-5664, Type I, Class 3, 1 ½ inch is called out, PIA-W-5664 Type I, Class 3, 1 ½ inch or Type I, Class 4, 1 ½ inch is authorized for use, unless amended by the Contracting Officer.
5.G MIL-DTL-32439 supersedes MIL-C-43734. The types and classes have been updated and are not the same between the two specifications. Where MIL-C-43734 Class 3 is called out, MIL-DTL-32439 Type I, Class 3, Style A is authorized for use. Supersession data can be found in MIL-DTL-32439 paragraph 6.6.
5.H Cloth, plain weave, nylon: water repellent treated and untreated, MIL-DTL-43128.
“Cloth, plain weave, nylon: water repellent, OG-106, MIL-C-43128” has been updated to “Cloth, plain weave, nylon: water repellent treated and untreated, MIL-DTL-43128”. Types and classes have been added to MIL-DTL-43128 which were not present in MIL-C-43128. Where MIL-C-43128 is called out, MIL- DTL-43128 Type II, Class 8 is authorized for use, except when used on T11R Ejector Spring Assy, PN 11-1- 7065. When used on T11R Ejector Spring Assy, PN 11-1-7065, MIL-DTL-43128 Type III, Class 8 is authorized for use. When MIL-C-43128 is called out to be untreated per Vendor Item Drawing 11-1-9288, MIL-DTL-43128 Type I, Class 8 is authorized for use.
6. The following is a list of all active deviations for specifications, drawings and requirements for use on contracts for parachutes and other aerial delivery equipment for the US Army.
Specification/Requirement Date A-A-59467 16 Dec 2009 A-A-59826A 26 Jan 2017
MIL-DTL-32439
MIL-DTL-6645J
02 Feb 2017 06 July 2018
MIL-DTL-7567C
MIL-DTL-7620
MIL-DTL-10884H
28 Oct 2019 10 Sept 2015 31 Dec 2012
MIL-DTL-32075
MIL-DTL-44036
MIL-STD-849C
PIA-W-1101
PIA-W-4088
PIA-W-27265
Alternative Mildew Treatment for Copper-8 Quinolinolate Color Shade Match Requirements
ASTM D6193
04 Jan 2008
04 Nov 2019 10 May 2017 13 Jan 2017 16 Dec 2015 31 Jan 2002 06 Sept 2011 15 May 2013
9. Bold print signifies updates to this document.
Engineering Support Changes to: A-A-59467, Webbing, Textile, Woven, Polypropylene
Attachment 2
Page 1, Paragraph 3.:
1 Delete sentence “The webbing shall be made with 100% Polypropylene yarn.” and
2 Replace with the following: “The webbing shall be made with 100% Polypropylene yarn and the yarn shall have an Ultraviolet Stabilization package.”
Page 2, Paragraph 3.3:
1 Under “Requirement” column for “Weight” delete “1.4 to 1.8 oz/ yd” and substitute “1.40 to
1.95 oz/yd”.
2 Under “Requirement” column for “Elongation”, delete “11% to 15%” and substitute “10%
(min)”.
3 Under “Requirement” column for “Elongation”, delete “(At the break) and substitute (At 3500 lbs) .
4 Under “Requirement” column for “Tensile Strength after Abrasion” delete “80%” and substitute “50%”.
5 Under “Test Method” column for “Tensile Strength” delete “ASTM-D-5035” and substitute
“PIA STD 4108”.
6 Under “Test Method” column for “Elongation” delete “ASTM-D-5035” and substitute “PIA
STD 4108”.
7 Under “Requirements” column delete “1200 hours (min.)”. Under “Test Method” column for “Ultra-Violet Protection” delete “ASTM-D-3218 5/” add footnote “6/”.
8 under “Characteristic” and “Requirement” column delete “Abrasion” and delete “see para 3.5” .Under “Test Method” column for “Abrasion” delete “5309 6/”.
9 under “Test Method” column for “Tensile Strength after Abrasion” delete
“ASTM-D-5035” and add “ASTM-D-6770 5/ and PIA STD 4108”.
10 Footnote 4/ remove “ASTM-D-5035, Breaking Force and Elongation of Textile Fabrics (strip method)” and substitute “PIA STD 4108, Strength and Elongation, Breaking; Textile Webbing, Tape and Braided Items”.
11 Delete footnote “5/ ASTM-D-3218, Standard Specifications for Polyolefin monofilaments.”
12 Change “footnote 6/ to footnote 5/”.
13 Footnote 5/ remove “FED-STD 191, Federal Standard for Textile Test Methods- Standard
Test Method 5309, Abrasion Resistance of Textile Webbing” and substitute “ASTM-D-6770, Standard Test Method for Abrasion Resistance of Textile Webbing (Hex Bar Method).”
14 Add footnote “6/ A certificate of compliance shall be submitted and will be acceptable noting the percentage of Ultraviolet Stabilization package used in the final product.”
Engineering Support Changes to: A-A-59467, Webbing, Textile, Woven, Polypropylene
Attachment 2
Page 2, paragraph 3.4:
1. delete the following “The color shall be white or as specified in the contract or purchase order.”
and add “The color shall be white or natural or as specified in the contract or purchase order.”
1. add paragraph “5.4 End item performance testing. The webbing shall be tested for the characteristics listed in paragraph 3.3. The lot size shall be expressed in units of 1 linear yard.
The sample units shall be 20 yards of webbing. The lot shall be unacceptable if one or more sample unit fails to meet any requirement specified. The sample size shall be as follows: Lot size (yards) Sample size (sample units) 800 or less 2 801 up to and including 22,000 3 22,001 and over 5
Page 3, paragraph 7.2 :
1. add “Parachute Industry Association Standard (PIA STD) (Referenced documents can be obtained through the PIA website at www.pia.com) .
26 January 2017 Supersedes 29 October 2010
Deviation List For A-A-59826A dated 05 May 2016 Commercial Item Description, Thread, Nylon
Attachment 3
Page 2, para 3.1 – Add the following to the end of the paragraph, “For multi-needle 301 stitch operations, Type I thread with a final twist of “S” may be used in the left (outer) needle(s) only.”
Page 5, TABLE II: Change NOTE 6/ to read as follows, “Except that five (5) determinations shall be made per sample unit, shall be reported on the test report, and shall be at or above the minimum requirement for breaking strength.”
02 February 2017
25 March 2016
Deviation List for Detail Specification MIL-DTL-32439 Cloth, Duck, Textured Nylon
Attachment 5
Page 16, para 3.9.4 Change from “…no wetting by N-Tetradecane initially and after 1-laundering.” to “…no wetting by N- Tetradecane initially.”
Page 21, TABLE XI End Item Tests The following tests are not required
Colorfastness to Perspiration (Acid & Alkaline)
Resistance to Diethyltoluamide (DEET)
Spectral reflectance
Toxicity
16 December 2015 Deviations to MIL-DTL-6645J
Detail Specification Parachutes Personnel, General Specification for
Attachment 6
Note: This deviation has been reorganized so that changes are listed by paragraph number in the order that they appear in MIL-DTL-6645. Bold print indicates changes from the previous deviation.
Paragraph 3.2.3 Qualification inspection samples, modify to read as follows:
The qualification inspection sample shall comply with all of the requirements specified herein and shall consist of two complete parachute 1/ assemblies or components (if qualification is desired for a component only). The qualification sample shall be accompanied by the following items with affidavits of the source of supply (supplier test reports and certifications) of each item: 5 yards of each color and type of broad cloth; ½ pound spool, cone, or tube of each color and type of thread; 30 yards of each color and type of cord, webbing and tape; 2 pieces of each type of hardware, and 2 of any miscellaneous item such as stiffeners, zippers, etc., used in the construction of the parachute assembly and components. The samples and all associated documentation shall be taken from the same supplier lots used to manufacture the qualification inspection sample. The samples shall comply in all respects with the requirements specified herein. Samples shall be forwarded as directed by the activity responsible for qualification.
1/ At their option, a qualifying activity might only request one parachute assembly.
Paragraph 3.3.2.1 Date of manufacture, textile, modify to read as follows:
The date of manufacture is defined as the last date which the textile materials have undergone a manufacturing operation that affects the physical characteristics of the material. Operations such as cutting, put-up, final inspection and packaging are examples of manufacturing operations that do not affect the physical characteristics of the material. To properly identify the age of textile materials for government use, the textile manufacturer shall place a tag on the finished goods identifying the specification to which the material is manufactured, the roll number from the lot, the lot number, and the date of manufacture.
Paragraph 3.4.1 Assembly aids, modify to read as follows:
Drilling, notches, stapling, gluing, basting or any other such techniques used as aids in the manufacturing process of parachutes shall be kept to a minimum, and the use thereof shall be restricted to the same limitations as marking (see 3.4.2). All assembly aids, such as staples, shall be removed during or after assembly. For Navy and Air Force procurements, hot glues are not authorized as an assembly aid. For Army procurements, use of assembly aids is prohibited in all types of harnesses, risers or static lines unless Government approval is requested and
16 December 2015 obtained as part of First article component or material submission, on a contract by contract basis.
Paragraph 3.4.1.1 Basting, modify to read as follows:
Basting requirements shall be as specified in the TDP for the associated item or be in accordance with common industry practices. Basting stitches shall not be seen in the finished seam or assembly. Contractors unfamiliar with commercial practices shall contact the contracting officer for specific details prior to assembly of the item.
Add Paragraph 3.4.1.2 Hot glue, as follows:
Use of hot glue as an assembly aid is restricted to only webbings, tapes or similar narrow fabrics. Use of hot glue is prohibited on cloth unless Government approval is requested and obtained as part of First article component or material submission, on a contract by contract basis. When hot glue is used as a preassembly aid, a minimal quantity should be used to prevent unnecessary stiffening of the assembly. Excess glue visible in the folds or layers of the material is not permitted.
Add Paragraph 3.4.1.3 Staples, as follows:
When staples are used as an assembly aid, a minimal quantity shall be used. Care shall be taken in choice of staple and application method to reduce the potential of damage to the material.
Paragraph 3.4.2 Assembly markings, modify to read as follows:
Markings of pack, canopy, harness, riser, and other components as an aid to assembly, and to indicate stitch patterns, shall be accomplished in a manner that will not adversely affect the utility, strength, or appearance of the equipment.
Paragraph 3.5.1.1 Suspension lines, modify to read as follows:
Suspension lines shall be continuous and without splices or knots for each length specified by the
TDP for the associated item. All lines from one canopy shall be made from the same manufacturer’s lot of cord with the exception of suspension lines fabricated with Spectra® cord.
Where Spectra® cord is used for suspension lines, all lines from one canopy shall be made from
16 December 2015 cord supplied by the same manufacturer. Any line damaged during the process of canopy manufacture, regardless of fiber, shall be replaced with lines fabricated from cord of the same manufacturer. When multiple pulley systems is used for tensioning, all lines for an entire canopy shall be measured at the same time and shall not be anchored at any intermediate point between the lines.
Paragraph 3.5.1.1.1 Tensioning of suspension cord line, add the following to the list:
Line Conforming To Tension
Nylon Cord PIA-C-5040, Type II 14 ± ½ pound
Paragraph 3.5.1.2 Air permeability, add the following to the end of paragraph:
For the T-11 only: The average air permeability reading for any center panel or arm shall not exceed the upper limit nor be less than the lower limit of the fabric specification by over 20 percent.”
For the RA-1 only: The air permeability limits in cfm for main and reserve canopies only (pilot chutes shall follow the original air permeability requirements of 3.5.1.2 and are not included in the following table) shall be as follows:
Canopy Avg Top Skin Avg Bottom Skin Avg Individual Cell
Avg
RA-1 Main Canopy n/a 0.0 5.5 6.0
RA-1 Reserve Canopy 5.5 n/a n/a 6.0
Paragraph 3.6.4 Identification marking, modify to read as follows:
Each round canopy shall be marked for identification in accordance with figure 1, unless otherwise stated in the TDP for the associated item. The characters shall not be less than ½ inch high. The type designation, if applicable and as specified in the TDP for the associated item, shall precede the drawing number. The using service will insert the date the canopy is placed in service. The format of the date of manufacture shall be as follows: a text month followed by a four digit year (example: JUNE 2006) or a two digit month followed by a two or four digit year
(example: 06/06 or 06/2006).
16 December 2015
Paragraph 4.4.1 Component and material inspection, modify to read as follows:
Components, materials, test reports and certifications shall be inspected in accordance with all of the requirements of referenced documents and specifications unless otherwise excluded, amended, modified, or qualified in this specification or applicable purchase document.
Materials, test reports and certifications shall be taken from the same supplier lots used to manufacture the associated components.
Paragraph 4.7.1 Air permeability, round, modify to read as follows:
The cloth of completed parachute canopy assemblies shall be tested for air permeability to determine compliance with the requirements of 3.5.1.2. The test shall be performed in accordance with ASTM D737, making five permeability readings (a minimum of one reading per section excluding the top) in every fourth gore starting with gore number 1; that is, gore numbers
1, 5, 9, etc. Each reading shall be taken at the approximate center, horizontally and vertically, of the gore section. The pilot chutes procured as separate items or as part of the parachute canopies or assemblies shall be subject to this permeability testing requirement, except that the number and locations of the readings shall be as specified by the procuring activity.
Paragraph 4.7.1 Air permeability round, modify as follows for MC-6, SF-10A canopies:
The cloth of the completed parachute canopy assemblies shall be tested for air permeability to determine compliance with the requirements of 3.5.1.2. The test shall be performed in accordance with ASTM D737 making five permeability readings (a minimum of one reading per section excluding the top) in every fourth gore starting with gore number 1; that is, gore numbers 1, 5, 9, etc. Each reading shall be taken at the approximate center, horizontally and vertically, of the gore section. When the required gore to be tested is a “blank” gore, both the “blank” gore and the “extended” gore shall be tested. In this case, a total of eight air permeability readings shall be made: 1 on the blank gore (panel A per TDP) and 7 on the extended gore that passes over it
(panels E, F, G, H, I, J and K per TDP). The pilot chutes procured as separate items or as part of the parachute, canopies or assemblies shall be subject to this permeability testing requirement, except that the number and locations of the readings shall be as specified by the procuring activity.
Paragraph 4.7.1.1 Air permeability, gliding, modify as follows for RA-1 Main and Reserve canopies:
16 December 2015
The cloth of completed Main and Reserve RA-1 canopy assemblies shall be tested for the air permeability requirements of 3.5.1.2. The test shall be performed in accordance with ASTM
D737. On the top and bottom skin of the main canopies, readings shall be taken at the marked locations with the permeometer orifice aligned with the tip of the “V” mark. On the top skin of the reserve canopy, readings shall be taken on panels 1, 2, 5, 6, 9, 10, 13, 14, 17 and 18, centered on the width of the panel, 22 inches from the leading edge of the canopy. On the bottom skin of the reserve canopy, readings shall be taken on each half cell of panels 1, 3, 7 and 9 (excluding those half cells with a vent), with the permeometer orifice centered on the width of each half cell, and centered between the leading edge and the “B” tape. See FIGURE 4 for RA-1 Main Canopy air permeability schematic and FIGURE 5 for RA-1 Reserve Canopy air permeability schematic.
The pilot chutes and drogues procured as separate items or as part of the parachute canopies or assemblies shall be tested to the air permeability requirements of 3.5.1.2, except that the number and locations of the readings shall be as specified by the procuring activity.
Paragraph 4.7.1.1 Air permeability, gliding, modify as follows for MC-4 canopies:
The cloth of completed parachute canopy assemblies shall be tested for air permeability to determine compliance with the requirements of 3.5.1.2. The test shall be performed in accordance with ASTM D737. Air Permeability readings shall be taken on the top and bottom panels of each ½ cell, 18 inches from the leading edge, and centered between the ribs (see figure
2). A total of two readings per cell, per each top and bottom leading edge panel, shall be taken for a total of 28 readings per canopy.
Add the following new paragraphs:
4.7.1.2 Air permeability, T-11.
The cloth of completed T-11 canopy assemblies shall be tested for air permeability requirements of 3.5.1.2. The test shall be performed in accordance with ASTM D737. Forty (40) Air permeability readings shall be taken in the locations referenced in Figure 3 below. Each reading shall be taken at the approximate center, horizontally and vertically, of each section. The average of the canopy and center panel/arms shall meet requirements identified in 3.5.1.2.
4.7.1.2.1 T-11 sampling, center section: four (4) readings shall be taken from each of the 7 continuous panels in the center section as directed in Figure 3 below. Continuous panels run along the direction of a main seam. The 4 readings from one continuous center panel shall be averaged together and reported. There are a total of 7 center panels and the average of each center panel shall be within the acceptable range stated in pgh 3.5.1.2.
16 December 2015
4.7.1.2.2 T-11 sampling, arms: 3 readings shall be taken from each arm, using Figure 3 as a reference. One reading shall be taken from each continuous panel in the arm, at any section location. The 3 readings shall be averaged together and reported. There are a total of 4 arms and the average for each arm shall be within the acceptable range stated in pgh 3.5.1.2.
FIGURE 3. Reference schematic for T11 air permeability sampling NOTE: Taken from drawing 11-1-7104.
It is important to note that in the center section, the test locations and averages are tied to the direction of the continuous panels. Test locations in the arms can be at any section in the continuous panel.
Section
Center panel average:
readings from 1 continuous panel along a main seam
Arm average:
readings from 3 different panels within 1 arm
Direction of center section main seam
16 December 2015
FIGURE 4. Reference schematic for RA-1 Main Canopy air permeability sampling
NOTE: Air permeability locations are marked with a “V” symbol on top skin panels 1, 2, 9, 10, 17, and
18; bottom skin panels are marked on both half cells of panels 1, 5 and 9. Align permeometer orifice with the tip of the “V” as shown above.
16 December 2015
FIGURE 5. Reference schematic for RA-1 Reserve Canopy air permeability sampling
NOTE: Air permeability locations are not marked on the reserve. On the top skin of the reserve canopy, readings shall be taken on panels 1, 2, 5, 6, 9, 10, 13, 14, 17 and 18, centered on the width of the panel, 22 inches from the leading edge of the canopy. On the bottom skin of the reserve canopy, readings shall be taken on each half cell of panels 1, 3, 7 and 9 (excluding those half cells with a vent), with the permeometer orifice centered on the width of each half cell, and centered between the leading edge and the “B” tape.
15 September 2011
Deviation List for Detail Specification MIL-DTL-7567C Parachutes, Personnel, Detail Manufacturing Instructions For
Attachment 7
Paragraph 3.4.1.1 Canopy damage during construction. Add the following sentence at the end of the paragraph:
“… Darns are not allowed on T11-R Parachute Assemblies.”
Paragraph 3.4.5.10, Section E.
Change from:
e. Four-needle repairs shall be a minimum of 36 inches apart per seam. Not more than 2 such defects and 14 per canopy shall be permitted.
To:
e.i Four-needle repairs shall be a minimum of 36 inches apart per seam. Not more than 2 such defects per seam and 14 per canopy shall be permitted.
e.ii Repairs on SF-10A and T-11R shall be a minimum of 36 inches apart per seam. Not more than 2 such defects are allowed per main seam. The number of main seams repaired shall not be more than half the number of main seams on the canopy.
e.iii Repairs on T-11 Main shall be a minimum of 36 inches apart per seam. Not more than 3 such defects are allowed per seam.
Paragraph 3.6, change to read as follows:
3.6 Harnesses, risers, static lines, bridle lines, straps, lanyards, and pockets.
a. Stitching shall lie smoothly on the webbing or tape without looping. The tension of the needle and bobbin thread shall be equal. The thread lock shall be embedded in the webbing or tape.
b. The complete removal and replacement of 3 or 4 point stitch patterns shall not be conducted without the ESA oversight.
c. Broken stitches shall be reinforced by overlapping the stitching 4 stitches on either end of the break.
Three reinforcements are allowed in the harness assembly, with no more than 1 reinforcement per stitch formation.
15 September 2011
Detail Specification MIL-DTL-7567C Parachutes, Personnel, Detail Manufacturing Instructions For
Attachment 7
d. One skipped or missing stitch per stitch pattern will be acceptable on the harness, with a total of 3 skipped or missing stitches allowed per harness. In addition, 2 skipped or missing stitches will be acceptable in the zigzag stitching on the saddle assembly. Two consecutive skipped or missing stitches shall not be allowed.
e. A maximum of 3 loops in the harness stitching will be acceptable. No loop shall be in excess of 3/32 inch high or 1 stitch in length. Loops must be a minimum of 2 inches apart.
f. A maximum of 3 fill yarns on the harness, damaged during stitching (needle damage) will be acceptable. Damaged yarns must not exceed 1/8 inch width and 3/8 inch in length.
g. Broken stitches, skipped stitches, missing stitches, loops, stitching repairs, and needle damage are not permitted in the 3 or 4 point stitching on static and bridle lines, and are not permitted on the risers, except that 1 skipped or missing stitch and 1 stitch repair will be permitted in the riser spreader bar.
h. Darns are not allowed on load bearing harnesses, risers, static lines, bridle lines, straps, lanyards and pockets, with the exception of the vest panels on Restraint Harness panels.
supercedes 03 March 2015
Deviation List for
MIL-DTL-7620
Detail Specification, Parachutes and Components, Cargo, Extraction and Deceleration, General Specification for
Attachment 8
Page 4, 3.3.5 Stitches and stitching, add the following sub-paragraphs for JPADS systems:
3.3.5.4 Backstitching. Backstitch requirements are specified on the detail drawings. Backstitching is not required if not specified on the drawing. Backstitches formed with type 301 straight stitch shall be sewn as indicated in Figure 2. For type 308 zigzag stitch, either Single Leg Backstitch (Figure 1), Backstitch (Figure 2) or crowd stitching may be utilized.
Figure 1 Single Leg Backstitch
Section View
Figure 2 Backstitch
Section View
Page 6, 3.4 Air Permeability, add the following sub-paragraphs:
3.4.1 JPADS 2K. Complete JPADS 2K canopies, when testing in accordance with 4.5, shall have an average permeability of not more than 6.0 cfm, where no single measurement is greater than 7.2 cfm.
3.4.2 JPADS 10K. Complete JPADS 10K canopies, when tested in accordance with 4.5, shall have an average permeability of not more than 12.0 cfm.
03 March 2015
Deviation List for
MIL-DTL-7620
Detail Specification, Parachutes and Components, Cargo, Extraction and Deceleration, General Specification for
Attachment 8
Page 8, 4.5.1 Air permeability, change the paragraph to read as follows:
4.5.1 Air Permeability. The number of completed canopies specified in Table I shall be selected at random from production and tested for air permeability to determine compliance with the requirements of 3.4. The test shall be performed in accordance with ASTM D737.
4.5.1.1 Round canopies. The number of permeability readings made from round canopies constructed from one fabric shall be five in every fourth gore, excluding top and bottom sections. The number of permeability readings made from round canopies constructed from more than one fabric shall be three in the bottom section, two in the second section and three in the third section in every fourth gore. The permeability readings of each fabric shall be averaged.
4.5.1.2 JPADS 2K canopies. Permeability readings shall be taken on the top and bottom surfaces of the canopies, prior to line installation. On the top surface permeability readings shall be taken 36 inches down from the leading edge, in the center of the cell, on cells 1, 2, 9, 10, 11, 18 and 19. On the bottom surface permeability readings shall be taken midway between the leading edge and the B cross-tape, in the center of the cell, on cells 1, 2, 9, 10, 11, 18 and 19.
4.5.1.3 JPADS 10K canopies. Permeability readings shall be taken on the top and bottom surfaces of the canopy, prior to line installation. On the trailing edge panel of the top surface, permeability readings shall be taken 12 inches back from the top cross seam, in the center of the cell, on cells 1, 18, and 35.
On the bottom surface, permeability readings shall be taken 12 inches down from the leading edge in the center of the cell, on cells 1, 18, and 35.
31 December 2012
Attachment 9
Deviation for
MIL-DTL-10884H Detail Specification Fasteners, Snap
The following deviation to the MIL Detail Specification is for the materials specified herein. For
NASM27980 and NASM27983, parts MS27980-6B and MS27983-2:
Page 4, paragraph 3.1.3:
Phosphor Bronze Spring Wire. Replace “copper alloy 510 or ASTM B134” with “copper alloy
510 per ASTM B159”.
4 January 2008
4 December 2006
Military Specification MIL-DTL-32075
Attachment 10
Page 6: Paragraph 3.2.4.1, delete and replace with: The basic cloth will be a nonwoven material of either spunbonded polyester made from 4.0 denier (44 Tex) continuous filament white polyester fiber, 80/20 polyester cellulose or 70/30 polyester cellulose material. The cloth fibers will be randomly dispersed and bonded at filament junctions. The overall weight of the basic cloth will not be more than 2.2 ounces per square yard when tested as specified in 4.2.3.
Page 6: Paragraph 3.2.4.2., delete first sentence and replace with “The impregnation coating will be a pigmented polyurethane, acrylic, nitrocellulose coating composed of white pigments such as clay, chalk, titanium dioxide, or blane fixe, and affixed by an appropriate polyurethane, acrylic or nitrocellulose resin when tested as specified in 4.2.3.”
Page 6: Table I, under Tearing strength, delete “lb.”, and substitute “grams”.
Page 6: Paragraph 3.2.4.1, line 2, delete “44 Tex”, and substitute “.44 Tex”.
Page 10: Paragraph 3.3.2.10, line 6, under “Service No.” delete “(approximately 1/8 inch)” and substitute “approximately 1 inch”.
for
Detail Specification MIL-DTL-44036
Attachment 11
Page 3, pgh. 4.3 Conformance inspection. In the first sentence, delete reference to pgh
“4.5” and replace with “4.4”.
03 February 2017
Deviation List for
MIL-STD-849C
Inspection Requirements, Definitions and Classification of Defects for Parachutes
Attachment 12 Page 1 of
Replace “MIL-STD-849B” on the header of each page with “MIL-STD-849C”
Page iii: Delete CONTENTS list and replace with the following CONTENTS list (dated 06 Jan 2017)
Page 17: Delete TABLE I and replace with the following TABLE I document (dated 10 Sept 2015) Page 18: Delete TABLE II and replace with the following TABLE II document (dated 11 Feb 2015) Page 19-28: Delete TABLE III and replace with the following TABLE III document (dated 10 June 2010) Page 40-42: Delete TABLE VI and replace with the following TABLE VI document (dated 13 Sept 2011) Page 43-44: Delete TABLE VII and replace with the following TABLE VII document (dated 10 Sept 2015) Page 58-59: Delete TABLE XII and replace with the following TABLE XII document (dated 18 Sept 2014) Page 63-64: Delete TABLE XIV and replace with the following TABLE XIV document (dated 21 Aug 2014)
Delete the following TABLES from MIL-STD-849C:
TABLE XVI. Classification of defects – low cost aerial delivery system (LCADS): High Velocity (HV), Spider TABLE XVII. Classification of defects – low cost aerial delivery system (LCADS): Low Velocity (LV) BAT Parachute TABLE XVIII. Classification of defects – low cost low altitude aerial delivery system (LCLA): Stalker, Cross
Parachute System Assembly TABLE XIX. Classification of defects – Low Cost Container (LCC)
Add the following TABLES to MIL-STD-849C:
TABLE XVI. Classification of defects – cross-cruciform parachute canopies with slider – Personnel
(dated 14 June 2010)
TABLE XVII. Classification of defects – deployment sleeve – Personnel (dated 03 Feb 2017) TABLE XVIII. Classification of defects – canopies: square, gliding type – main and reserve, RA-1 only
(dated 26 Jan 2017)
TABLE XIX. Classification of defects – integrated pack and container (exclusive of harness), deployment bag and pocket, RA-1 only (dated 18 Sept 2014)
TABLE XX. Classification of defects – canopies: square, gliding type, joint precision airdrop systems, 2K (dated 06 Jan 2017)
TABLE XXI. Classification of defects – harness: joint precision airdrop system, 2K (dated 06 Jan 2017) TABLE XXII. Classification of defects – soft link: joint precision airdrop system, 2K (dated 06 Jan 2017)
TABLE XXIII. Classification of defects – ram-air cargo parachute system, one time use (dated 04 Aug 2016)
All Tables:
Change “Incorrect or defective material - Major” to “Incorrect material or material with major defects – Major” Add “Any dimension out of tolerance per TDP unless otherwise specified in this table – MAJOR”
Table III: Add “Any darn on T-11R canopy – MAJOR” (added 04 Nov 2019)
Table VII: Add “Any darn or patch… - MAJOR” (added 04 Nov 2019)
Bold print signifies changes from the previous revision.
MIL-STD-849C
CONTENTS
TABLE PAGE
06 January 2017 iii Attachment 12
I Personnel parachutes – guideline for maximum allowable errors per canopy 17
II Cargo, deceleration, extraction, recovery, special weapon parachute systems and containers – guideline for maximum allowable errors per canopy
III Classification of defects – solid and extended skirt parachute canopies – personnel 19
IV Classification of defects – ring slot and ribbon parachute canopies 29
V Classification of defects – pilot chutes and drogues 35
VI Classification of defects – personnel parachute packs or containers, and deployment bags
VII Classification of defects – personnel parachute harnesses, risers, static lines, bridle lines, straps, lanyards, pockets, and cloth ripcord handles
VIII Classification of defects – deployment bags and packs (other than personnel) 43
IX Classification of defects – risers, static lines, bridles, straps, adapter webs, and retainers (other than personnel)
X Classification of defects – personnel parachute, integrated pack and harness 48
XI Classification of defects – canopies: square, gliding type – main and reserve 52
XII Classification of defects – pilot chutes for MC-4, MIRPS, and RA-1 and spring assembly, ejector only
XIII Classification of defects – integrated pack and container (without harness), deployment bag and pocket – MC-4 only
XIV Classification of defects – harness, riser, bridle line, strap, and lanyard – MC-4 and RA-1 only
XV Classification of defects – solid and extended skirt parachute canopies – cargo 65
XVI Classification of defects – cross-cruciform parachute canopies with slider – personnel 73
XVII Classification of defects – deployment sleeve – personnel 78
XVIII Classification of defects – canopies: square, gliding type – main and reserve, RA-1 only 80
XIX Classification of defects – integrated pack and container (exclusive of harness), deployment bag, and pocket, RA-1 only
XX Classification of defects – canopies: square, gliding type, joint precision airdrop systems, 2K
XXI Classification of defects – harness: joint precision airdrop system, 2K 90
XXII Classification of defects – soft link: joint precision airdrop system, 2K 92
XXIII Classification of defects – ram-air cargo parachute system, one time use 93
TABLE I. Personnel parachutes - guidleline for maximum allowable errors per canopy
No. Item Major Minor
1 Canopies (solid cloth, round, extended skirt)
Troop and rescue 0 8
Emergency 24 feet 0 5
Emergency 26 feet 0 6
Emergency 28 feet 0 6
2 Canopies (square, gliding type, main and reserve) 0 8
3 Canopies (cross-cruciform) 0 8
4 Pilot chute and drogue 0 3
5 Deployment bag, diaper, and sleeve 0 3
6 Pack/container
Troop and rescue (excluding static line) 0 4
Emergency (except chest style) 0 5
Chest style (including reserve) 0 3
Container (integrated main and reserve) without harness, 0 5
MC-4 and RA-1
Container (integrated main and reserve) with harness, MC-4 0 9
7 Integrated pack and harness 0 8
8 Harness 0 5
9 Risers 0 1
10 Static lines 0 2
11 Bridle lines, starps, lanyards, pockets, and cloth ripcord handles 0 2
12 Spring assembly, ejector 0 3
NOTE: In all of the following tables, references in the form to "up to" are inclusive.
Classification
10 September 2015 Attachment 12
TABLE II. Cargo, deceleration, extraction, recovery, and special weapon parachute systems and containers -guidleline for maximum allowable errors per canopy
No. Item Major Minor
1 Canopies (solid cloth, round, extended skirt)
Up to 25 feet in diameter 0 10
Over 25 feet in diameter 0 20
Over 50 feet in diameter 0 30
Over 75 feet in diameter 0 40
2 Canopies (ribbon and ring slot)
Up to 25 feet in diameter 0 10
Over 25 feet in diameter 0 20
3 Canopies (glide surface) 0 5
4 Canopies (JPADS 2K, 2K1T) 0 30
5 Drogue and pilot chute 0 3
6 Deployment bags and packs 0 10
7 Risers, static lines, bridles, straps, retainers and adaptor webs 0 5
8 Soft link 0 1
NOTE: In all of the following tables, references in the form to "up to" are inclusive.
Classification
11 February 2015
Page 4 of 51 Page 1
TABLE III. Classification of defects - solid and extended skirt parachute canopies - personnel.
10 June 2010 Page 1
No. Major Minor
1. Improper assembly of vent reinforcement band 101
2. Vent reinforcement band overlap Up to 1/4 inch minus 201 Over l/4 inch minus 102 Over 1 inch plus 202
3. Vent hem outside stitching margin from edge of webbing 1/16 to 3/16 inch 203 Over 3/16 inch 103 All rows of stitching not through reinforcement webbing 104
4. Vent loop length (finished dimension) Up to 1/2 inch plus 204 Over 1/2 inch plus 105 Minus direction any length 106
5. Vent line length (finished dimension) Up to 1/4 inch 205 Over 1/4 inch 107
6. Variation in vent line length per set Up to 1 percent 206 Over 1 percent 108
7. Twisted vent line (flat) 109
8. Twisted vent line (core or coreless braid) Over 360 degrees 207 Over 360 degrees, causing kinks in line when relaxed 110
9. Gore width at vent, centerline to centerline on main seam or as stated in TDP Up to 1/4 inch 208 Over 1/4 inch 111
10. Gore width at skirt, centerline to centerline on main seam or as stated in TDP Up to 1/2 inch 209 Over 1/2 inch 112
11. Cross and main seams, improper type or improper assembly 113
Classification Classification of Defect
10 June 2010 Page 2
No. Major Minor
12. Underfold (raw edge in main or cross seam) 114
13. Overfold in main seam Up to 1/2 inch or extended into center channel 210 Over 1/2 inch 115
14. Overfold in SF10-A and T11R main seam 1/8 up to 1/4 inch any length 211 Over 1/4 inch any length 116
15. Underfold in main seam A 4-needle seam not caught by 3 rows of stitches by at least
1/16 of an inch 117 3 intermittent underfolds of a 2-needle seam, up to
2 inches long and less than 12 inches apart 212 More than 3 intermittent underfolds up to 2 inches long and less than 12 inches apart 118 Underfold more than 4 inches in length 119
16. Underfold in SF10-A and T11R main seam 1/8 up to 1/4 inch any length 213 Over 1/4 inch any length 120
17. Overfold and underfold in cross seam Underfold 1/8 to 3/16 inch and up to 8 inches long 214 Underfold over 8 inches long 121 Up to 3 intermittent underfolds, 3/16 inch and up to 2 inches long, over 12 inches apart 215 More than 3 intermittent underfolds, 3/16 inch and up to 2 inches long, and less than 12 inches apart 122 Overfold 1/8 to 1/4 inch, full length of seam 216 Overfold over 1/4 inch any length 123
18. Overfold and underfold in SF10-A and T11R cross seam Underfold 1/8 up to 1/4 inch any length 217 Over 1/4 inch any length 124 Overfold 1/8 up to 1/4 inch any length 218 Over 1/4 inch any length 125
Classification Classification of Defect
10 June 2010 Page 3
No. Major Minor
19. Fullness in seam width Main seam
1/8 to 1/2 inch 219 Over 1/2 inch 126
Cross seam 1/8 to 1/4 inch 220 Over 1/4 inch 127
20. Fullness not evenly distributed along radial tape of SF10-A canopy 221
21. Wrinkles and pleats in cross and main seams Cross seams
1/16 to 1/8 inch and 1 per seam 222 1/16 inch and more than 1 per seam 128 1/16 inch and more than 6 per canopy 129 Over 1/8 inch 130
Main seams (canopies up to 35 feet in diameter) 1/16 to 1/8 inch and 1 per seam 223 1/16 to 1/8 inch and more than 1 per seam 131 1/16 to 1/8 inch and more than 6 per canopy 132 Over 1/8 inch 133
Main seams (canopies over 35 feet and up to 65 feet in diameter) 1/16 to 1/8 inch and 2 per seam 224 1/16 to 1/8 inch and more than 2 per seam 134 1/16 to 1/8 inch and more than 9 per canopy 135 Over 1/8 inch 136
Main seams (canopies over 65 feet in diameter) 1/16 to 1/8 inch and 3 per seam 225 1/16 to 1/8 inch and more than 3 per seam 137 1/16 to 1/8 inch and more than 12 per canopy 138 Over 1/8 inch 139
22. Vent and skirt hems improperly formed Raw edge showing 140 Intermittent underfold where edge is caught with 2 rows of stitching 226 Underfold where edge is caught with 1 row of stitching 141
23. Vent hem fold over main seam around webbing not straight 227
24. Matching of centerlines of seams when folded
Classification Classification of Defect
10 June 2010 Page 4
No. Major Minor
1/8 to 1/4 inch 228 Over 1/4 inch 142
25. Wrinkles, pleats, or folds in skirt and vent hems that do not extend into the gore fabric 1/4 to 1/2 inch and 1 per gore 229 Over 1/2 inch and more than 1 per gore 143 Over 1/2 inch and more than 12 per canopy up to 35 feet 144 Over 1/2 inch and more than 14 per canopy over 35 feet and up to 65 feet 145 Over 1/2 inch and more than 18 per canopy over 65 feet 146
26. Wrinkles, pleats, or folds in skirt and vent hems extending into the gore fabric 1/16 to 1/8 inch and 1 per gore 230 Over 1/16 inch and more than 1 per gore 147 Over 1/16 inch and more than 6 per canopy up to 35 feet in diameter 148 Over 1/16 inch and more than 12 per canopy over 35 feet and up to 65 feet in diameter 149 Over 1/16 inch and more than 18 per canopy over 65 feet in diameter 150 Over 1/8 inch 151
27. Skirt hem outside stitching margin from edge of webbing 1/16 to 3/16 inch 231 Over 3/16 inch 152 Any row of stitching not through skirt band webbing 153
28. Fold over of main seam around skirt webbing not straight 232
29. Matching of centerline of seams when folded 1/8 inch to 1/4 inch 233 Over 1/4 inch 154
30. Skirt hem formed by more than 2 pieces of tape or webbing unless otherwise specified on the applicable drawing 155
31. Tape or webbing used to form skirt hem does not extend across a minimum of 4 gores 156
32. Tucks, where section of gore fabric caught in stitching of seams or hems Up to 1/4 inch wide and up to 1/2 inch long 234
Classification Classification of Defect
10 June 2010 Page 5
No. Major Minor
Over 1/4 inch wide regardless of length 157 Over 1/2 inch wide regardless of width 158
33. Mismatching of cross seams First seam from vent over 2 inches and up to 2-1/2 inches 235 First seam from vent over 2-1/2 inches 159 All other seams over 2-1/2 inches and up to 3 inches 236 All other seams over 3 inches 160 All seams on SF10A greater than ½ inch 161
34. Vent lines out of sequence 162
35. Suspension and vent line overlap on canopy Up to 1/8 inch minus 237 Over 1/8 inch minus 163 Over 1/4 inch plus 238
36. Suspension lines not in proper channel or lines crossed 164
37. Cut, frayed, or damaged suspension, control or vent lines 165
38. Variation in suspension line length per set, between vent and skirt Up to 1/2 percent 239 Over 1/2 percent 166
39. Variation in…