ETSSLS_Attachment_0002_ETSSLS_Packout_Plan.pdf

PDF 615 KB Posted

Attached to
Expeditionary TRICON Self-Service Laundry System (ETSSLS)
Solicitation number
W911QY19R0008
Issued by

About this file

This document provides details for a federal contract opportunity to procure Expeditionary TRICON Self-Service Laundry Systems (ETSSLS). The U.S. Army Contracting Command - Aberdeen Proving Ground will issue a solicitation seeking an Indefinite Delivery Indefinite Quantity, Firm Fixed Price contract for the production and delivery of ETSSLS over a five year period. The ETSSLS will support Force Provider Expeditionary Life Support Modules, each serving 150 personnel, as well as other Joint Service deployable base camps and hospitals. Questions regarding the solicitation must be submitted by the date specified in the forthcoming solicitation document, though responses are not guaranteed. The solicitation is expected to be released between December 17-21, 2018 and will utilize tradeoff of price and non-price factors to select the best value proposal for award.

ETSSLS Attachment 0002 Equipment Packing Plan

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Expeditionary TRICON Self-Service Laundry System (ETSSLS)

ETSSLS Pack Out Instruction

Nov 2018

1 – Pad, Furniture modified hangs from dryer securement pins, in front of the washer /dryers prior to closing unit

1 – Waste 3K zipper top bag (Top of Shelf)

Dryer 2

- 1 AC shelf

- 1 Mat, anti fatigue

1 – power cable, 100 Amp, 25’ (Under Shelf)

Dryer 4

- Hose, 2.0” x 25’

Washer 4

- 1 waste basket

- 1 door curtain

- 2 ETS leveling jacks

Washer 2

- 1 wall mount heater

- Hose, ½” x 2’

- Hose 3/8” x 1’

1 – Pad, Furniture modified hangs from dryer securement pins, in front of the washer /dryers prior to closing unit

1 – Waste 3K zipper top bag (Top of Shelf)

Dryer 1

- Hose, 1.5” x 25’

1 – power cable, 100 Amp, 25’ (Under Shelf) 1- Ground rod

Washer 1

- 1 wall mount heater

- Hose 1.5” x 5’

- Hose 1.0” x 5’

Washer 3

- 1 waste basket

- 1 door curtain

- 2 ETS leveling jacks

Dryer 3

- 1 AC shelf

- 1 Mat, anti-fatigue

(2) ECU Packout assemblys, 9-2-4835 are packed behind the dryer units, on the pack out shelf

(1) Toolbox 20” x 8.75” x 10.5” is packed out behind the dryer units, on the pack out shelf, containing;

• WYE, cam and groove, M xM x F

• Reducer, Cam and Groove, 2.0” F x 1.5” M, brass

• Tee, assembly, 1.5” F x M x M

• Screw driver, flat head

• Socket, deep wall, 9/16’

• Ratchet, 3/8”

• Nut driver, 5/16”

• Switch, pressure

• Gasket, 1.5”

• Gasket, 1”

• Hose clamps

Ceiling lift pole is packed under the roof panel, after the expansions are collapsed, prior to closing container doors

File details come from the government source that posted it. Updated .