Amedment_0002.pdf
PDF 23 KB Posted
- Attached to
- Multiple Award Task Order Contract (MATOC) for Construction Projects and Repairs Federal contract opportunity
- Solicitation number
- W911QY-16-R-0023
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amedment_0004.pdf | ||
| Amedment_0003.pdf | ||
| WD_MA160001_04-08-2016__MA1_Mod_5.docx | DOCX document | |
| Amedment_0001.pdf | ||
| ATTACHMENT_0004_of_SOW_Drawings _Hudson_Conversion_Unit_16_(2016)_11x17.pdf | ||
| ATTACHMENT_02_Project_Information_Worksheet.pdf | ||
| ATTACHMENT_05_Prototypical_Proposal_Form_revised.pdf | ||
| ATTACHMENT_04_Self_Performing.pdf | ||
| ATTACHMENT_01_Statement_of_Work_(SOW).pdf | ||
| W911QY-16-R-0023.pdf | ||
| ATTACHMENT_03_Past_Performance.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0002 is provide answ ers to questions received from potential Offerors.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911QY-16-R-0023
X 9B. DATED (SEE ITEM 11)
12-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Apr-2016
CODE
W6QK ACC-APG NATICK
CONTRACTING DIVISION
BLDG 1 GENERAL GREENE AVENUE
NATICK MA 01760-5011
W911QY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911QY-16-R-0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by full text:
AMENDMENT 0002 Q&A
The following are the answers to questions received from potential Offerors:
Question 1: Solicitation Section 6.4.4 requests that “Offerors submit a complete SF330, Parts I and II…” As this is not an AE services proposal as noted in the Solicitation, and as a project organization chart and responsibilities and lines of authorities are already addressed in Solicitation Section 6.5.2.1, please confirm that the SF330 Section D organization chart is not required for this proposal. (It is understood that the remainder of the SF330 will be submitted.)
Answer 1: The SF330 Section D organization chart is not required.
Question 2: Amendment 1 allows submittal by email as an option to submitting hard copies and a CD. What is the maximum file size your server will accept by email?
Answer 2: The maximum file size that can be used for submitting proposals by e-mail is 10MB. If the Offeror needs to submit proposal using more than one e-mail, in the subject line put e-mail 1, 2, 3, etc, Volume number, and title of Volume. Also for proposals being e-mail, put the solicitation number in the subject line.
Question 3: Section 7.2 states “For Army or other DOD contracts, provide a copy of the signed CCAS (Construction Contract Administration Support System) evaluation issued at the completion of the project. According to the Contractor Performance Assessment Reporting System (CPARS) help desk, the CPARS is the single Federal Government wide information system for processing and collecting contractor performance information and all evaluations whether Construction, A&E or services are now all called CPARS. May CPARS Rating be submitted for past performance documentation in lieu of CCAS?
Answer 3: Yes, CPARS Rating may be submitted for past performance documentation in lieu of CCAS in the proposals.
Question 4: Please clarify stove locations in the new kitchen (not shown on drawing), and will it be gas or electric?
Answer 4: The existing stove remains in its existing location. The stove is electric.
Question 5: After Demo, What is the plan of action for plumbing in floor work for hot/cold drain work including laundry lines and drain?
Answer 5: Existing plumbing to be removed - Plumbing for hot/cold water lines and drains shall be capped off in place but concealed within wall. Patch walls as required and finish.
Question 6: Will there be trenching required for new plumbing locations?
Answer 6: No, there will be no trenching for plumbing fixtures.
Question 7: Will there be any required work for the HVAC supply lines in ceiling that will need to be moved?
W911QY-16-R-0023
Answer 7: Yes, if HVAC supply lines/grill are effected, then they shall be relocated near bottom of stairway at first floor.
Question 8: The current HVAC system is controlled by 2 thermostats, will they be staying in the same location or will there be any zoning relocations for better operations?
Answer 8: The two (2) Thermostats will remain at same location.
Question 9: The solicitation states that "This action is being solicited as 100% small business 8a and HUBZone Set- Aside." Is this meant to mean that the solicitation is open to small business firms, AND 8(a) firms, AND HUBZone firms? Or that it is open only to 8(a) and HUBZone firms (and NOT to other small business firms). If the latter, is it the Army's intent to exclude veteran-owned and service-disabled veteran-owned small businesses?
Answer: In order to propose on the MATOC W911QY-16-R-0023, the Offerors have to be an 8a or a HubZONE. Furthermore, the 8a's have to be from one of the six New England states listed in the solicitation. The restricted set-aside was done to meet social economic goals that Natick Contracting Division has to meet. The Natick Contracting Division has different percentages of set-asides that they try to meet each year.
(End of Summary of Changes)