Install 400A Electrical Service to Room 003, Building 35, for the Vertical Lifting Machines (VLMs) at Watervliet Arsenal
Solicitation number
W911PT26QA013
Issued by

About this file

This Standard Form 30 Amendment of Solicitation/Modification of Contract is for a U.S. Army Corps of Engineers electrical installation project at Waterveldt Arsenal. The amendment extends the response due date from 07 November 2025 to 20 November 2025, and changes the response time from 3:00 PM to 2:00 PM. Key technical details include installing a new 400A 480V panel, approximately 70 linear feet of 12" cable tray, 600V cable connections, and electrical system modifications. The contractor will be responsible for providing PDF and CAD as-built drawings, performing an arc-flash study, and installing electrical equipment according to specific technical specifications. The project does not require a bid bond, and the contractor is expected to provide their own financing, with payment occurring at project completion.

Specific requirements include providing a NEMA 12 indoor panel with a main type breaker, installing cable tray along the south wall of Room 005, and using specific cable types like XHHW-2 THWN-2. The amendment includes responses to 14 Requests for Information (RFIs) covering detailed technical specifications, equipment ratings, diagram requirements, and installation parameters. The project involves electrical work in a facility with approximately 48'-4" ceiling height, and the contractor must avoid sprinkler heads and light fixtures during installation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Time 03:00 PM 02:00 PM Response Due Date 07 Nov 2025 20 Nov 2025

List of Contract Documents, Exhibits, or Attachments

Miscellaneous text in this section has been added to:

RFI RESPONSES:

RFI #1 A revised SOW was provided yesterday which removed some of the spec references. Require the seven specs referenced here

26 00 00.00 20- BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 - COMMON WORK RESULTS FOR ELECTRICAL

26 05 19.10 10 - INSULATED WIRE AND CABLE

26 05 71.00 40 - LV OVERCURRENT PROTECTIVE DEVICES

26 08 00 - APPARATUS INSPECTION AND TESTING

26 24 16.00 40 - PANELBOARDS

26 28 01.00 10 - COORDINATED POWER SYSTEM PROTECTION

A: All specifications requested posted with amendment.

'Demo' & 'Cast-In-Place Concrete' specs apply only in relation to placing a service pad under LV transformer & cleanup of contractor materials.

RFI# 2 During planned outages we need to provide temporary external power to all Life Safety & Fire alarm /control... Would be good to know how many circuits, any higher voltage items or is it just small circuits/do they have a list of what will be needed?

A: It is confirmed that B35 Life Safety Circuits (fire panels) will NOT be affected upon loss of busway power.

It is expected that contractor will need to plan only for their own construction needs (lights, tools, lifts, etc.) when impacting local room distribution circuits.

RFI #3 - Existing Bus Plug Connection SOW (S)1.02.A.1 references connection from the existing 400A busway disconnect. Please confirm whether WVA will make the final termination at the existing bus plug/disconnect, or if this is to be completed by the contractor.

A. Bus Switch is existing - contractor shall install 600V cable to switch.

RFI #4 - New 400A 480V Panel The SOW refers to a new 400A 480V panel but Section 2.02 lists only a Square D QO-style 200A 120/208V panel.

Please confirm:

Who supplies the 400A panel. A. Contractor If by contractor, provide required breaker count, main type (breaker or lug), and enclosure/NEMA rating.

A. Contractor will provide a NEMA 12 for commercial indoor use, 480V, 400A Main type breaker & 8x 30A feeder

W911PT26QA0130001

breakers (1/unit + 2x spare). Brand name or equal.

RFI #5- Section 1.02 calls for 500 MCM THHN, while Section 2.02 specifies XHHW-2. Please confirm the required insulation type.

A. Can use a product similar to Southwire_1C_Cu_600V_XHHW-2_THWN-2_Superslick_Elite_Cable. 12AWG at Disconnect is appropriate

RFI #6 - Cable Tray Installation -The SOW calls for ~70 LF of 12" cable tray along the south wall of Room 005.

Please confirm:

Exact routing and elevation (AFF).

A. See SK-001 Whether this tray carries cabling to the new panels or is to be left empty.

A. Tray + cable to floor level disconnect bank (6x 600V fused disconnect switches), with fuses @ 20A each.

Whether grounding is required, and if so, specify conductor size and termination location.

A. Ground is required. Terminate @ panels (copper bar) & disconnect switches.

RFI #7 - Transformer vs Panel Rating - The WVA-supplied 45 kVA 480-120/208 V transformer provides ~150 A at 120/208 V. The new panel is described as 200 A.

Please confirm if a 200 A panel with 150 A main (or main-lug only) is acceptable, or if transformer size will be increased.

A. Contractor will provide a 200A Main

RFI #8 - Three-Line Diagram Requirement -Section 4.05.C.2 calls for a "3-line diagram" in as-built deliverables.

Please confirm if this level of detail is actually required, or if a 1-line diagram will satisfy the submittal.

A. 1-Line is acceptable. Plan/elevation views of routing are still required.

RFI #9 - CAD File Deliverables- Section 4.05.D requires both PDF and CAD as-builts. Please confirm whether CAD files are mandatory for this project and, if so, what file format is acceptable (.DWG, .DXF).

A. PDF & CAD files (DWG) are to be provided - 2x soft copy on CDs.

RFI #10 - Arc-Flash Study Responsibility -Appendix A Line 20 lists an Arc-Flash Study due at commissioning.

Please confirm whether this study is to be performed by the contractor or the Government, and whether it covers only the new downstream equipment or the entire upstream busway system.

A. Study provided by Contractor - model as required to correctly label installed equipment.

RFI#11- Is there a general layout to where the new electrical equipment will be within the room?

A. Sketch SK-001-DJF-251113.R0 is uploaded on SAM.gov

RFI #12- What height is the new cable tray to be at?

A. Largest stacker @ 44'-4 3/16" height. Bid estimate of 50' is still good.

Note: Room Ceiling is approximately 48'-4". Cable Tray will be along ceiling I-beams and/or South wall. Contractor will need to avoid sprinkler heads & light fixtures.

RFI#13- Is there a requirement for a bid bond for the subject project?

No, the requirement is a commercial service, without need for bonds. Additionally, payment will not occur till the A.

end. Contractor is expected to provide own financing.

RFI# 14- Is there a cost estimate , budget or ballpark figure for the project listed? Is there an actual start date for the project?

No.A.

IDCode: J
Page: 1
Pages: 4
AmendNo: 0001
EffDate: 13 NOV 2025
ReqNo:
ProjNo:
IssCode: W911PT
AdmCode:
IssuedBy: W6QK ACC WVA

ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST

WATERVLIET, NY 12189-4000

UNITED STATES

CHRISTOPHER BATTISTE, EMAIL: CHRISTOPHER.K.BATTISTE.CIV@ARMY.MIL TELEPHONE: 518-266-4607 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W911PT26QA013
SolDate: 27 OCT 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: This Amendment is Issued to Incorporate Responses to Requests For Information (RFIs); and provide update to the Performance Work Statement. All changes are posted and found on www.Sam.Gov. This Amendment also extends due date to 20 November 2025 @1400 EST. No additional site visits will be granted.
ContNameTitle:
CoNameTitle:
ContDate:
CODate:

File details come from the government source that posted it. Updated .