This is a Questions & Answers document for a solicitation regarding Self-Contained Breathing Apparatus (SCBA) maintenance and repair services at Letterkenny Army Depot. The document clarifies the equipment inventory and scope of services, specifying 78 cylinders of varying capacities (48 45-min 5500psi, 16 75-min 5500psi, 14 15-min 4500psi), 34 Scott Air packs, 4 ska packs, and 2 Rit packs. The SCBA packs are X3 PRO Scott 3m NFPA 2018 models.
The Q&A confirms that SCBA Functional Flow Testing is not included in the scope of work, and the contractor is only required to perform annual calibration of the posichek unit, with LEAD personnel performing all SCBA maintenance. The document also identifies the specific equipment models: a Scott Revolve Air compressor (Model AC0404362110, Serial #02W-2506) located in the firehouse and an Air Trailer Scott Liberty Series (Model ABL18016, Serial #45T6F-1429).
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers
Q1. Could you please provide the quantities of cylinders, air packs, and compressors that will require maintenance and testing over the course of a year?
A1. 1. Cylinders - 48(ea) 45min 5500psi, 16(ea) 75min 5500psi, 14(ea) 15min 4500psi SCBA - 34 Scott Air packs, 4 ska packs, 2 Rit packs
Q2. For each item, can you share the model number and pressure rating for the air packs?
A2. Pressure rating included above. No specific model number identified – 3M™ Scott™ Cylinders. SCBA packs are X3 PRO Scott 3m NFPA 2018
Q3. If applicable, could you also provide the model and serial number of the compressor and fill station?
A3. Compressor in firehouse is a Scott Revolve Air, Model AC0404362110, Serial #02W-2506.
Air Trailer Scott Liberty Series Model ABL18016, Serial #45T6F-1429
Q4. In reading the Scope of Work, I did not see any SCBA Functional Flow Testing. Is that correct? No Air-PAKs to be Flow Tested?
A4. That is correct, SCBA Flow testing should not be included.
Q5. It appears that this requirement does NOT include the NFPA & DoD mandated POSICHEK “flow testing” of the SCBA equipment at LEAD as part of the preventative maintenance of the equipment.
A5. We only need our posichek unit calibrated annually and we will perform all the maintenance to our SCBAs.