CHL023_Moose_Creek_Dam_Sources_Sought_Questionnaire.docx
DOCX document 13 KB Posted
- Attached to
- CHL023 Moose Creek Dam Safety Modification Federal contract opportunity
- Solicitation number
- W911KB21R0001
About this file
This sources sought announcement from the U.S. Army Corps of Engineers seeks capabilities statements from firms for the Moose Creek Dam Safety Modification project in Alaska. Interested parties are requested to submit documentation demonstrating experience as a prime contractor on similar heavy and civil engineering projects valued between $100-250 million over the past six years. Capabilities statements not exceeding five pages should include business information, experience completing comparable projects, and responses to an attached questionnaire. Statements are due by September 10, 2019. The project will construct a mix-in-place bentonite-cement barrier wall through the embankment of Moose Creek Dam to sever erodible soils below using cutter soil mix or trench remixing methods. The selected contractor will be responsible for all labor, materials and equipment to complete the 4.5 mile long barrier wall from 56 to 66.5 feet below the dam crest. The wall must achieve 200 psi strength after 28 days and approach 500 psi long term.
CHL023 Moose Creek Dam Sources Sought Questionnaire
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Industry Questions - 20200827 Moose Creek Dam Mod TRACK CHANGES.docx | DOCX document | |
| Dwgs CHL023 20200810 Without Exploration Logs Part 4 of 5.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 1 of 5.pdf | ||
| MCD Industry Day Sign In Sheet 8-20-2020.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 5 of 5.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 2 of 5.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 3 of 5.pdf | ||
| Industry Day Meeting Area (20 Aug 2020).pdf | ||
| 202008_MCD Virtual Industry Day Slides.pptx | PPTX presentation | |
| MCD Industry Day Information(CT Edit).pptx | PPTX presentation | |
| Moose_Creek_Dam_Mod_Industry_Day_Questions.docx | DOCX document | |
| Moose_Creek_Mix_Design_Report_FINAL.pdf | ||
| 201907_MCD_Sources_Sought_Information.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911KB21R0001 – CHL023 Moose Creek Dam Sources Sought Questionnaire
1. Do you foresee teaming and/or using subcontractors? For what trades? __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
2. Does your company have experience working on:
a. USACE projects? __________________________________________________________
b. Projects in the far north working with/around permafrost? If so, explain. ____________
3. Do you foresee seasonal weather concerns and/or limitations? If so, explain. ________________
a. What do you foresee as ambient operating temperatures? If so, explain. _____________
4. What method of wall construction would you propose? _________________________________
5. Additional thoughts or concerns? __________________________________________________
File details come from the government source that posted it. Updated .