201907_MCD_Sources_Sought_Information.pdf
PDF 5 MB Posted
- Attached to
- CHL023 Moose Creek Dam Safety Modification Federal contract opportunity
- Solicitation number
- W911KB21R0001
About this file
This sources sought announcement from the Department of the Army Corps of Engineers Engineering District Alaska seeks capabilities packages from firms interested in modifying Moose Creek Dam for safety. Firms must demonstrate the ability to construct a 4.5 mile mix-in-place barrier wall 56 to 66.5 feet below the crest of the dam embankment using cutter soil mix or trench remixing and deep wall methods. The barrier wall is intended to sever a continuous fine-grained sand/silty sand layer and must have an unconfined compressive strength of 200 psi at 28 days approaching 500 psi long term. Interested firms must submit packages by September 10, 2019 demonstrating bonding limits up to $100-250 million, experience on similar projects in the past six years, and business information including size as a small, HUBZone, SDVOSB, 8(a), or woman-owned business. The applicable NAICS code is 237990.
Moose Creek Dam 35% Design Information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Industry Questions - 20200827 Moose Creek Dam Mod TRACK CHANGES.docx | DOCX document | |
| Dwgs CHL023 20200810 Without Exploration Logs Part 4 of 5.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 1 of 5.pdf | ||
| MCD Industry Day Sign In Sheet 8-20-2020.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 5 of 5.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 2 of 5.pdf | ||
| Dwgs CHL023 20200810 Without Exploration Logs Part 3 of 5.pdf | ||
| Industry Day Meeting Area (20 Aug 2020).pdf | ||
| 202008_MCD Virtual Industry Day Slides.pptx | PPTX presentation | |
| MCD Industry Day Information(CT Edit).pptx | PPTX presentation | |
| Moose_Creek_Dam_Mod_Industry_Day_Questions.docx | DOCX document | |
| Moose_Creek_Mix_Design_Report_FINAL.pdf | ||
| CHL023_Moose_Creek_Dam_Sources_Sought_Questionnaire.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALL INFORMATION IS SUBJECT TO CHANGE ONCE THE
PROJECT IS OUT FOR BID.
THIS INFORMATION REPRESENTS A 35% DESIGN
PROJECT LOCATION
OPERATIONAL SCHEMATIC
Presenter Presentation Notes Population at risk Operational schematic
REACHES
Project Office
R ea ch
R ea ch
Control Works/Chena River
FLOODWAY AND DAM
Control Works (1992 Pool of Record)
Presenter Presentation Notes
NEED TO UPDATE
GEOLOGY
• Foundation is gravelly sand/sandy gravel that likely exceeds 1000 ft in thickness with a surficial blanket of silt.
• The transition from sand and gravel to silt includes layers of sand and silty sand, including fine sand with Cu<3.
• The sand and gravel includes gap graded and open work gravel lenses.
• Sloughs from meanders and braids, as well as permafrost, complicate the near surface geology.
Chena River
Tanana River
600 ft
MCD
SLOUGHS AND PERMAFROST LOCATIONS
Mapped Sloughs
Mapped Permafrost
9EMBANKMENT DESIGN
Rock Fill
10GEOTECHNICAL INVESTIGATION – USACE-POA
• 53 additional borings with continuous sampling.
• 5,120 feet drilled.
• Borings ranging from 60 to 130 feet deep.
Results
• Encountered permafrost.
• Fine grained soil layer around 90 to 110 feet below the ground surface.
• Ground truth for Geophysics performed.
• Mix Design samples acquired.
• Better understanding of foundation conditions.
• Encountered zones with cobbles.
11GEOTECHNICAL INVESTIGATION – USACE-POA
Centerline Boreholes
R 3 R4 R5 R 7R6 R8 R9
TYPICAL CENTERLINE BORING
Depth of Cutoff Wall at 464 feet NAVD88
Sands and Gravel
Sand
Water Table
Type III Fill
Semi-Pervious Fill
Type I Fill
Type II Fill
Type II Fill
TYPICAL DOWNSTREAM BORING
Silt
Sand
Sands and Gravel
Depth of Cutoff Wall at 474 feet NAVD88
Water Table
14GEOPHYSICAL INVESTIGATION
Capacitive-Coupled Resistivity (CCR)
• 50 foot depth Electrical Resistivity Tomography (ERT)
• 300 foot depth Ground Penetrating Radar (GPR)
• 50 foot depth
Thawed zone at surface
Permafrost at depth
Station 290+00 Cross-transect
15GEOPHYSICAL INVESTIGATION – ERT
File Name
Station 410+00 to 490+00 (North of Control Works)
Station 230+00 to 390+00 (South of Control Works)
Permafrost
Embankment zone to ~490 feet NAVD88
• High resistivity due to nature of the embankment (Brown to Red) Thawed zone to ~400 feet NAVD88
• Lower resistivity due to thawed coarse grained soils (Blue to Green)
Deeper frozen zone to ~200 feet NAVD88
• High resistivity due to frozen soils
(Brown to Red)
GEOPHYSICAL INVESTIGATION – GPR
GPR
• Harder to distinguish specific features
• Shows excavations and different phases of construction
Results
• Better understanding of permafrost.
• Thawed zone between embankment and deeper permafrost across site.
• See extent of features (Control Works, sloughs, and phases of work).
POTENTIAL FAILURE MODES
24 ft
40 to 80 ft
Silt Layer
Coarse Sand and Gravel Layer
Pooling and Floodway from Chena River
Stability Berm
Upstream
Water Stage <= 525 feet NAVD 88
Continuous Silty sand/fine sand Layer
BoilsBoils
Downstream – City of North Pole
Impervious silt blanket
During periods of high water stages in the Chena River, due to the silty sand and fine sand layer under the silt layer, three modes of failure can occur under the Moose Creek Dam: 1. backwards erosion and piping (horizontal exits), 2. backwards erosion and piping (vertical exits) and 3. contact erosion. These three modes of failure could act independently or together, eventually causing a failure in the dam, leading to flooding and potential risk of loss of life and damage to the cities of North Pole and Fairbanks, and other adjacent communities.
Horizontal Exit
Vertical Exit
Allowable Seepage
Backwards erosion
Potential Failure point
Contact Erosion
Piping
LEGEND
Potential Failure in Dam
Fairbanks
City of North Pole
• Backward Erosion and Piping with Vertical Exit
• Backward Erosion and Piping with Horizontal Exit
• Contract Erosion
TENTATIVELY SELECTED PLAN (BARRIER WALL)
Station Wall Depth (feet) Wall Elevation (NAVD88)
240+00 21 509
240+00 243+00 21 56 509 474
243+00 284+00 56 474
284+00 285+00 56 62.5 474 468
285+00 335+00 62.5 468
335+00 336+00 62.5 66.5 468 464
336+00 406+00 66.5 464
407+00 493+00 62 470
LOW POINT DRAIN
20BARRIER WALL (CONTROL WORKS TIE-IN)
21GEOTECHNICAL INVESTIGATION – USACE-POA
Centerline Boreholes with Barrier Wall Extents
R 3 R4 R5 R 7R6 R8 R9
POTENTIAL PERMAFROST AND BEDROCK AREA
Potential Permafrost Potential Bedrock
EXISTING CREST ALLOWABLE CREST HEIGHT
REDUCTION
Existing Crest (ft) Allowable Crest Height Reduction (ft) Crest Reduction 0 5 Working Platform Width 23.5 34 51.5 61 Min Distance from Drain 8 8
MIX DESIGN
FINDINGS TO DATE
Bureau of Reclamation Design Standards No. 13: Embankment Design
(Table 16.7.11-1)
Dam Name Cement Factor (lb/yd3)
Bentonite Content
(% of cement)
W/C Ratio
Coarse/Fine Aggregate
Ratio
28-day UCS (lb/in2)
Island Copper Mine 239 22 2.78 1.0 220
Wister Dam 350 10 1.0 1.39 598
Meeks Cabin 255 15 1.85 1.0 4151
1Based on average for the mix shown.
Golder 2018 Mix Design (with Relief Well Water) FHWA Design Manual: Deep Mixing For Embankment and Foundation Support
(Bench Scale Testing)
Binder Factor Cement Factor (lb/yd3)
Bentonite Content
(% of cement)
W/C Ratio
Coarse/Fine Aggregate
Ratio
28-day UCS (lb/in2)
10 (lb/ft3) (8.16) 187 18.0 2.03 258
20 (lb/ft3) (13.68) 339 9.0 1.38 582
25 (lb/ft3) (16.08) 405 7.2 1.23 934
30 (lb/ft3) (18.27) 466 6.0 1.13 1199
35 (lb/ft3) (20.29) 521 5.1 1.06 1334
Bureau of Reclamation
• Used for comparison of Mix Design
FHWA
• Used Bench Scale Testing to conduct Mix Design
Additional Mix Designs will be performed in the future.
PROPOSED CONSTRUCTION CRITERIA/CONSTRAINTS
Specification
Max Depth 66.5 feet
Min Width 18 inches
Max Width 36 inches
Length 25,300 feet (4.5 Miles)
Permeability 1E-05 – 1E-06 cm/sec
Unconfined Compressive Strength 200 psi @ 28 days (approach 500 psi long term)
Measure of Acceptance Verification Coring Yes
Insitu Permeability Testing Yes
Unconfined Compressive Strength Yes
Permeability on Samples Yes
Homogeneous and Continuity Yes
Connections to Existing Structures Low Point Drain Tie into Sheet Pile
Control Works Tie into Sheet Pile or have positive contact. No embedment.
26ALLOWABLE TECHNOLOGY FOR BARRIER WALL
CONSTRUCTION AT MOOSE CREEK DAM
Cutter Soil Mix Method Trench Remixing and Deep Wall Method Clamshell/Hydromill Method
Cutter Soil Mix (CSM) or Trench Remixing and Deep wall (TRD) methods shall be utilized to mix the embankment and foundation material with Bentonite and Portland Cement in order to construct a Barrier Wall through Moose Creek Dam.
Clamshell/Hydromill or long stick excavator methods with use of a slurry trench will NOT be utilized for barrier wall construction. Foundation and embankment materials will not allow a Bentonite slurry trench. Loss of slurry could result in failure of the embankment into the trench during construction.
| All information is subject to change once the project is out for bid. ��This information represents a 35% design |
| Project Location |
| Slide Number 3 |
| Reaches |
| Slide Number 5 |
| Slide Number 6 |
| Geology |
| Slide Number 8 |
| Slide Number 9 |
| Geotechnical Investigation – USACE-POA |
| Geotechnical Investigation – USACE-POA |
| Typical Centerline Boring |
| Typical Downstream Boring |
| Geophysical Investigation |
| Geophysical Investigation – ERT |
| Geophysical Investigation – GPR |
| Potential Failure modes |
| Slide Number 18 |
| Low Point Drain |
| Barrier wall (control works tie-in) |
| Geotechnical Investigation – USACE-POA |
| Potential Permafrost and Bedrock Area |
| Existing Crest |
| Mix Design Findings To Date |
| Proposed Construction Criteria/Constraints |
| Allowable Technology for Barrier Wall construction at moose creek dam |