AMENDMENT 4 WITH REPLACEMENT PAGES

View the file

Other files

File Type Posted
Amendment 6.pdf PDF
DWGS-FTR198-AM 5.pdf PDF
J A Sole Source Items for FBO.pdf PDF
Amendment 5.with replacement pages.pdf PDF
ufc_4_750_07 Aquatic Facilities.pdf PDF
SF30 Amendment 3.pdf PDF
Site Visitor Attendees List.pdf PDF
Design Guide - PFF —
AM2 SF30.pdf PDF
AM2 SF30.pdf PDF
SF30 AM 1.pdf PDF
SECTION 00 22 10 ATTACHMENTS.pdf PDF
FTR198-RFP.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: FTR198 Buckner Physical Fitness Facility Expansion, JBER, Alaska

PHASE 2 PROPOSAL DUE DATE REMAINS UNCHANGED: March 6, 2012 at 2:00 PM Alaska Time. Proposals shall be submitted in accordance w ith Section 00 21 00 paragraph 1.10 Proposal Submittals.

This amendment provides changes to the solicitation as indicated on page 2 of this document.

YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Feb-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-11-R-0023

X 9B. DATED (SEE ITEM 11)

19-Oct-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Feb-2012

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-11-R-0023

SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE

The following have been added by full text:

AMENDMENT #0004

a. The following drawings are substituted for the superseded drawings:

NONE

b. The following revised documents are substituted for the superseded documents. The identifier “AM#4” appears before and after new and/or revised material and replacement pages are provided, except as noted:

APPENDIX A-01 19 30.00 29 Government Field Office added

APPENDIX C-Para 6.11 Revised

APPENDIX C-Para 6.13 Revised

c. The following documents are deleted:

d. The following documents are added:

e. The following revisions are incorporated:

f. Other:

Wage Rates have been updated.

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 46 - WAGE DETERMINATIONS SCHEDULES

The following have been modified:

WAGE RATES

AM#4

General Decision Number: AK120001 02/10/2012 AK1

Superseded General Decision Number: AK20100001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 01/06/2012 1 01/20/2012 2 02/03/2012 3 02/10/2012

ASBE0097-001 01/01/2011

Rates Fringes

Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 36.11 15.26

ASBE0097-002 01/01/2011

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 36.11 15326

BOIL0502-002 07/01/2011

Rates Fringes

BOILERMAKER......................$ 42.70 24.86

BRAK0001-002 07/01/2011

Rates Fringes

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 37.39 17.60 Tile & Terrazzo Finisher.........$ 31.78 17.60

CARP1501-001 09/01/2011

Rates Fringes

MILLWRIGHT.......................$ 33.89 18.23

CARP2520-003 07/01/2010

Rates Fringes

Diver Stand-by....................$ 39.80 18.73 Tender......................$ 38.80 18.73 Working.....................$ 79.60 18.73 Piledriver Carpenter...................$ 35.49 18.73 Piledriver; Skiff Operator and Rigger..................$ 34.49 18.73 Sheet Stabber...............$ 35.49 18.73 Welder......................$ 41.05 18.73

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP4059-001 09/01/2011

Rates Fringes

CARPENTER

Carpenter...................$ 35.49 20.38 Lather/Drywall Applicator...$ 35.49 20.38

ELEC1547-004 03/28/2011

Rates Fringes

CABLE SPLICER....................$ 39.77 3%+$21.35

Electrician;Technician...........$ 38.02 3%+$21.35

ELEC1547-005 01/02/2012

Line Construction

Rates Fringes

CABLE SPLICER....................$ 48.90 3%+23.10

Linemen (Including Equipment Operators, Technician)...........$ 47.15 3%+22.57 Powderman........................$ 45.15 3%+23.10

TREE TRIMMER.....................$ 34.10 3%+18.10

ELEV0019-002 01/01/2012

Rates Fringes

ELEVATOR MECHANIC................$ 49.035 23.535+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day

ENGI0302-002 01/01/2012

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.43 19.00

GROUP 1A....................$ 39.19 19.00

GROUP 2.....................$ 36.66 19.00

GROUP 3.....................$ 35.94 19.00

GROUP 4.....................$ 29.73 19.00

TUNNEL WORK

GROUP 1....................$ 41.17 19.00

GROUP 1A...................$ 43.11 19.00

GROUP 2....................$ 40.33 19.00

GROUP 3....................$ 39.53 19.00

GROUP 4....................$ 32.70 19.00

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller; Back Filler; Barrier Machine (Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors;

Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine;

Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Shovels, Backhoes, excavators with all attachments, Draglines, Clamshells; Gradalls-3 yards and under; (b) Hydralifts or Transporters, all track or truck type,(c) Derricks; Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax: Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Sauerman-Bagley;

Scrapers-through 40 yards; Service Oiler/Service Engineer;

Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine;

Sub-grader (Gurries, C.M.I. and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance Engineer

GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes,excavators with all attachments, draglines, clamshells-over 3 yards, (b) Tower cranes;Licensed Water/Waste Water Treatment Operator;

Loaders over 5 yds.;Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours);

Motor Patrol Grader, Dozer, Grade Tractor (finish: when finishing to final grade and/or to hubs, or for asphalt);

Power Plants: 1000 k.w. and over; Quad; Screed; Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types;

Scrapers over 40 yards; Camera/Tool/Video Operator (Slipline).

GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under; Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1);

Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, Elevating Grader, Dumor and similar;

Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Assistant Engineer (if over 85 tons or 100 ft. boom);Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter;

Steam Cleaner; Drill Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

IRON0751-003 08/01/2011

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 33.40 23.16

FENCE, BARRIER AND

GUARDRAIL INSTALLERS........$ 29.90 23.16

GUARDRAIL LAYOUT MAN........$ 30.64 23.16

HELICOPTER, TOWER...........$ 34.40 23.16

LABO0341-005 07/01/2011

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees

GROUP 1.....................$ 29.00 20.02

GROUP 2.....................$ 30.00 20.02

GROUP 3.....................$ 30.90 20.02

GROUP 3A....................$ 34.18 20.02

GROUP 3B....................$ 35.01 20.02

GROUP 4.....................$ 18.57 20.02

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 31.90 20.02

GROUP 2....................$ 33.00 20.02

GROUP 3....................$ 33.99 20.02

GROUP 3A...................$ 37.60 20.02

GROUP 3B...................$ 38.51 20.02

Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 29.00 20.02

GROUP 2.....................$ 30.00 20.02

GROUP 3.....................$ 30.90 20.02

GROUP 3A....................$ 34.18 20.02

GROUP 3B....................$ 35.01 20.02

GROUP 4.....................$ 18.57 20.02

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 31.90 20.02

GROUP 2....................$ 33.00 20.02

GROUP 3....................$ 33.99 20.02

GROUP 3A...................$ 37.60 20.02

GROUP 3B...................$ 38.51 20.02

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor

Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PAIN1959-001 07/01/2011

NORTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 29.17 18.47

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 29.67 18.47

PAIN1959-002 07/01/2011

SOUTH OF THE 63RD PARALLEL

Rates Fringes

Painters:

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 26.98 18.22 Machine Taper/Drywall.......$ 28.18 18.22 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 29.48 16.22

PAIN1959-003 07/01/2011

NORTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 34.09 17.28

PAIN1959-004 07/01/2011

Rates Fringes

FLOOR LAYER: Carpet.............$ 30.52 12.39

PAIN1959-006 07/01/2011

SOUTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 34.09 17.23

PLAS0867-001 02/01/2012

Rates Fringes

PLASTERER

North of the 63rd parallel..$ 33.93 19.07 South of the 63rd parallel..$ 33.68 19.07

PLAS0867-004 02/01/2012

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 33.68 19.07 South of the 63rd parallel..$ 33.43 19.07

PLUM0262-002 01/01/2012

East of the 141st Meridian

Rates Fringes

Plumber; Steamfitter.............$ 36.02 23.82

PLUM0367-002 07/01/2011

South of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 36.98 18.72

PLUM0375-002 07/01/2011

North of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 39.71 18.45

PLUM0669-002 04/01/2011

Rates Fringes

SPRINKLER FITTER.................$ 41.55 19.70

* ROOF0190-002 06/01/2011

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply Roofs NORTH OF THE 63RD PARALLEL..$ 28.50 2.44 + a SOUTH OF THE 63RD PARALLEL..$ 28.50 2.44 + a

FOOTNOTE:

a. Employers are to supply employees with comprehensive medical insurance. Employer is responsible to cover, at minimum one-half (1/2) of the individual premium. The individual will be responsible for the remaining premium.

SHEE0023-003 06/01/2010

South of the 63rd Parallel

Rates Fringes

Sheet Metal Worker...............$ 38.84 18.35

SHEE0023-004 07/02/2010

North of the 63rd Parallel

Rates Fringes

Sheet Metal Worker...............$ 42.98 18.56

TEAM0959-003 09/01/2011

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 37.77 16.43

GROUP 1A....................$ 39.04 16.43

GROUP 2.....................$ 36.51 16.43

GROUP 3.....................$ 35.69 16.43

GROUP 4.....................$ 35.11 16.43

GROUP 5.....................$ 34.35 16.43

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Partsman;

Oil Distributor Drivers; Trucks/Jeeps (push or pull);

Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate);

Lumber Carrier; Water Wagon, semi; Water Truck, dual axle;

Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons;

Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle;

Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver;

Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield);

Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

AM#4

(End of Summary of Changes)

EXPAND BUCKNER FIELD HOUSE FTR198

SECTION 01 19 30.00 29

SPECIAL ITEMS

PART 1 GENERAL

1.1 SCOPE

Items included in this section cover special features and/or requirements which are not otherwise specified or indicated.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E 1527 (1993) Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-04 Samples

Color Boards; G.

SD-05 Design Data

Color Boards; G.

Temporary Site Electrical Plan; G

Doyon Utilities' Service Application Form

SD-06 Test Reports

SECTION 01 19 30.00 29 Page 1

Video DVDs

SD-07 Certificates

Color Boards; G.

SD-11 Closeout Submittals

Video DVD Of Tests And O & M Training.

1.4 ACCIDENT PREVENTION PLAN

The Contractor shall obtain the Contracting Officer's approval of the Accident Prevention Plan required by the Safety and Health Requirements Manual referenced in paragraph Accident Prevention of the Contract Clauses prior to start of any work at the project site.

1.5 FIRE SAFETY

The Contractor shall obtain a permit from the organization having jurisdiction over the job site for any welding or open flame work.1.5.1

Welding Permit

The Contractor shall obtain AF Form 592 "USAF Welding, Cutting, and Brazing Permit" (copy attached to this section) from the Installation Fire Chief prior to any welding operations. Welding shall conform to AFOSHSTD91-5 and requires inspection and approval by the Installation Fire Department.

1.6 PERMANENT UTILITIES

The Contractor is responsible for submitting all work plans for permanent or temporary utilities to Doyon Utilities for approval, a minimum of 30 working days prior to when requested services are needed.

The utility system infrastructure for water, sewer, natural gas and electricity on Fort Richardson has been privatized and is owned by Doyon Utilities, LLC (DU). Permanent utility systems (water, sewer, electricity) will be installed by DU up to the demarcation point. The Contractor shall coordinate directly with DU on all aspects of contract work that will interface with DU's installation of permanent utilities to facility including, but not limited to, schedule, access, safety, SWPPP, and areas/details of the interface. The Contractor shall also coordinate directly with DU for removal and relocation of any existing permanent utilities on the project site, which conflicts with or prevents new construction in accordance with project plans. The Government will not serve as an intermediary or coordinator between the Contractor and DU. The Contractor shall remain responsible for meeting all contract requirements and for providing a complete and operable facility for use no later than the contract completion date required by FAR 52.211-10 of the contract.

Also, reference FAR 52.236-8, Other Contracts, regarding the requirement to fully cooperate with other Contractors on the site and not interfere with the performance of their work.

1.7 TEMPORARY UTILITY SERVICES

The Government will make all reasonably required utilities available to the Contractor from existing power, and water outlets, for the Contractor's temporary use during construction at a charge to the Contractor. The Contractor shall carefully conserve any utilities furnished without charge.

SECTION 01 19 30.00 29 Page 2

The Contractor is responsible for coordinating with Doyon Utilities to extend temporary lines and for any fees and expenses associated with providing and maintaining necessary temporary connections, meters, and distribution lines. AM#3... For Utility rates please Contact:

Sonny Turpin, PMP JBER - Utilities Engineer

673 CES/CEAO

724 Postal Service Loop

JBER AK 99505

907-384-2763 griffith.turpin@elmendorf.af.mil

...AM#3

a. The Contractor should not assume that permanent utilities will be installed to the facility at a time most convenient for the Contractor, and may want to consider obtaining access to temporary utility services. DU will extend temporary service to contractors performing work on the Installation when requested by the Government and the Contractor. The Contractor shall provide written notification to DU, copy furnish the Government, a minimum of 30 working days prior to when requested services are needed. Written notification shall be provided using Doyon Utilities' Service Application Form. As a minimum, the request will include requested date of temporary service installation, expected duration of the connection, a description of requested connection, and the name, title, and phone number of Contractor Point of Contact responsible for coordinating the temporary service connection with DU. The Contractor shall be responsible for any fees charged by DU to extend/provide temporary utility lines to project site and making any required connections to Contractor provided equipment.

b. The Contractor shall submit a Temporary Site Electrical Plan for Government and Doyon Utilities approval. The Contractor shall comply with all applicable rules and regulations. The temporary site electrical plan shall identify safety procedures to include lock-out/tag-out procedures, NEC and NESC safety requirements.

c. Doyon Utilities must review and approve plans for disinfecting and preventing contamination/cross-connection from any temporary water supply connection; and DU must operate the valve that charges/opens any temporary connection. The Contractor shall provide the documentation and coordination to facilitate these actions as applicable.

d. DU will install meters on the temporary utility lines it extends to the project site. The Contractor shall reimburse the Government for use of temporary utility services. The Contractor shall carefully conserve any utilities furnished without charge.

e. Before completion of the work and final acceptance of the work by the Government, the Contractor shall notify the Contracting Officer and Doyon Utilities, in writing, 5 working days before termination is desired. Doyon Utilities will take a final meter reading and disconnect service. DU and the Contractor shall then remove their respective temporary distribution lines and associated paraphernalia. The Contractor shall be responsible for any costs or fees charged by Doyon Utilities for disconnecting, and shall pay all outstanding utility bills before final acceptance of the work by the Government.

SECTION 01 19 30.00 29 Page 3

1.8 DISPOSITION OF MATERIALS

Combustible and noncombustible waste material shall be disposed of . No burning will be permitted.

1.8.1 Disposal of Soils

No existing soil stockpile shall be moved from its present location without written permission from the Contracting Officer. No soils shall be removed from the installation for off-site disposition. Soils may be temporarily removed from the installation when approved for off-site remediation. Such soils shall be properly tracked and fully accounted for until returned to the installation and shall not be mixed with other soils at any time.

1.8.2 Salvageable Material

Salvageable material, if not otherwise indicated, shall become the property of the Contractor. The value of such salvage shall be reflected in the contract price.

1.9 TESTS

The Contractor shall provide testing, except where specifically noted to be performed by the Government, in accordance with SECTION 01 45 04.00 10

CONTRACTOR QUALITY CONTROL.

1.10 WARRANTY OF CONSTRUCTION

Refer to Section 00 72 00 FAR Clause 52.246-21.

1.10.1 Failures

Upon receipt of notice from the Government of failure of any part of warranted items during the warranty period, the affected part or parts shall be promptly replaced. Such replacement shall include furnishing and installing the necessary new part or parts, making all necessary repairs, restoring the affected item to the operating condition specified in this contract and making all such tests as are necessary to ensure that there are no remaining defects. Such tests shall be performed in the presence of representatives of the Using Agency indicated below. Upon final acceptance of the work or transfer of responsibility to the Government for operation and maintenance of the items covered, whichever is earlier, the Contractor shall be responsible to the Using Agency for the warranty provisions of this contract. A letter stating the applicable warranty provisions shall be furnished to the Contracting Officer in duplicate, in the format and text shown in the sample letter attached to this section.

1.11 CAMP FACILITIES

There are no Government owned camp facilities at the jobsite for the Contractor's use.

AM#4...

1.12 GOVERNMENT FIELD OFFICES

Provide the Government Resident Engineer with an office, approximately 19 square meters 200 square feet in floor area, located where directed and providing space heat, electric light and power, and toilet facilities

SECTION 01 19 30.00 29 Page 4 consisting of one lavatory and one water closet complete with connections to water and sewer mains. Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. Include a 1200 by 2400 mm 4 by 8 foot plan table, computer work space a standard size office desk and chair, and telephone. At completion of the project, the office will remain the property of the Contractor and be removed from the site. Utilities will be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer.

1.13 FURNISHINGS FOR GOVERNMENT FIELD OFFICE

The Government field office specified shall be furnished with one desk, one drawing layout table, three chairs, a four-drawer vertical or two-drawer lateral file cabinet, a plain paper FAX machine, a business telephone with answering machine, a portable copier with automatic document feed. The telephone and FAX machine shall have single party lines, different from each other, and separate from the Contractor's phone line(s). The Contractor shall provide a 1 MB DSL multiple connection with a CISCO PIX Box or equivalent connectivity through cable modem to be used by government employees to connect their laptop computers. The Contractor is encouraged to contact USACE-IT at 1-866-562-2348 for hook up requirements or assistance. The Contractor shall provide sufficient electrical outlets for all equipment. All costs shall be borne by the Contractor and included in the contract price, except that long distance charges incurred by the Government representative will be paid for by the Government upon arrangement with the Contracting Officer. ...AM#4

1.14 PARTNERING

The Government intends to encourage the foundation of a cohesive partnership with the Contractor and its subcontractors. This partnership will be structured to draw on the strengths of each organization to identify and achieve reciprocal goals. The objectives are effective and efficient contract performance, intended to achieve completion within budget, on schedule, and in accordance with plans and specifications.

This partnership will be bilateral in makeup, and participation will be totally voluntary. Implementation of this initiative will be a topic of discussion at the Preconstruction Conference. Other recurring or special purpose meetings, as agreed between the Government and the Contractor, will be held as necessary to resolve contentious issues and maintain the partnering spirit.

1.15 FINISH MATERIALS SUBMITTALThe Contractor shall obtain the services of a professional interior designer. The interior designer shall be a member of the American Society of Interior Designers (ASID) or a member of the Institute of Business Designers (IBD).The Contractor shall prepare color boards based on materials that comply with the contract. Boards shall be of professional quality, in 8 1/2 X 11 inch format on illustration board backing. Boards shall consist of actual samples and color chips.

Materials that will be adjacent in their installed locations shall be adjacent on the board. Boards shall indicate proportion of areas where finishes will be applied (e.g., accent finish small relative to field finish). A key shall be provided on the back of each board relating colors and materials to manufacturers' identification, contract finish schedule, and installed location.

A color board is available for inspection in the office of the U.S. Army

SECTION 01 19 30.00 29 Page 5

Corps of Engineers, Alaska District. Contact the Project Manager at (907) 753-2804.

Submittals for all interior and exterior finish materials, including paints (factory or field applied), wall coverings, floor coverings, acoustical ceilings, toilet partitions, window coverings, plastic laminates, non-ferrous metal finishes and natural wood finishes, shall be submitted in one complete package. The submittal shall include colors, patterns, textures and manufacturers' designations and shall be submitted for approval by the Contracting Officer within 120 days after Notice to Proceed. Hardware, doors, windows, electrical outlet cover plates, fire alarm components, mechanical ventilation components and all other specified items may be submitted separately. All specified samples, manufacturer's data and certificates necessary to demonstrate quality and conformance with the contract requirements shall be included.

The Contractor shall submit color boards at least 60 days in advance of the date approval is needed. A new set of color boards shall be submitted if the Contractor deviates from the approved color boards.

The Contractor shall furnish 4 copies of the complete color boards.

1.16 OPERATION AND MAINTENANCE (O & M) MANUALS

Six copies shall be submitted to the Contracting Officer not later than 30 days prior to scheduled contract completion. Failure to submit manuals by this date will be considered cause to withhold any payments due the Contractor. All equipment manual materials shall be durable, clearly printed or reproduced copies, not more than 8-1/2 x 11 inches in size, or neatly folded to that size without overlapping into the binding. Materials shall be indexed and bound in stiff covers with tab separators. Approval of manuals shall be obtained prior to scheduling operating tests and field training courses.

1.17 Video DVD Of Tests And O & M Training

The Contractor shall Video DVDstests and operation and maintenance training sessions required in the technical specifications for mechanical, fire protection and electrical features. The Contractor shall provide training, video and hands on instruction for HVAC, environmental and paint booth systems. Training shall include CE/HVAC and user personnel. DVD's shall be produced in digital format on DVDs, and of professional quality.

Approval of applicable O & M manuals shall be obtained and manuals provided on site at least 3 days prior to tests and training as specified. Each system or piece of equipment shall be covered in a single DVD or set of DVD's which shall be correlated with the approved O & M manuals. DVD's shall be categorized and indexed by equipment and item of repair, with a typed or printed label showing the project, equipment or system and contract number; this same information shall be provided as an introduction on each DVD. One copy of the recorded material shall be submitted to the Contracting Officer, for review, within ten (10) days after completion of the recorded training session. Coverage shall include, as applicable::

a. Testing, trouble-shooting, repair of heating, ventilation, diesel-generator and boiler controls.

b. Demonstration of common maintenance items, i.e. system tests (efficiency and operability), cleaning, adjustment, replacement of high

SECTION 01 19 30.00 29 Page 6 failure items, scheduled maintenance, tear down and repair of specific items, etc.

c. Testing of fire suppression and detection systems. Resetting of systems after activation. Trouble-shooting, actual maintenance and repair of specific components, etc.

d. How to verify system performance and operating parameters (i.e.

flows, temperatures, pressures, amperage draw, etc.).

1.18 HEALTH HAZARD ASBESTOS

Minor amounts of asbestos may be present within building materials encountered while working with existing insulation, piping and equipment.

The Contractor shall determine the presence of asbestos and, if present, notify the Contracting Officer immediately and provide safeguards and disposal methods, including work practices, respiratory protection and industrial hygiene measures, that satisfy 29 CFR 1910 and 29 CFR 1926.58.

An equitable adjustment will be made to the contract for additional work required if asbestos is present. Removal and disposal shall also satisfy 40 CFR 61.140 through 61.156, with disposal satisfying 61.146(c)(1).

1.19 NON-GOVERNMENT BORROW SOURCES

The Contractor shall check any non-Government, proposed borrow sources for the presence of hazardous substances and petroleum products as defined in ASTM E 1527. The publication includes guidance on previously examined sites. A Phase I Environmental Site Assessment, also as defined therein, shall be submitted for each proposed borrow site as a supplement to the Environmental Protection Plan specified in SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION. The report shall identify any previous or current presence of hazardous substances at the site, regardless of whether they have been, or can be, released to the environment. The Assessment shall be performed under the direct supervision of an independent, registered professional engineer, currently licensed by the State in which the borrow source is located, and within such time frame as will ensure reports are valid when submitted. The engineer shall have a minimum of 3 years experience in performing satisfactory Environmental Site Assessments. All reports shall be certified in writing by the engineer and submitted in the standard format specified in the referenced publication, through the Contracting Officer, to the Base Environmental Office for review. Reports shall be submitted at least 30 days prior to needing borrow materials in the work. The qualifications of the engineer performing the Assessment shall be included with the report. Where hazardous materials are indicated, use of the source will not be allowed.

No borrow materials shall be brought onto Government property without approval of the Contracting Officer. The Government reserves the right to sample and test any borrow materials delivered to the project for conformance with this specification.

1.20 BIRDS' PROTECTION

Migratory Birds: All migratory birds are of concern, as stated in the Migratory Bird Treaty Act;Once a nest has been established and eggs laid, it is against Federal law to disturb the nest or annoy the birds in an attempt to get them to abandon the nest. It is also recommended that clearing of grass and scrub land, as well as forested areas occur before 1 May or after 15 July to minimize impacts on ground and tree nesting birds.

Design and construction shall also comply with the Bald and Golden Eagle

SECTION 01 19 30.00 29 Page 7

Protection Act. In general, laws regarding birds are relevant to each new season. The non-observance or apparent absence of birds or their nests during the NEPA process does not mean that an area is free of birds or their nests just prior to construction. The area must be cleared prior to construction and, if necessary, permits must be obtained prior to construction.

The Contractor is responsible for all or any delays and charges filed by U.S. Fish and Wildlife Service and the State of Alaska Department of Public Safety due to his/her negligence in removing and/or annoying such established nests.

Any nests observed or wildlife issues within the project area during this project should be brought to the immediate attention of an EAFB wildlife biologist. Matt Moran, 3 CES/CEANC, (907)552-2130.

1.21 WEEKLY COORDINATION MEETINGS

The Contractor shall participate in weekly/Monthly coordination meetings with the Contracting Officer and other Government representatives-as applicable. The Contractor shall be responsible for preparing the agenda in coordination with the Contracting Officer, distributing the agenda, conducting the meeting, preparing the meeting minutes, distributing the minutes, and tracking action items. The Contractor's superintendent and QC System Manager shall attend each meeting. Typical topics shall consist of but not limited to the following: review of the previous week's activities and progress; forecast of the following two week's activities and progress;

upcoming utility outage or street closure; status of shop drawing submittals and reviews; status of outstanding requests-for-information (RFI); status of pending modifications; anticipated modifications; proposed schedule changes; other concerns/and or issues.

1.22 RED ZONE MEETING

Initial Red Zone Meeting (IRZM) At approximately 75% completion, but not less than 60 days from anticipated completion, the Contractor shall participate in the Initial RED ZONE Meeting (IRZM). The Contractor shall be responsible for contributing to the agenda in support of the Administrative Contracting Officer (ACO) and the Alaska District Project Manager. The Government is responsible for distributing the agenda, conducting the meeting, preparing the minutes, distributing the minutes, and assigning action items. The purpose of the IRZM is to coordinate all of the activities leading up to project acceptance by the customer as well as completing contract and project closeout.

Items to be discussed include, but are not limited to, the following:

verify O&M manual requirements and submittal dates; review status of all outstanding submittals; verify spare parts, keys, etc.; turnover requirements and turnover dates; acceptance inspection and final acceptance; LEED documentation; identify and schedule all tests to be witnessed by Government personnel; mechanical system tests and balances;

commissioning; training sessions; preliminary as-built submittals; final as-built submittals; warranty conference; building interior inspections;

separate building exterior inspections, if necessary before snowfall; final utility readings; erosion control and turf requirements; installation of specialized equipment and communications infrastructure; permanent keys for building, whose responsibility and when…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .