DWGS-FTR198-AM 5.pdf

PDF 463 KB Posted

Attached to
FTR198 - Buckner Physical Fitness Facility Expansion, JBER, Alaska
Solicitation number
W911KB-11-R-0023
Issued by

About this file

Revised Drawings

View the file

Other files

File Type Posted
Amendment 6.pdf PDF
J A Sole Source Items for FBO.pdf PDF
Amendment 5.with replacement pages.pdf PDF
SF30 Amendment 4 with replacement pages.pdf PDF
ufc_4_750_07 Aquatic Facilities.pdf PDF
SF30 Amendment 3.pdf PDF
Site Visitor Attendees List.pdf PDF
Design Guide - PFF —
AM2 SF30.pdf PDF
AM2 SF30.pdf PDF
SF30 AM 1.pdf PDF
SECTION 00 22 10 ATTACHMENTS.pdf PDF
FTR198-RFP.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 G-001 COVER SHEET

2 G-002 INDEX SHEET

12 E-101 ELECTRICAL SITE PLAN REVISED

18A E-501 COMM TRENCH AND VAULT DETAIL

19 E-601 ELECTRICAL ONE-LINE DIAGRAM

ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS

RFP NO. W911KB-11-R-0023

AM#5 - FTR198/PN 061515, 28 FEB 2012

JBER - RICHARDSON, AK

REF.

NUM.

SHEET TITLESHT

REF.

NUM.

SHEET TITLESHT

REF.

NUM.

SHEET TITLESHT

REF.

NUM.

SHEET TITLESHT

REF.

NUM.

SHEET TITLESHT

5 SHEETS CHANGED, IN BOLD, ON THIS AMENDMENT

PHYSICAL

FITNESS

CENTER

ELECTRICAL SITE PLAN DRAWING

BUCKNER FIELD HOUSE EXPANSION, FTR198

SEE ELECTRIC/TELECOM ROOM ENLARGED

FLOOR PLAN FOR LAYOUT OF EXISTING

EQUIPMENT.

PROPOSED LOCATION FOR

CONTRACTOR PROVIDED

EXTERNAL MANUAL SAFETY SWITCH AND

EXTERNAL QUICK DISCONNECT PANEL

SOLUTION ALTERNATIVE.

EXISTING UTILITY CORRIDOR. SEE EXHIBITION

AS-BUILT DRAWINGS.

DOYON UTILITY PROVIDED EXTERNAL

DISCONNECT SWITCH, ELECTRIC METER AND

CURRENT TRANSFORMER

DETAILED NOTES:

NEW BASEBALL FIELD

EXISTING EXPRESSO

STAND TO MAINTAIN

NEW PARKING LOT LIGHTS

SUPPLIED BY DOYON UTITITIES.

EXISTING

FEEDER 9

PROPOSED

NEW DOOR

TO MEET NEC

DOYON UTILITES

SHALL REMOVE AND

DISCARD EXISTING

PAD MOUNTED

TRANSFORMER,

ELECTRIC METER,

SERVICE ENTRANCE,

PRIMARY OVERHEAD/

COMM RM

ELECTRIC/

EXISTING FEEDER 12

EXTENSION

PROPOSED LOCATION OF NEW

EQUIPMENT FOR ATHLETIC FIELD

POWER, AND PARKING LOT LIGHTING.

EXTERIOR DISCONNECT PROVIDED

BY DOYON UTILITIES (THE POINT OF

DEMARCATION).

PROPOSED LOCATION OF NEW PAD

MOUNTED TRANSFORMER SUPPLIED

BY DOYON UTILITIES

PRIMARY

DISTRIBUTION

PROVIDED BY

DOYON

UTILITIES.

NEW 20,000 SQ FT PARKING LOT

NEW SOFTBALL FIELD

NEW SOFTBALL FIELD

TO 3 EACH ATHLETIC FIELD

SCOREBOARDS AND ONE

NEMA 3R WEATHERPROOF

EXTERIOR OUTLET FOR EACH

ATHLETIC FIELD, STUBBED UP.

PROVIDED BY CONTRACTOR.

PROPOSED LOCATION OF NEW PAD

MOUNTED TRANSFORMER SUPPLIED BY

DOYON UTITITIES. PRIMARY

DISTRIBUTION PROVIDED BY DOYON

UTILITIES.

UNDER-GROUND

CABLE AND UTILITY

EXISTING UTILITY POLES CONTAINING

OVERHEAD ELECTRIC PRIMARY AND

GCI COAXIAL CABLE

CHILD CARE FACILITY

NEW DOYON UTILITIES

EXTERIOR DISCONNECT

POWER DURING

CONSTRUCTION

EXISTING SHED

STAND TO MAINTAIN

POWER DURING

CONSTRUCTION

WITH MINIMAL DOWN

TIME.

WITH MINIMAL DOWN

TIME

ELECTRIC FROM EXISTING

SWITCHBOARD

ELECTRIC FROM EXISTING

SWITCHBOARD

BASEMENT

WITH UTILIDOR

ENTRANCE

BELOW

POLE

ELECTRIC ROOM

CHILD CARE FAC

File details come from the government source that posted it. Updated .