SECTION 00 22 10 ATTACHMENTS.pdf

PDF 59 KB Posted

Attached to
FTR198 - Buckner Physical Fitness Facility Expansion, JBER, Alaska
Solicitation number
W911KB-11-R-0023
Issued by

About this file

Section 00 22 10 Attachments 1- 5

View the file

Other files

File Type Posted
Amendment 6.pdf PDF
DWGS-FTR198-AM 5.pdf PDF
J A Sole Source Items for FBO.pdf PDF
Amendment 5.with replacement pages.pdf PDF
SF30 Amendment 4 with replacement pages.pdf PDF
ufc_4_750_07 Aquatic Facilities.pdf PDF
SF30 Amendment 3.pdf PDF
Site Visitor Attendees List.pdf PDF
Design Guide - PFF —
AM2 SF30.pdf PDF
AM2 SF30.pdf PDF
SF30 AM 1.pdf PDF
FTR198-RFP.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTR198 W911KB-11-R-0023

Section 00 22 10 Page 1

SECTION 00 22 10 - ATTACHMENT 1

PROPOSAL DATA SHEET

(1) Name of Solicitation:

(2) Name of Firm:

Address:

Phone:

Fax:

E-mail:

DUNS # (used for accessing the Construction Contractor Appraisal Support System (CCASS) or A-E Contractor Administration Support System (ACASS) Database)

Also provide any other assigned number that identifies the member firm(s) in the ACASS or CCASS databases. If a separate DUNS has been created for a joint venture (J-V) it must also be submitted.

Provide a DUNS number for each company identified in any proposed Contractor-subcontractor association of firms. If the firm is a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association. Provide DUNS for each.

Firm 1:

Firm 2:

Firm 3:

Nature of Association:

(3) AUTHORIZED NEGOTIATORS. FAR 52.215-11

The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).

[List names, titles, and telephone number of the authorized negotiator.] Name of Person Authorized to Negotiate:

Negotiator's Address:

Negotiator's Telephone:

Negotiator’s E-mail:

Section 00 22 10 Page 2

SECTION 00 22 10 - ATTACHMENT 2

COMPANY SPECIALIZED EXPERIENCE

CONSTRUCTION OR PRIME CONTRACTOR

Provide the following information to show examples of projects your company constructed within the last six years indicating experience with projects of similar type and scope. Use one form per project.

(a) Type of Facility Represented____________________________________________________________

(b) Your Firm’s Name ________________________________________________________________________

(c) Name of Project (Include contract number if Federal project)_______________________________________

(d) Location of Project________________________________________________________________________

(e) Owner _________________________________________________________________________________

(f) General Scope of Construction Project ________________________________________________________

(g) Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed :

(h) Construction Cost ________________________________________________________________________

(i) Extent and Type of Work You Subcontracted Out _______________________________________________

(j) Dates Construction: Began___________________ Completed______________

(k) Your Performance Evaluation by Owner, if known _______________________________________________

(l) Were You Terminated or Assessed Liquidated Damages? ________________________________________

(If either is “Yes”, attach an Explanation)

(m) Owner’s Point of Contact for Reference (Name and Company) _____________________________________

(n) Current Telephone Number of Reference POC__________________________________________________

Section 00 22 10 Page 3

(o) Current Email Address of Reference POC______________________________________________________

Section 00 22 10 Page 4

SECTION 00 22 10 - ATTACHMENT 3

DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY

Provide the following information to show examples of projects your company constructed within the last six years indicating experience with projects of similar type and scope. Use one form per project.

(a) Type of Facility Represented ___________________________________________________________

(b) Your Firm’s Name ________________________________________________________________________

(c) Name of Project (Include contract number if Federal project)_______________________________________

(d) Location of Project________________________________________________________________________

(e) Owner _________________________________________________________________________________

(f) General Scope of Construction Project _______________________________________________________

(g) Summary of Your Role in Design of this Project, including implementing LEED

(h) Identify Estimated (“E”) or Actual (“A”) Construction Cost _________________________________________

(i) Extent and Type of Work You Subcontracted __________________________________________________

(j) Dates Design: Began___________________ Completed______________

(k) Dates Construction: Began___________________ Completed______________

(l) Your Performance Evaluation, if known ______________________________________________________

Were You Terminated or Assessed Liquidated Damages? ___________________________________________

(If either is “Yes”, attach an Explanation)

(m) Owner’s Point of Contact for Reference (Name and Company) _____________________________________

(n) Current Telephone Number of Reference POC_________________________________________________

Section 00 22 10 Page 5

(o) Current Email Address of Reference POC_____________________________________________________

Section 00 22 10 Page 6

SECTION 00 22 10 - ATTACHMENT 4

KEY SUBCONTRACTOR

Provide the following information to show examples of projects your company constructed within the last six years indicating experience with projects of similar type and scope. Use one form per project.

(a) Type of Facility Represented _________________________________________________

(b) Your Firm’s Name ______________________________________________________________

(c) Name of Project (include Federal Contract Number if applicable)______________________________

(d) Owner _______________________________________________________________________

(e) General Scope of Construction Project

(f) Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed :

(g) Your Contract or Subcontract Amount __________________________________________________

(h) Detailed Description of Your Self-Performed Work ________________________________________

(i) Describe any Work You Subcontract to Others ___________________________________________

(j) Dates Your (sub) contract: Started___________________ Completed______________

(k) Your Performance Evaluation by Owner, if any ___________________________________________

By Prime: ___________________________________________________________________________

(l) Were You Terminated or Assessed Liquidated Damages? __________________________________

(If either is “Yes”, attach an Explanation)

(m) Name and Company of Point of Contact (POC) for reference (If you were a subcontractor, also list the firm you were hired by): _______________________________________________________________

(n) Current Telephone Number of Reference POC ___________________________________________

Section 00 22 10 Page 7

(o) Current Email Address of Reference POC _______________________________________________

Section 00 22 10 Page 8

SECTION 00 22 10 - ATTACHMENT 5

PAST PERFORMANCE QUESTIONNAIRE

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

Section 00 22 10 Page 9

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE

AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE

THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE

HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.

HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT

THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT

TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

Section 00 22 10 Page 10

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

Section 00 22 10 Page 11

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U

N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U

N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U

N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U

N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

Section 00 22 10 Page 12

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

PROPOSAL DATA SHEET
CONSTRUCTION OR PRIME CONTRACTOR
DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY

File details come from the government source that posted it. Updated .