Updated TE H Periodic Hydraulic Test Checklist.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Elevator Maintenance Federal contract opportunity
- Solicitation number
- W91151-24-R-0025
- Issued by
- Department of the Army
About this file
This document appears to be a Technical Exhibit containing a Periodic Hydraulic Test Checklist for a specific building's elevator system. The checklist covers various required periodic tests for hydraulic elevators per the Statement of Work, including checks of the relief valve setting, system pressure, normal and final terminal stopping devices, governors, safeties, oil buffers, emergency operations, and other components. The checklist also includes sections for documenting the technician's name, date, time, and comments.
The related federal contract opportunity is for Elevator Maintenance services at the Fort Cavazos Military Installation. The solicitation is seeking a contractor to provide non-personal services for preventative maintenance and repairs on approximately 62 elevator systems across 39 facilities. The contract will require the contractor to maintain the elevator systems in a safe, reliable, and satisfactory operating condition per manufacturer specifications. The contract will allow for changes to the elevator inventory as new construction, demolition, and facility renovations occur.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE I
| TECHNICAL EXHIBIT H |
| PERIODIC HYDRAULIC TEST CHECKLIST |
| BUILDING NUMBER: BUILDING CONTACT: |
| TECHNICIAN NAME: DATE: |
| TIME IN: TIME OUT: TOTAL HOURS: |
| ELEVATOR SYSTEM NUMBER |
| HYDRAULIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY ONE (12 MONTHS) |
| WITHOUT SAFETIES, GOVERNORS, AND OIL BUFFERS |
| RELIEF VALVE SETTING & SYSTEM PRESSURE TEST |
| CYLINDER |
| ADDITIONAL TEST |
| (a )NORMAL & FINAL TERMINAL STOPPING DEVICES |
| (b) GOVERNORS |
| (c) SAFETIES |
| (d) OIL BUFFERS |
| (e) FIREFIGHTER'S EMERGENCY OPERATION |
| (f) STANDBY OR EMERGENCY OPERATION |
| (g) POWER OPERATIONS OF DOOR SYSTEM |
| (h) EMERG. TERMINAL SPEED LIMITING DEVICE AND EMERG. TERMINAL STOPPING DEVICE |
| (I) LOW OIL PROTECTION OPERATION |
| FLEXIBLE HOSE & FITTING ASSEMBLIES |
| PRESSURE SWITCHES |
| HYDRAULIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY FIVE (60 MONTHS) |
| GOVERNORS,SAFETIES,OIL BUFFERS WERE PROVIDED |
| COATED ROPES |
| WIRE ROPE FASTENINGS |
| COMMENTS: |
| TECHNICIAN SIGNATURE: DATE: |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .