TE H Periodic Hydraulic Test Checklist.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Elevator Maintenance Federal contract opportunity
Solicitation number
W91151-24-R-0025
Issued by
Department of the Army

About this file

This document is a Technical Exhibit H Periodic Hydraulic Test Checklist for an elevator system. It outlines the required Category One (12 months) and Category Five (60 months) periodic tests for a hydraulic elevator system, including verifying relief valve settings, terminal stopping devices, governors, safeties, oil buffers, fire service operation, and other system components. The related federal contract opportunity is for elevator maintenance services at the Fort Cavazos Military Installation, which includes approximately 62 elevator systems across 39 facilities. The contractor shall provide non-personal services for elevator preventative maintenance and repairs to maintain the systems in a safe, reliable, and satisfactory operating condition per manufacturer specifications. The contract may be subject to changes in the elevator inventory due to new construction, demolition, and facility renovations, with updates provided quarterly.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE I

TECHNICAL EXHIBIT H
PERIODIC HYDRAULIC TEST CHECKLIST
BUILDING NUMBER: BUILDING CONTACT:
TECHNICIAN NAME: DATE:
TIME IN: TIME OUT: TOTAL HOURS:
ELEVATOR SYSTEM NUMBER
HYDRAULIC ELEVATOR A17.1- 8.11.3.2. CHECK LIST PERIODIC TEST REQ. CATEGORY ONE (12 MONTHS)
WITHOUT SAFETIES, GOVERNORS, AND OIL BUFFERS
RELIEF VALVE SETTING & SYSTEM PRESSURE TEST 8.11.3.2.1
CYLINDER 8.11.3.2.2
ADDITIONAL TEST 8.11.3.2.3
(a )NORMAL & FINAL TERMINAL STOPPING DEVICES 8.11.2.2.5
(b) GOVERNORS 8.11.2.2.3
(c) SAFETIES 8.11.2.2.2
(d) OIL BUFFERS 8.11.2.2.1
(e) FIREFIGHTER'S EMERGENCY OPERATION 8.11.2.2.8
(f) STANDBY OR EMERGENCY OPERATION 8.11.2.2.7
(g) POWER OPERATIONS OF DOOR SYSTEM 8.11.2.2.8
(h) EMERG. TERMINAL SPEED LIMITING DEVICE AND EMERG. TERMINAL STOPPING DEVICE 3.25.2
(I) LOW OIL PROTECTION OPERATION 3.26.9
FLEXIBLE HOSE & FITTING ASSEMBLIES 8.11.3.2.4
PRESSURE SWITCHES 8.11.3.2.5
HYDRAULIC ELEVATOR A17.1- 8.11.2.3. CHECK LIST PERIODIC TEST REQ. CATEGORY FIVE (60 MONTHS)
GOVERNORS,SAFETIES,OIL BUFFERS WERE PROVIDED 8.11.3.4.1
COATED ROPES 8.11.3.4.2
WIRE ROPE FASTENINGS 8.11.3.4.3
COMMENTS:
TECHNICIAN SIGNATURE: DATE:

Sheet2

Sheet3

File details come from the government source that posted it. Updated .