Updated TE G Periodic Traction Test Checklist.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Elevator Maintenance Federal contract opportunity
Solicitation number
W91151-24-R-0025
Issued by
Department of the Army

About this file

This document is a TE G Periodic Traction Elevator Test Checklist. It outlines the periodic testing requirements for electric elevators in accordance with the Performance Work Statement (PWS) Section 5.10. The checklist covers the inspection and testing of components such as oil buffers, safeties, governors, slack rope devices, terminal stopping devices, firefighters' emergency operation, and power door operation, among others. The checklist indicates that these tests are required annually (Category One) and every 5 years (Category Five). The related federal contract opportunity is for the Elevator Maintenance at the Fort Cavazos Military Installation, which requires the contractor to perform preventative maintenance and repairs on approximately 62 elevator systems located in 39 facilities. The contract is under NAICS code 238290.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE H

TECHNICAL EXHIBIT G
PERIODIC TRACTION ELEVATOR TEST CHECKLIST
BUILDING NUMBER: BUILDING CONTACT:
TECHNICIAN NAME: DATE:
TIME IN: TIME OUT: TOTAL HOURS:
INSPECTION TYPE (Circle One) 1 YR 5YR
ELEVATOR SYSTEM NUMBER
ELECTRIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY ONE (12 MONTHS)
OIL BUFFERS
SAFETIES
GOVERNORS
SLACK ROPE DEVICES ON WINDING DRUM MACHINES
NORMAL & FINAL TERMINAL STOPPING DEVICES
FIREFIGHTERS' EMERGENCY OPERATION
STAND-BY OR EMERGENCY POWER OPERATION
POWER OPERATION OF DOOR SYSTEM
BROKEN ROPE,TAPE, OR CHAIN SWITCH
ELECTRIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY FIVE (60 MONTHS)
CAR & COUNTER WEIGHT SAFETIES
GOVERNORS
OIL BUFFERS
BRAKING SYSTEM
EMERGENCY & STAND-BY POWER OPERATION
EMERGENCY TERMINAL STOPPING AND SPEED LIMITING DEVICES
POWER OPENING OF DOORS
LEVELING ZONE & LEVELING SPEED
INNER LANDING ZONE
EMERGENCY STOPPING DISTANCE
COMMENTS:
TECHNICIAN SIGNATURE: DATE:

Sheet2

Sheet3

File details come from the government source that posted it. Updated .