Updated TE G Periodic Traction Test Checklist.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Elevator Maintenance Federal contract opportunity
- Solicitation number
- W91151-24-R-0025
- Issued by
- Department of the Army
About this file
This document is a TE G Periodic Traction Elevator Test Checklist. It outlines the periodic testing requirements for electric elevators in accordance with the Performance Work Statement (PWS) Section 5.10. The checklist covers the inspection and testing of components such as oil buffers, safeties, governors, slack rope devices, terminal stopping devices, firefighters' emergency operation, and power door operation, among others. The checklist indicates that these tests are required annually (Category One) and every 5 years (Category Five). The related federal contract opportunity is for the Elevator Maintenance at the Fort Cavazos Military Installation, which requires the contractor to perform preventative maintenance and repairs on approximately 62 elevator systems located in 39 facilities. The contract is under NAICS code 238290.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE H
| TECHNICAL EXHIBIT G |
| PERIODIC TRACTION ELEVATOR TEST CHECKLIST |
| BUILDING NUMBER: BUILDING CONTACT: |
| TECHNICIAN NAME: DATE: |
| TIME IN: TIME OUT: TOTAL HOURS: |
| INSPECTION TYPE (Circle One) 1 YR 5YR |
| ELEVATOR SYSTEM NUMBER |
| ELECTRIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY ONE (12 MONTHS) |
| OIL BUFFERS |
| SAFETIES |
| GOVERNORS |
| SLACK ROPE DEVICES ON WINDING DRUM MACHINES |
| NORMAL & FINAL TERMINAL STOPPING DEVICES |
| FIREFIGHTERS' EMERGENCY OPERATION |
| STAND-BY OR EMERGENCY POWER OPERATION |
| POWER OPERATION OF DOOR SYSTEM |
| BROKEN ROPE,TAPE, OR CHAIN SWITCH |
| ELECTRIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY FIVE (60 MONTHS) |
| CAR & COUNTER WEIGHT SAFETIES |
| GOVERNORS |
| OIL BUFFERS |
| BRAKING SYSTEM |
| EMERGENCY & STAND-BY POWER OPERATION |
| EMERGENCY TERMINAL STOPPING AND SPEED LIMITING DEVICES |
| POWER OPENING OF DOORS |
| LEVELING ZONE & LEVELING SPEED |
| INNER LANDING ZONE |
| EMERGENCY STOPPING DISTANCE |
| COMMENTS: |
| TECHNICIAN SIGNATURE: DATE: |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .