This document is an amendment to a solicitation for solid waste management services at Fort Hood, Texas. The amendment removes the requirement for the Program Manager position to hold a Professional Engineer license and revises language regarding license and experience requirements for key personnel, including the Project Manager, Landfill Manager, and Quality Control Manager. Offerors must now indicate their capability to obtain necessary licenses by the award date and provide copies of current licenses held by key personnel. The services required include refuse collection, compost center operations, and landfill operations for cantonment areas at Fort Hood. The response date and other proposal details are not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Solid Waste, newest first.
File Type Posted
Approved Amendment 6- 5 March 21-Solid Waste-W9115121R0009.pdf PDF
Attachment 2-Landfill Ticket Example 21-R-0009.pdf PDF
Approved Amendment 5- 26 Feb 21-Solid Waste-W9115121R0009.pdf PDF
Attachment 1-Compactor Power Picture.pdf PDF
Solid Waste Rev PWS 26 Feb 21.docx DOCX document
Approved Amendment 3- 16 Feb 21-Solid Waste-W9115121R0009.pdf PDF
Approved Amendment 2- 8 Feb 21-Solid Waste-W9115121R0009.pdf PDF
Beta Sam Revised Amendement Solicitation 8 Feb 21 Posting 21-R-0009.pdf PDF
Solid Waste Landfill Site Visit.pdf PDF
ApprovedAmendment-1-25Jan21.pdf PDF
Draft Amendment-1-Post Correct WD-UpdateSiteVisit -25Jan21etc.pdf PDF
TE-L Wage Determination 2015-5237 Rev 14 - dated-21Dec20.pdf PDF
Released Solicitation-14Jan21-Solid Waste-W9115121R0009.pdf PDF
Solid Waste PWS 12 Jan 21 V12.docx DOCX document
TE-V Fort Hood Special Events Calendar.pptx PPTX presentation
TE-Q Fort Hood Landfill Site Plan 1 Sep 2020.pdf PDF
TE-O Equipment Listing 6 Nov 2020.docx DOCX document
TE-K Org Chart 17 Jul 2020.pdf PDF
TE-E Customer ID 1 Jan 2021.xlsx XLSX spreadsheet
TE-P Container Placement Maps 6 Aug 2019.pdf PDF
TE-T North Fort Hood Cantonment Map.pdf PDF
TE-H Landfill Image 17 Jul 2019.pdf PDF
TE-A Landfill Permit 17 Jul 2019.docx DOCX document
TE-J Sample Report Form 17 Jul 2019.xlsx XLSX spreadsheet
TE-C Cantonment Roll Off-Compactor Container Locations 19 Nov 2020.xlsx XLSX spreadsheet
TE-U BLORA (Belton Lake Outdoor Recreation Area) Map.pdf PDF
TE-N Baseline Staffing 6 Nov 2020.docx DOCX document
TE-M WD Pricing Spreadsheet 11 Jan 2021.xlsx XLSX spreadsheet
TE-L Wage Determination 2015-5238 Rev 14 (5-27-2020) 1 Jan 2021.pdf PDF
TE-I HazMat Authorization Request 17 Jul 2019.xlsx XLSX spreadsheet
TE-D Bid Schedule 11 Jan 2021.xlsx XLSX spreadsheet
TE-R Fort Hood Main Cantonment Map.pdf PDF
TE-S West Fort Hood Cantonment Map.pdf PDF
TE-G Landfill Disposal Data 19 Nov 2020.xlsx XLSX spreadsheet
TE-F Grease Trap Inventory 14 Jan 2021.xlsx XLSX spreadsheet
TE-B Cantonment Refuse Container Locations 12 Jan 2021.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011447268-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment are as follow s. See Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115121R0009

X 9B. DATED (SEE ITEM 11)

14-Jan-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Feb-2021

CODE

MICC - FORT HOOD

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5025

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9115121R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been deleted:

WAGE DETERMINATION-2015-5237

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

PROTESTCORRECTIVEACTIONRESPONS

Block 14 – Continuation Sheet – Protest Corrective Action Response Note: The revised PWS shall be posted separate to beta.sam.

See Protest corrective action below:

1) Revised PWS to reflect:

‐ The Program Manager position requiring Professional Engineer (PE) License has been removed from the PWS and the Solicitation ‐ See revisions in PWS 2.1.11.1.1 – Contractor Key Personnel ‐ See revisions in PWS 2.1.11.1.5 – Qualification Standards ‐ See revisions in PWS 2.5.4.1 – Training, Physical Requirements, or other Expertise

Required ‐ Deliverables – A007 – reflects frequency as now indicated in 2.5.4.1

2) Revised Solicitation Amendment-4 to reflect:

‐ Definition of Key Personnel – are typically the employees considered essential to the successful performance of work. The Key Personnel considered for this requirement are

– Project Manager, Landfilll Manager and Quality Control Manager.

‐ In 52.212-2 - Subfactor 1 -under (e): Equipment and Staffing Plan – this information has been removed - The Project Manager shall be a registered Professional Engineer in the “State of Texas”

‐ In 52.212-2 – Subfactor 1 – under (e) - Revised information now reflects:

The current language that reflects (in 52.212-2-specfially for the Program Manager and Landfill Manager) – “Failure to provide this information shall result in this subfactor as unacceptable.

The Contractor shall provide a list and current licenses of all employees that are required to perform landfill operations in the State of Texas” – has been updated to read – “Offeror shall provide a written narrative to indicate they have the capability to possess the necessary license for this requirement not later than (NLT) the contract award date”. “The written narrative shall also acknowledge that a current legible photocopy of the individual’s license shall be provided NLT the contract award date”.

Revised:

W9115121R0009

52.212-2: The Project Manager shall have a current Texas Class A MSW (Municipal Solid Waste) License with a minimum of three (3) years’ experience operating a landfill and managing personnel that perform work under solid waste requirement. The Project Manager shall comply with requirements of The State of Texas - Texas Engineering and Land Surveying Practice Acts and Rules Concerning Practice and Licensure when submitting professional documents. The Project Manager shall maintain a Texas Class A Municipal Solid Waste (MSW) License for duration of contract and provide current license to COR upon renewal. Resume shall have a minimum of three (3) years of experience in managing personnel that perform work of the type required by this contract. The Contractor shall provide the name of the individual who is designated as the Project Manager at time of proposal submission. “Offeror shall provide a written narrative to indicate they have the capability to possess the necessary license for this requirement not later than (NLT) the contract award date”. “The written narrative shall also acknowledge that a current legible photocopy of the individual’s license shall be provided NLT the contract award date”. Failure to provide this information shall result in this subfactor as unacceptable.