TE-N Baseline Staffing 6 Nov 2020.docx

DOCX document 15 KB Posted

Attached to
Solid Waste Federal contract opportunity
Solicitation number
W91151-21-R-0009
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document contains a technical exhibit outlining the baseline staffing needs for a solid waste management contract opportunity with the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood, Texas. The technical exhibit estimates the quantity of various personnel required over a 60 month period to provide solid waste management services, including refuse collection, compost center operations, and landfill operations for the cantonment areas at Fort Hood. Specifically, it outlines an estimated need for 21.75 full time employees consisting of positions such as a project manager, quality control inspector, landfill manager, secretary, various truck drivers, a scale operator, laborers, a heavy equipment mechanic, and heavy equipment operators. The purpose of the technical exhibit is to generally assess the necessary personnel for an offeror to perform the solid waste management requirement.

View the file

Other files for this federal contract opportunity

Other files attached to Solid Waste, newest first.
File Type Posted
Approved Amendment 6- 5 March 21-Solid Waste-W9115121R0009.pdf PDF
Attachment 2-Landfill Ticket Example 21-R-0009.pdf PDF
Approved Amendment 5- 26 Feb 21-Solid Waste-W9115121R0009.pdf PDF
Attachment 1-Compactor Power Picture.pdf PDF
Approved Amendment 4- 26 Feb 21-Solid Waste-W9115121R0009.pdf PDF
Solid Waste Rev PWS 26 Feb 21.docx DOCX document
Approved Amendment 3- 16 Feb 21-Solid Waste-W9115121R0009.pdf PDF
Approved Amendment 2- 8 Feb 21-Solid Waste-W9115121R0009.pdf PDF
Beta Sam Revised Amendement Solicitation 8 Feb 21 Posting 21-R-0009.pdf PDF
Solid Waste Landfill Site Visit.pdf PDF
ApprovedAmendment-1-25Jan21.pdf PDF
Draft Amendment-1-Post Correct WD-UpdateSiteVisit -25Jan21etc.pdf PDF
TE-L Wage Determination 2015-5237 Rev 14 - dated-21Dec20.pdf PDF
TE-U BLORA (Belton Lake Outdoor Recreation Area) Map.pdf PDF
TE-M WD Pricing Spreadsheet 11 Jan 2021.xlsx XLSX spreadsheet
TE-L Wage Determination 2015-5238 Rev 14 (5-27-2020) 1 Jan 2021.pdf PDF
TE-I HazMat Authorization Request 17 Jul 2019.xlsx XLSX spreadsheet
TE-D Bid Schedule 11 Jan 2021.xlsx XLSX spreadsheet
TE-P Container Placement Maps 6 Aug 2019.pdf PDF
TE-T North Fort Hood Cantonment Map.pdf PDF
TE-H Landfill Image 17 Jul 2019.pdf PDF
TE-A Landfill Permit 17 Jul 2019.docx DOCX document
TE-J Sample Report Form 17 Jul 2019.xlsx XLSX spreadsheet
TE-C Cantonment Roll Off-Compactor Container Locations 19 Nov 2020.xlsx XLSX spreadsheet
Released Solicitation-14Jan21-Solid Waste-W9115121R0009.pdf PDF
Solid Waste PWS 12 Jan 21 V12.docx DOCX document
TE-V Fort Hood Special Events Calendar.pptx PPTX presentation
TE-Q Fort Hood Landfill Site Plan 1 Sep 2020.pdf PDF
TE-O Equipment Listing 6 Nov 2020.docx DOCX document
TE-K Org Chart 17 Jul 2020.pdf PDF
TE-E Customer ID 1 Jan 2021.xlsx XLSX spreadsheet
TE-R Fort Hood Main Cantonment Map.pdf PDF
TE-S West Fort Hood Cantonment Map.pdf PDF
TE-G Landfill Disposal Data 19 Nov 2020.xlsx XLSX spreadsheet
TE-F Grease Trap Inventory 14 Jan 2021.xlsx XLSX spreadsheet
TE-B Cantonment Refuse Container Locations 12 Jan 2021.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT N

BASELINE STAFFING

60 Month

ITEM

NAME

ESTIMATED QUANTITY
Total Personnel
1
Project Manager
60 Month
9320 HRs
1
2
QC Inspector
60 Month
9320 HRs
1
3
Landfill Manager
60 Month
9320 HRs
1
4
Secretary
60 Month
15,841 HRs
1.70
5
Truck Driver Light BLDG 49010 Grease Trap
60 Month
6 HRs
.00
6
Truck Driver Steam Cleaner
60 Month
9,600 HRs
1.03
7
Truck Driver Refuse
60 Month
60,160 HRs
6.45
8
Scale Operator
60 Month
24,000 HRs
2.58
9
Laborer
60 Month
29,330 HRs
3.15
10
Heavy Equipment Mechanic
60 Month
7,000 HRs
.75
11
Heavy Equipment Operator
60 Month
28,800 HRs
3.09

Total

21.75

Note** The purpose of TE-N, Baseline Staffing, is to provide a general estimate of the necessary personnel to perform the Solid Waste Management requirement. It is the Offeror's responsibility to accurately assess and determine the number of personnel for the Offeror to perform the Solid Waste Management requirement.