Exhibit_A_PRS.pdf

PDF 143 KB Posted

Attached to
Analytic Engineering Mission Support Services
Solicitation number
W9115119R0009
Issued by

About this file

PRS

View the file

Other files

File Type Posted
Responses_to_questions_from_Industry_W91151-19R-0009_15_July.xlsx XLSX spreadsheet
W91151-19-R-0009_amendmnent_0003.pdf PDF
W91151-19-R-0009-0002_amendment_0002.pdf PDF
Responses_to_questions_from_Industry_W91151-19R-0009_1_July.xlsx XLSX spreadsheet
A0001-A021_(OneSAF)_24_June_.pdf PDF
Security_CRDLs_A0001-A032_Updated_24_June_.pdf PDF
COMBATXXI_CDRLs_A0001-A010_updated_24_June.pdf PDF
TRADOC_A001-A005_24_June.pdf PDF
TRO_CDRLs_A001-A003_24_June.pdf PDF
A002_Knowledge_Management.pdf PDF
Exhibit_A_PRS.docx DOCX document
pricing_proposal_sheet__25_July_2018.xls XLS spreadsheet
Combined_DD254_docs_.pdf PDF
A001_Knowledge_Management.pdf PDF
Responses_to_questions_from_Industry_W91151-19R-0009_28_June.xlsx XLSX spreadsheet
TE_1A_PERSONNEL_QUALIFICATIONS_REQUIREMENTS.docx DOCX document
W91151-19-R-0009_-0001_conformed_copy_.pdf PDF
TE_1_-_ESTIMATED_WORKLOAD_DATA.docx DOCX document
W9115119R0009_past_performance_Questionaire.docx DOCX document
Technical_Exhibit_3_Incidental_property.pdf PDF
Technical_Exhibit_2_GFP.pdf PDF
TRADOC_CDRLs_A001-A005.pdf PDF
Security_CDRLs_A001-A031.pdf PDF
SCA_WD_01102018.pdf PDF
W91151-19-R-0009_30_May_19.pdf PDF
OneSAF_CDRLs_A001-A021.pdf PDF
TE_1_-_ESTIMATED_WORKLOAD_DATA.pdf PDF
DD0254_AnalyticEngineeringMissionSupportServices_082817.pdf PDF
TRO_A0001-A003.pdf PDF
COMBATXXI_CDRLs_A001-_A010.pdf PDF
Technical_Exhibit_1A_PERSONNEL_QUALIFICATION_REQUIREMENTS.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 3

1.0 PERFORMANCE REQUIREMENTS SUMMARY

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. Section 5 tasks specific performance requirements summary will be defined in detail in each TO. These thresholds are critical to mission success.

PERFORMANCE

OBJECTIVE

PERFORMANCE

STANDARD

PERFORMANCE

THRESHOLD

INCENTIVES/DISINCENTIVE

The Contractor shall provide CXXI support for the following tasks: (1) model and tools improvement and (2) model testing, helpdesk, and configuration management. PWS 5.1

All tasks shall be focused on the baseline, study, and improvement branch versions of CXXI.

95% of all analytic tools, technical data, and analyses reports shall be acceptable

First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO

The Contractor shall provide TRADOC Standard Scenario Documentation support for the following tasks:

brigade and below level scenario development and documentation support for three scenarios that includes background, road-to-war, environment, threat operations, friendly operations, as well as a brigade operations plan as defined in FM

6-0 PWS 5.2

Support includes coordination with development of documentation that describes combat and stability operations within the contemporary operating environments.

95% of all analytic tools, modeled scenarios, wargame participation, technical data, and analyses reports shall be acceptable

First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO

The Contractor shall provide support to the development of a robust CM2E/COEM analytical framework capability by

The Contractor shall identify CM2E/COEM triggers and variables relevant in a peace or conflict environment and instantiate those

95% of all documentation support services shall be completed without revision and no more than one

First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 supporting the development, advancement, and use of various data types and data sources, to support the previously developed MMT in the context of specific studies PWS 5.3 & 5.3.1 triggers and variables into a dynamic scenario integrated into the TRAC’s NEX simulation engine while providing documentation of process and results.

substantiated complaint per month or more) a corrective action plan will be developed at the discretion of the KO

The Contractor shall provide services to the TRO in direct support of TRAC’s mission. PWS 5.4

This support spans a wide range of documentation services to include preparing/editing drawings, lists, instructions, diagrams, reports, plans, briefings, charts, graphs, descriptions, and schedules

95% of all documentation support services shall be completed without revision and no more than one substantiated complaint per month

First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO

The Contractor shall provide security support in direct support of TRAC’s mission, facilities and security operations.

PWS 5.5

This support spans a wide range of security disciplines to include personnel security, physical security, force protection, security awareness training and operations security

(OPSEC).

Security support shall be fully met with no more than one substantiated instances during the month

First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO

OneSAF Scenario Modeling and Exercise Support PWS 5.6

This support covers the following tasks relating to the OneSAF model: (1) developing unit compositions and

(2) developing formation files.

OneSAF support shall be fully met with no more than one substantiated instances during the month

First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO

File details come from the government source that posted it.