A001_Knowledge_Management.pdf
PDF 339 KB Posted
- Attached to
- Analytic Engineering Mission Support Services
- Solicitation number
- W9115119R0009
About this file
New Knowledge management CDRL A0001
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 0 of 3 Pages
Adobe Professional 8.0
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Knowledge
Manageme nt
E. CONTRACT/PR NO.
N/A
F. CONTRACTOR
N/A
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Knowledge Management Assessment and Design
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
N/A
5. CONTRACT REFERENCE
5.7.6.1.
6. REQUIRING OFFICE
TRAC-WSMR
7. DD 250 REQ
N/A
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
SEE REMARKS
12. DATE OF FIRST SUBMISSION
SEE REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE REMARKS
Draft
Final
Reg Repro
16. REMARKS
BLOCK 10: For tasks under 5.7.2 of this PWS, the Contractor shall include in a monthly status report a summary of work orders completed and amount of time spent on work orders for KM, web, and database support tasks accomplished during the month, along with any noteworthy lessons learned or unusual issues encountered during that month.
Recommendations on improvements to TRAC-WSMR’s knowledge management environment including database management and web support shall be made as identified and provided as an additional section in the monthly report. The Contractor shall provide the monthly report in MS Word format to the COR, or designated representative NLT the third working day of the following month. If there is a need for corrections, the contractor will have up to 7 working days to make corrections and submit a revised report.
BLOCK 12: For tasks under 5.7.2 of this PWS, the Contractor shall include in a monthly status report a summary of work orders completed and amount of time spent on work orders for KM, web, and database support tasks accomplished during the month, along with any noteworthy lessons learned or unusual issues encountered during that month.
Recommendations on improvements to TRAC-WSMR’s knowledge management environment including database management and web support shall be made as identified and provided as an additional section in the monthly report. The Contractor shall provide the monthly report in MS Word format to the COR, or designated representative NLT the third
BLOCK 13: For tasks under 5.7.2 of this PWS, the Contractor shall include in a monthly status report a summary of work orders completed and amount of time spent on work orders for KM, web, and database support tasks accomplished during the month, along with any noteworthy lessons learned or unusual issues encountered during that month.
Recommendations on improvements to TRAC-WSMR’s knowledge management environment including database management and web support shall be made as identified and provided as an additional section in the monthly report. The Contractor shall provide the monthly report in MS Word format to the COR, or designated representative NLT the third
COR 1
15. TOTAL 0 1 0
G. PREPARED BY
MASONMCFARLAND.KATHY.A Digitally signed by MASONMCFARLAND.KATHY.A.1229868507
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, .1229868507 cn=MASONMCFARLAND.KATHY.A.1229868507
Date: 2018.03.16 07:20:16 -06'00'
H. DATE
20180316
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Knowledge
Manageme nt
E. CONTRACT/PR NO.
N/A
F. CONTRACTOR
N/A
Reset
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page 3 of 3 Pages
DD FORM 1423-1 (BACK), FEB 2001
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM
- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort
(production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to
Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.
The Government's right to use the data shall be governed by the pertinent provisions of the contract.
File details come from the government source that posted it.