Exhibit_A_PRS.docx
DOCX document 14 KB Posted
- Attached to
- Analytic Engineering Mission Support Services
- Solicitation number
- W9115119R0009
About this file
Exhibit A PRS updated 24 June
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 3
1.0 PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. Section 5 tasks specific performance requirements summary will be defined in detail in each TO. These thresholds are critical to mission success.
PERFORMANCE
OBJECTIVE
PERFORMANCE
STANDARD
PERFORMANCE
THRESHOLD
INCENTIVES/DISINCENTIVE
The Contractor shall provide CXXI support for the following tasks: (1) model and tools improvement and (2) model testing, helpdesk, and configuration management. PWS 5.1
| All tasks shall be focused on the baseline, study, and improvement branch versions of CXXI. |
| 95% of all analytic tools, technical data, and analyses reports shall be acceptable |
| First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the |
discretion of the KO
| The Contractor shall provide TRADOC Standard Scenario Documentation support for the following tasks: brigade and below level scenario development and documentation support for three scenarios that includes background, road-to-war, environment, threat operations, friendly operations, as well as a brigade operations plan as defined in PWS 5.2 |
| Support includes coordination with development of documentation that describes combat and stability operations within the contemporary operating environments. |
| 95% of all analytic tools, modeled scenarios, wargame participation, technical data, and analyses reports shall be acceptable |
| First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO |
| The Contractor shall provide services to the TRO in direct support of TRAC’s mission. PWS 5.3 |
| This support spans a wide range of documentation services to include preparing/editing drawings, lists, instructions, diagrams, reports, plans, briefings, charts, graphs, descriptions, and |
schedules
| 95% of all documentation support services shall be completed without revision and no more than one substantiated complaint per month |
| First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO |
| The Contractor shall provide security support in direct support of TRAC’s mission, facilities and security operations. PWS 5.4 |
| This support spans a wide range of security disciplines to include personnel security, physical security, force protection, security awareness training and operations security |
(OPSEC).
| Security support shall be fully met with no more than one substantiated instances during the month |
| First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the |
discretion of the KO
| OneSAF Scenario Modeling and Exercise Support PWS 5.5 |
| This support covers the following tasks relating to the OneSAF model: (1) developing unit compositions and |
(2) developing formation files.
| OneSAF support shall be fully met with no more than one substantiated instances during the month |
| First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the |
discretion of the KO
| 5.7. Knowledge, Content, and Data Management Services PWS 5.7. |
| This support covers the following tasks: (1) Content & Data Management (2) Knowledge Management Assessment and Design (3) Knowledge Management Methodology Documentation and Implementation (4) Knowledge Management Training (5) Work Order System |
| Knowledge management support shall be fully met with no more than one substantiated instances during the month |
| First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the |
discretion of the KO
File details come from the government source that posted it.