ASBESTOS SURVEY REPORT
BUILDING 12011
FORT HOOD, TEXAS
Submitted to:
U.S. Army Corps of Engineers, Fort Worth District
For:
U.S. Army Corps of Engineers, Tulsa District
Prepared by:
Radian International LLC 8501 N. Mopac Blvd.
P.O. Box 201088 Austin, Texas 78720-1088
September 1997
Asbestos Survey, Fort Hood, Texas ii September 1997 Building 12011 f_12011.doc
Table of Contents
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
APPENDIX A: HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS
FOR BUILDING 12011 SURVEY
APPENDIX B: BUILDING 12011 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 12011
APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING
12011
List of Figures
B-1 Building 12011 Floor Plan--First Floor ..................................................................... B-1 B-2 Building 12011 Roof Plan ......................................................................................... B-2
List of Tables
3-1 Summary of ACM and PACM in Building 12011 4-1 Priority Rating Table for Recommended Response Actions 4-2 Building 12011 Risk Assessment Results 5-1 Building 12011 Abatement and Replacement Cost Estimates 5-2 Building 12011 Repair Cost Estimates A-1 Building 12011 Homogeneous Areas ........................................................................ A-1 A-2 Building 12011 Asbestos Survey Analytical Results ................................................ A-2 B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 12011 ................... B-3 D-1 Damage/Risk Values for Inspection Observations .................................................... D-2 D-2 Exposure Values for Inspection Observations ........................................................... D-2 D-3 Summary of Damage/Risk Observations for ACM and PACM in Bldg. 12011 ................................................................................................................ D-3 D-4 Summary of Exposure Observations for ACM and PACM in Bldg. 12011 .............. D-3
Asbestos Survey, Fort Hood, Texas iii September 1997
List of Photographs (Appendix C)
Photo 12011-1-A: Building caulkings and putties; throughout building Photo 12011-1-B: Olive 9x9 floor tile Photo 12011-1-D: White 12x12 floor tile; stage area Photo 12011-1-K: Cementitious soffit panels; around building except in Classroom # 1
Asbestos Survey, Fort Hood, Texas iv September 1997
Acronyms and Abbreviations
ACM Asbestos-containing material Act. Actinolite Am. Amosite Anth. Anthophyllite Cell. Cellulose Chry. Chrysotile COR Contracting Officer’s Representative Croc. Crocidolite D Damage/risk factor DS Dispersion staining E Exposure factor EPA United States Environmental Protection Agency Fib. Fiberglass GRADE Air Force Guidance for Rating Damage and Exposure ID Identification LLC Limited liability company m Meter m2 Square meter M.W. Mineral wool N/A Not analyzed NA Not applicable ND Not detected O&M Operations and maintenance PACM Presumed asbestos-containing material PLM Polarized light microscopy QA Quality assurance QC Quality control R Risk rating RPD Relative percent difference SACM Suspect asbestos-containing material SWD Southwest Division (Laboratory) Syn. Synthetics T Total TDH Texas Department of Health Trem. Tremolite TSI Thermal systems insulation USACE United States Army Corps of Engineers
Asbestos Survey, Fort Hood, Texas September 1997
1.0 INTRODUCTION
Radian International LLC, under contract with the United States Army Corps of Engineers (USACE), Contract DACA56-94-D-0015, performed a facility-wide asbestos survey at Fort Hood, Texas, to meet the following project objectives:
Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-containing materials (SACM);
Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
Identify and quantify material which is presumed to contain asbestos;
Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
Conduct air monitoring where necessary according to risk assessment models; and Prepare an Operations and Maintenance (O&M) program (under separate cover) for all
ACM and PACM.
The survey included base buildings and approximately 10% of the family housing buildings at Fort Hood. Mr. Emmet Gray, Directorate of Public Works, is the post contact for this project.
This report presents the findings from the asbestos survey at Building 12011.
1.1 Physical Inspections
Survey teams visually inspected the accessible areas of the interior and exterior of each building, including interior and exterior rooms, mechanical spaces, storage areas, crawl spaces, attics, and roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based on the visual inspection of the remainder of the building and interviews with the building occupants.
The following steps were taken to complete physical inspections.
1. Obtain a copy of the building floor plan.
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and conditions present at the time of the survey.
e) Define the bulk sample locations.
1.2 Bulk Sampling and Analysis
Homogeneous materials were categorized by the survey teams as surfacing materials, thermal systems insulation (TSI), or miscellaneous materials. Building age, use, and size were taken into consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:
1. Mark sample locations on the floor plan using a unique identification number.
2. Record SACM sample information on a field data sheet, including:
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
4. Repair any damage caused by sampling using sealants and methods approved by the Contracting Officer’s Representative (COR).
Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August 1996, point-counting was not performed. In order to meet quality assurance/quality control (QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ Lee Group laboratory. The third sample is the QA sample that was sent to the USACE Southwestern Division Laboratory (SWD) in Dallas, Texas.
1.3 Sample Numbering Scheme
Unique identification numbers were assigned to each sample using the following numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal sample 8 = field duplicate (QC sample) 9 = QA sample d identifies the sample number (1,2, or 3) [Note: “b-c” represents the unique homogeneous area identification (ID) for a particular building. When necessary, “e” is used by the laboratory to identify additional layers of material not separated in the field (e.g., tile and mastic associated with flooring materials)].
2.0 FACILITY DESCRIPTION
Building 12011, encompassing an area of 6136 sq ft, is a Battalion Headquarters Building built in 1966. A building floor plan is presented in Appendix B.
3.0 DISCUSSION OF RESULTS
Building 12011 was inspected during November 1996, and was reinspected during March 1997 for additional mastic samples. During these inspections, 12 homogeneous areas were identified and 33 normal samples were collected. Table 3-1 presents a summary of ACM and PACM identified during the survey of Building 12011. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 12011. Sample and photograph locations are presented in the Building 12011 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 12011.
Table 3-1 Summary of ACM and PACM in Building 120111
Homogeneous Area Area/Length Physical ACM
ID Description & Location Estimate Units Damage Friability Type 1-A Building caulkings and putties; throughout building
0.57 m2 None None PACM
1-B Olive 9x9 floor tile 530 m2 None None ACM 1-D White 12x12 floor tile; stage area 9.3 m2 None None ACM 1-K Cementitious soffit panels; around building except in Classroom # 1 20 m2 None None PACM2
1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
2 This homogenous area was inaccessible to the inspection team.
m2 = Square meter
Homogeneous areas 1-A, 1-B, 1-D, and 1-K were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. Homogeneous area 1-K was inaccessible to the inspection team. Interior and incoming electrical wiring appeared to be non-ACM.
A field duplicate (QC) sample was collected at location 12011-1-H-01. The results of analysis for the QC sample indicated asbestos levels less than 1% (non-detect). These results are consistent with the normal sample, which also indicated that asbestos was not measured above 1 percent.
4.0 RISK ASSESSMENT
A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D) and exposure factors (E). These factors are summed and placed in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)].
Table 4-1 was used to establish a priority rating for each homogeneous area, based on the risk rating or “R” value.
Table 4-1 Priority Rating Table for Recommended Response Actions
Risk Rating (R) Priority Recommended Response Action
R < 6 1 Immediate removal/repair 6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program R 10 4 No action required; place in O&M program as a precaution
1 If material is repaired, it will remain in the O&M program until it is removed.
O&M = Operations and maintenance R = Risk Rating
Risk assessments for the homogeneous areas identified as ACM or PACM in Building 12011 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these factors is also provided in Appendix D. No air sampling was required in this building based on risk assessment models.
Table 4-2 Building 12011 Risk Assessment Results
Homogeneous Area ACM Risk
ID Description & Location Type Rating (R) Priority 1-A Building caulkings and putties; throughout building PACM 9.5 4a 1-B Olive 9x9 floor tile ACM 9.83 4a 1-D White 12x12 floor tile; stage area ACM 9.67 4a 1-K Cementitious soffit panels; around building except in
Classroom # 1 PACM 9.16 4a a Priority rating is 4 because material is not friable.
5.0 ABATEMENT COST ESTIMATES
Abatement cost estimates are based on professional experience and costs from 1996 Fort Hood asbestos abatement contracts. Cost estimates were developed using the unit costs for abatement of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.
Cost estimates were developed using the assumption that all materials within a building would be abated concurrently. In addition, costs are based on the assumption that all ACM and/or PACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM and/or PACM in Building 12011 are presented in Tables 5-1 and 5-2.
Table 5-1 Building 12011 Abatement and Replacement Cost Estimates
Homogeneous Area Area/Length Unit Cost for Total Cost
ID Description & Location Estimate Units Abatement ($) 1-A Building caulkings and putties; throughout building 0.57 m2 $107.60/m2 $61 1-B Olive 9x9 floor tile 530 m2 $18.83/m2 $9,980 1-D White 12x12 floor tile; stage area 9.3 m2 $18.83/m2 $175 1-K Cementitious soffit panels; around building except in
Classroom # 1 20 m2 $18.83/m2 $377
Subtotal $10,593 Design Fee (6%) $636 Air Monitoring Cost (10%) $1,059 Materials Replacement $14,194 Off-site Disposal Cost $1,119
TOTAL ESTIMATED ABATEMENT COST $27,601
Table 5-2 Building 12011 Repair Cost Estimates
Homogeneous Area
Approximate Damaged
Area/Length
Unit Cost for
Total Cost ID Description & Location Estimate Units Repair ($) 1-A Building caulkings and putties; throughout building 0.57 m2 $107.60/m2 $61 1-B Olive 9x9 floor tile 3 m2 $18.83/m2 $56 1-D White 12x12 floor tile; stage area 3 m2 $18.83/m2 $56 1-K Cementitious soffit panels; around building except in
Classroom # 1 3 m2 $18.83/m2 $56
Subtotal $229 Design Fee (6%) $14 Air Monitoring Cost (10%) $23 Materials Replacement $947 Off-site Disposal Cost $19
TOTAL ESTIMATED REPAIR COST $1232
APPENDIX A
HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS FOR
BUILDING 12011 SURVEY
A-1
Table A-1 Building 12011 Homogeneous Areas 1
Homogeneous Area ACM
ID Description & Location Type 2 1-A Building caulkings and putties; throughout building PACM 1-B Olive 9x9 floor tile ACM 1-C 2x2 fissured ceiling tile None 1-D White 12x12 floor tile; stage area ACM 1-E Baseboard glue; stage area None 1-F Wallboard ceiling tile None 1-G Stairstep glue; stage area None 1-H Wainscoat glue; throughout building, except Classroom #2 None 1-I Black 9x9 floor tile; patch tile in various locations None 1-K Cementitious soffit panels; around building except in Classroom # 1 PACM R-A Built-up roofing materials None R-B Roof penetration mastics None
1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and ACM are shown in Appendix C.
2 ACM types include:
ACM = Materials containing >1% asbestos;
None = Materials containing 1% asbestos; and PACM = Materials presumed to contain >1% asbestos.
ACM = Asbestos-containing material ID = Identification PACM = Presumed asbestos-containing material
Table A-2 Building 12011 Asbestos Survey Analytical Results1
Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)
Area
ID
Sample ID
Layer
Layer Description (from Laboratory)
Total
Act
Am
Anth
Chry
Croc
Trem
Cell
Fib
M.W.
Synth
ACM
Type
1-B 12011-1-B-01 NA Gray Floor Tile 10.00 ND ND ND 10 ND ND ND ND ND ND ACM 12011-1-B-02 a Gray Floor Tile 10.00 ND ND ND 10 ND ND ND ND ND ND ACM 12011-1-B-02 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM 12011-1-B-02 NA Total 9.9 ACM 12011-1-B-03 a Gray Floor Tile 10.00 ND ND ND 10 ND ND ND ND ND ND ACM 12011-1-B-03 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM 12011-1-B-03 NA Total 9.9 ACM
1-C 12011-1-C-01 NA Wht Ceil Tile/Wht Paint ND ND ND ND ND ND ND 50 ND 30 ND None 12011-1-C-02 NA Wht Ceiling Tile/Wht Paint ND ND ND ND ND ND ND 50 ND 30 ND None 12011-1-C-03 NA Wht Ceil Tile/Wht Paint ND ND ND ND ND ND ND 50 ND 30 ND None
1-D 12011-1-D-01 a Wht Floor Tile ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-01 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM 12011-1-D-01 NA Total 0.1 None 12011-1-D-02 a Wht Floor Tile ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-02 b Blk Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-02 NA Total ND None 12011-1-D-03 a Wht Floor Tile ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-03 b Blk Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-03 NA Total ND None
1-E 12011-1-E-01 NA Wht Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None 12011-1-E-02 NA Wht Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None 12011-1-E-03 NA Wht Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None
1-F 12011-1-F-01 a Wht Paint/Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None 12011-1-F-01 b Wht Drywall ND ND ND ND ND ND ND 3 ND ND ND None 12011-1-F-01 NA Total ND None 12011-1-F-02 a Wht Paint/Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None 12011-1-F-02 b Wht Drywall ND ND ND ND ND ND ND 3 ND ND ND None 12011-1-F-02 NA Total ND None 12011-1-F-03 a Wht Paint/Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None 12011-1-F-03 b Wht Drywall ND ND ND ND ND ND ND 3 ND ND ND None 12011-1-F-03 NA Total ND None
1-G 12011-1-G-01 NA Blk Mat'l ND ND ND ND ND ND ND ND ND ND 1 None 12011-1-G-02 NA Blk Mat'l ND ND ND ND ND ND ND ND ND ND 1 None 12011-1-G-03 NA Blk Mat'l ND ND ND ND ND ND ND ND ND ND 1 None
Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)
ID
Sample ID
Layer
Layer Description (from Laboratory)
Total
Act
Am
Anth
Chry
Croc
Trem
Cell
Fib
M.W.
Synth
ACM
Type
1-H 12011-1-H-01 NA Lt Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-H-02 NA Lt Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-H-03 NA Lt Tan Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None 12011-1-H-81 NA Lt Tan Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None
1-I2 12011-1-I-01 NA Blk Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None 12011-1-I-02 NA Blk Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None 12011-1-I-03 NA Blk Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None 12011-1-I-04 NA Blk Floor Tile ND ND ND ND ND ND ND 1 ND ND ND None 12011-1-I-05 NA Blk Floor Tile ND ND ND ND ND ND ND 1 ND ND ND None 12011-1-I-06 NA Blk Floor Tile ND ND ND ND ND ND ND 1 ND ND ND None
R-A 12011-R-A-01 a Blk Roofing/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-A-01 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-A-01 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-A-01 NA Total ND None 12011-R-A-02 a Blk Roof /Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-A-02 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-A-02 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-A-02 NA Total ND None 12011-R-A-03 a Blk Roof/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-A-03 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-A-03 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-A-03 NA Total ND None
R-B 12011-R-B-01 a Blk Roof/Wht Ganules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-B-01 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-B-01 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-B-01 NA Total ND None 12011-R-B-02 a Blk Roof/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-B-02 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-B-02 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-B-02 NA Total ND None 12011-R-B-03 a Blk Roof/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-B-03 b Blk Tar ND ND ND ND ND ND ND 5 5 ND ND None 12011-R-B-03 NA Total ND None
1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, than that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.
2 No mastic layer was found to be associated with homogeneous area 1-I during resampling.
ACM = Asbestos-containing material Act. = Actinolite Am. = Amosite Anth. = Anthophyllite Cell. = Cellulose Chry. = Chrysotile Croc. = Crocidolite Fib. = Fiberglass ID = Identification M.W. = Mineral wool NA = Not applicable (sample contained single layer) ND = Not detected (<1% asbestos) Synth. = Synthetics T = Total Trem. = Tremolite
APPENDIX B
BUILDING 12011 FLOOR PLAN
Asbestos Survey, Fort Hood, Texas B-3 September 1997
Table B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 12011
Building and Analytical Laboratory Building Inspector/Risk Assessor Date Homogeneous
Area ID1
Name
TDH
License # License
Exp. Date
Name
TDH
License # License
Exp. Date Inspected/ Sampled
12011-1-A NA NA NA Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-B RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-C RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-D RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-E RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-F RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-G RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-H RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-I
RJ Lee Group 30-0051 02/26/98 Mike Sabisch
Dave Stoetzel 60-1099 60-1100
10/15/97 10/15/97
11/27/96 3/17/97
12011-1-K NA NA NA Mike Sabisch 60-1099 10/15/97 11/27/96 12011-R-A RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-R-B RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96
1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal bulk material sample 6 = normal personnel air monitoring sample 7 = normal environmental air monitoring sample 8 = field duplicate bulk material (QC sample) 9 = QA bulk material sample d identifies the sample number (1, 2, or 3);
[Note: “b-c” represents the unique homogeneous area ID for a particular building.]
ACM = Asbestos-containing material ID = Identification NA = Not applicable. (PACM was not sampled.)
PACM = Presumed asbestos-containing material QA = Quality assurance QC = Quality control TDH = Texas Department of Health
APPENDIX C
REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN BUILDING
12011
APPENDIX D
RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 12011
Asbestos Survey, Fort Hood, Texas D-1 September 1997
Appendix D Risk Assessment Methodology and Data
A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guideline for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D), and exposure factors (E). These factors are summed and used in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)];
Where D = the sum of the values for the following damage/risk observations:
Material type Potential for contact Physical damage Water damage Potential for damage by repair/maintenance activities Asbestos content;
And E = the sum of the values for the following exposure observations:
Area of damaged material Material friability Population Activity/vibration Ventilation Air movement Floors Walls Barriers
A further breakdown of the values for the subunits under each category is provided in Tables D-1 and D-2. Summaries of the inspection observations for damage/risk and exposure for the ACM and PACM in Building 12011 are presented in Tables D-3 and D-4.
Table D-1 Damage/Risk Values for Inspection Observations 1
Material Type
Potential for Contact Physical Damage
Water Damage
Potential for Damage by Repair/Maintenance Activities
Asbestos Content
Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) >1-30% (1) TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)
TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5) Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)
Misc., Undamaged (0) >10 ft, Medium (3) High (5) >10 ft, High (5)
1 The value assigned to each category is shown in italics.
TSI = Thermal systems insulation
Table D-2
Exposure Values for Inspection Observations 1
Area of Damaged Material (m or m2)
Friability
Population
Activity/ Vibration
Interior Ventilation
Air Movement
Floors
Walls
Barriers <3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Smooth (1) Permanent (1)
3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2) 31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3) >300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)
501-1,000 (4) >1,000 (5)
1 The value assigned to each category is shown in italics.
Table D-3 Summary of Damage/Risk Observations for ACM and PACM in Building 12011
Material Type Potential for
Contact
Physical Damage Water
Damage Potential for Damage by
Repair/Maintenance Activities Asbestos Content
12011-1-A Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1) 12011-1-B Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1) 12011-1-D Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1) 12011-1-K Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)
Table D-4
Summary of Exposure Observations for ACM and PACM in Building 12011
Area of Damaged
(m or m2)
Friability
Population
Activity
Ventilation
Air Movement
Floors
Walls
Barriers 12011-1-A < 3 (0) None (0) 10-200 (2) Low (0) None (0) Perceptible (2) Smooth (1) Pitted (3) None (4) 12011-1-B < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Pitted (3) None (4) 12011-1-D < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Rough (4) None (4) 12011-1-K < 3 (0) None (0) 10-200 (2) Low (0) None (0) Perceptible (2) Rough, Seamed (2) Rough (4) None (4)
Legend
Suspect Asbestos-Containing Material Sample Location and ID
Building 12011 - 1st Floor
12011-1-A-01
Photograph Location and ID12011-1-A 2
Sample results and homogeneous area descriptions are presented in Appendix A.
Photographs are presented in Appendix C
Table B-1 contains license information and the sample numbering scheme.
Scale: Feet
0 168 24 32
Figure B-1, Building 12011 Floor Plan--First Floor
B u i l d i n g
A s b e s t o s
S u r v e y
F r t
H o d
T e x a s d d o c
S e p t e m b e r
B
12011-1-C-03
12011-1-I
12011-1-K
12011-1-F-03
12011-1-F-02
12011-1-F-01
12011-1-C-01
12011-1-C-02
12011-1-F
12011-1-D
12011-1-E-03
12011-1-B-01 12011-1-D-01
12011-1-E
12011-1-D-02
12011-1-G
12011-1-E-02
12011-1-D-03
12011-1-E-01
12011-1-I-02
12011-1-I-01
12011-1-I-03
12011-1-G-01
12011-1-G-02
12011-1-G-03
12011-1-B-02
12011-1-C
12011-1-B
12011-1-B-03
12011-1-H-01
12011-1-H
12011-1-H-02
12011-1-H-03
12011-1-A
Clean Environments, inc.
Industrial Hygiene & Environmental Consultants
February 13, 2012
DPW
Engineering Division Fort Hood Army Base Fort Hood, Texas
R E : Lead-Based Paint Hazard Survey Building 12011-Interior & Exterior Painted Surfaces Fort Hood Army Base Fort Hood, Texas C E I Project Number: 9609
Clean Environments, Inc. conducted a lead-based paint survey on the interior surfaces of the referenced building, February 10, 2012. The survey was conducted by Mr. Ray Keeble, DSHS Certification JVs 206-0816 of Clean Environments, Inc., Lead Firm, DSHS Certification Ne 211-0096.
Lead samples were collected according to the sampling protocol stipulated in DSHS, Texas Environmental Lead Reduction Rules, and Department of Housing and Urban Development (HUD), Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing ("HUD Guidelines").
LEAD-BASED PAINT BACKGROUND
A lead-based paint hazard is a condition in which exposure to lead from lead-contaminated dust, lead-contaminated soil, or deteriorated lead-based paint would have an adverse effect on human health (as established by the U.S. Environmental Protection Agency (EPA) Administrator under Title IV of the Toxic Substances Control Act).
Lead-basedpaint is described as any paint, varnish, shellac, or other surface coating that contains lead equal to or greater than 1.0 milligram per centimeter squared (mg/cm2) as measured by XRF or laboratory analysis, or 0.5percent by weight [5,000 microgram per gram (pg/g), 5,000parts per million (ppm), or 5,000 milligram per kilogram (mg/kg)] as measured by laboratory analysis.
The common route of exposure to lead in paint is the ingestion of lead-bearing dust that is generated by the paint when it deteriorates, chalks, or is disturbed through demolition or renovation or even abrasion from the opening and closing of windows.
622 Isom, Suite 110 • San Antonio, Texas 78216 • 210/349-7242 • Fax 210/349-1132
C L E A N E N V I R O N M E N T S , Inc .
L B P S u r v e y
Building 12011 Fort Hood, Texas P a g e 2
The severity of the health effects of lead contamination problems is only now being fully realized.
Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Children are especially vulnerable and susceptible to lead poisoning. Even low levels, persisting during childhood, are known to slow a child's normal development and cause learning and behavioral problems. The ASTDR and numerous other investigative agencies report long-lasting impacts on intelligence, motor control, hearing, and emotional development of children who have levels of lead in the body that are not associated with obvious symptoms.
Once in the body, from ingestion or inhalation, lead is distributed via the bloodstream to red blood cells, soft tissue, and bone. Lead in the body is eliminated very slowly by the kidneys and gastrointestinal tract; much smaller amounts are lost through perspiration. Lead serves no useful purpose in the body. It is a poison which binds with the chemicals that aid biological reactions throughout the body, particularly in the blood-forming system, the brain and nerves, and the kidneys, interfering with the synthesis of many body chemicals. The resulting damage from lead poisoning may be permanent, and in some cases fatal.
Chronic lead poisoning may result after lead has accumulated in the body over time, mostly in the bone. Long after exposure has ceased, some physiological event such as illness or pregnancy may release this stored lead form the bone and produce adverse health effects such as impaired hemoglobin synthesis, alteration in the central and peripheral nervous systems, hypertension, effects on the male and female reproduction systems, and damage to the developing fetus (lead freely crosses the placenta).
Exposure to lead is characterized either by the concentration of lead in the material (air water, food, dust, soil, or paint) to which people are exposed in the environment, or by the concentration of lead in whole blood, usually expressed in micrograms of lead per deciliter of blood (u.g/dl). The present level of concern for children is blood lead levels of 10 ug/dl. The Center for Disease Control (CDC) has a multi-tier prevention system to prevent this level of lead in children.
The Texas Department of Health, Texas Environmental Lead Reduction Rules, May 1998 does not require that the lead-based paint be abated from commercial or industrial buildings because such buildings are not considered target housing (pre-1978 with children 0 to 6 years old). However, 29 CFR 1926.62, Lead Exposure in Construction Final Rule (OSHA regulations), and the Texas Administrative Code (TAC) rules for waste classification and disposal, do apply. TAC 335.504, The Procedure for Hazardous Waste Determination, identifies lead waste in four classes — Hazardous, Class I , Class 2, and Class 3. This TAC section refers to 40 CFR 261 Subpart C defining "Characteristics of Hazardous Waste" and Subpart D listing hazardous wastes. TAC 335.505, .506, .507, define waste determination of Class 1, 2, 3 waste respectively.
C L E A N E N V I R O N M E N T S , Inc .
L B P S u r v e y
Building 12011 Fort Hood, Texas P a g e 3
The renovation/remodeling Contractor must be notified of the presence of lead-based paint in commercial or industrial buildings in order to adequately protect workers. Worker protection, to include medical surveillance and EPA training, is a Contractor, not Building Owner, responsibility.
The Building Owner, however, is responsible for waste stream determinations and disposal of the lead-based paint wastes. It is suggested that the lead-based painted substrates or scrapped paint chips be separated from other construction debris and a Toxicity Leaching Probability Characteristic (TCLP) laboratory procedure be performed on the lead-based paint waste to determine proper disposal.
Al l debris must be disposed in accordance with the requirements of 40 CFR 260,261,262,264,268.
Al l debris that is classified as hazardous, must be transported in accordance with 40 CFR 263. The Landfill must be registered/licensed with the State or EPA to accept lead hazardous wastes, as well as the transporters.
FINDINGS
The above referenced building is scheduled for renovation/demolition. Al l interior & exterior painted surfaces were tested for lead based paint (LBP).
The Innovx Spectrum Analyzer was used to collect XRF assays from components in the specified areas of the building. Positive results were noted at reading of 1.0 mg/cm2. Negative results were noted at readings of less than 1.0 mg/cm2. Inconclusive results were noted i f the numerical results that followed the greater than symbol were less than 1.0 mg/cm2. No inconclusive results were then resolved through K shell analysis.
The following areas tested positive for lead-based paint.
Area Substrate Color Condition
Interior Walls Heaters Columns
Cream Intact
Interior Door Door Frames Window Frames
Brown Intact
Interior Columns Gray Intact
Interior Heaters White Intact
Exterior Window Frames Brown Intact
Exterior Window Frame Gutters
Cream Intact
Exterior Steps Yellow Intact
AH other paints tested negative for Lead.
It has been a pleasure to work with you on this project. We look forward to being of continued service to you. The XRF data will follow shortly.
Very, ffjuly yours, Ray Keeble Lead Project Designer DSHS License JV° 209-0069
Attachement: XRF Results
XRF RESULTS
XRF Results Reading Date Mode Pass/Fai l Pb Room Side Component Substrate Color Conditio
1 10-Feb-12 Standardization PASS
2 10-Feb-12 LBP Inspection Positive 1.03 Calibration
3 10-Feb-12 LBP Inspection Negative 0 Calibration
4 10-Feb-12 LBP Inspection Negative 0.29 Calibration
5 10-Feb-12 LBP Inspection Positive 3.89 East Room B Wall Concrete Cream Intact
6 10-Feb-12 LBP Inspection Positive 3.07 East Room B Wall Concrete Cream Intact
7 10-Feb-12 LBP Inspection Negative 0.08 East Room C Wall Sheetrock Cream Intact
8 10-Feb-12 LBP Inspection Positive 5 East Room C Wall Sheetrock Cream Intact
9 10-Feb-12 LBP Inspection Negative 0.06 East Room c Vent Metal Black Intact
10 10-Feb-12 LBP Inspection Negative 0.31 East Room c Stairs Metal Black Intact
11 10-Feb-12 LBP Inspection Negative 0.03 East Room c Door Wood Stain Intact
12 10-Feb-12 LBP Inspection Positive 5 East Room c Heater Metal Cream Intact
13 10-Feb-12 LBP Inspection Negative 0.07 East Room c Heater Metal Cream Intact
14 10-Feb-12 LBP Inspection Positive 1 East Room c Heater Metal Cream Intact
15 10-Feb-12 LBP Inspection Positive 5 East Room D Wall Concrete Cream Intact
16 10-Feb-12 LBP Inspection Negative 0 East Room D Door Metal Cream Intact
17 10-Feb-12 LBP Inspection Negative 0 East Room A Wall Sheetrock Cream Intact
18 10-Feb-12 LBP Inspection Negative 0.04 East Room A Wall Sheetrock Cream Intact
19 10-Feb-12 LBP Inspection Negative 0 East Room A Column Metal White Intact
20 10-Feb-12 LBP Inspection Positive 1 S I B Door Frame Metal Brown Intact
21 10-Feb-12 LBP Inspection Negative 0 S I B Door Wood Brown Intact
22 10-Feb-12 LBP Inspection Negative 0 S I C Wall Sheetrock Gray Intact
23 10-Feb-12 LBP Inspection Negative 0 S I B Wall Sheetrock Gray Intact
24 10-Feb-12 LBP Inspection Negative 0 S I C Wall Trim Wood White Intact
25 10-Feb-12 LBP Inspection Negative 0.08 S I c Wall Trim Wood White Intact
26 10-Feb-12 LBP Inspection Positive 5 S I D Column Metal Gray Intact
27 10-Feb-12 LBP Inspection Positive 5 S I D Door Metal Brown Intact
28 10-Feb-12 LBP Inspection Negative 0.09 S I D Door Frame Metal Brown Intact
29 10-Feb-12 LBP Inspection Negative 0.03 S I A Wall Concrete Gray Intact
30 10-Feb-12 LBP Inspection Positive 5 S I B Column Metal Gray Intact
31 10-Feb-12 LBP Inspection Negative 0 Lobby B Wall Concrete White Intact
32 10-Feb-12 LBP Inspection Negative 0 Lobby D Wall Concrete White Intact
33 10-Feb-12 LBP Inspection Negative 0 Lobby A Wall Concrete White Intact
CEI Job No: 9609
Building 12011 Ft. Hood Page 1
XRF Results Reading Date Mode Pass/Fai l Pb Room Side Component Substrate Color Condition
34 10-Feb-12 LBP Inspection Positive 5 Lobby B Heater Metal White Intact
35 10-Feb-12 LBP Inspection Negative 0.27 Office D Wall Concrete Yellow Intact
36 10-Feb-12 LBP Inspection Positive 5 Office A Column Metal Cream Intact
37 10-Feb-12 LBP Inspection Negative 0.02 Office D Wall Concrete Cream Intact
38 10-Feb-12 LBP Inspection Negative 0.02 Office B Wall Concrete Cream Intact
39 10-Feb-12 LBP Inspection Positive 3.28 Office A Door Metal Brown Intact
40 10-Feb-12 LBP Inspection Negative 0.26 Office A Door Frame Metal Brown Intact
41 10-Feb-12 LBP Inspection Negative 0.55 Office A Door Frame Metal Brown Intact
42 10-Feb-12 LBP Inspection Positive 5 Office A Column Metal Cream Intact
43 10-Feb-12 LBP Inspection Positive 2.04 Restroom B Door Frame Metal Brown Intact
44 10-Feb-12 LBP Inspection Negative 0 Lobby C Wall Wood Stain Intact
45 10-Feb-12 LBP Inspection Negative 0.02 Hallway C Door Metal Brown Intact
46 10-Feb-12 LBP Inspection Negative 0.04 Hallway C Door Metal Brown Intact
47 10-Feb-12 LBP Inspection Negative 0 Hallway c Door Frame Metal Brown Intact
48 10-Feb-12 LBP Inspection Negative 0.09 CDR Office A Vent Metal Cream Intact
49 10-Feb-12 LBP Inspection Positive 5 CDR Office A W i n d o w Frame Metal Cream Intact
50 10-Feb-12 LBP Inspection Negative 0 CDR Office D Wall Sheetrock White Intact
51 10-Feb-12 LBP Inspection Positive 1 Middle Hal lway A W i n d o w Frame Metal Brown Intact
52 10-Feb-12 LBP Inspection Negative 0.03 Hallway B Door Wood Stain Intact
53 10-Feb-12 LBP Inspection Negative 0.05 Hallway B Door Wood Stain Intact
54 10-Feb-12 LBP Inspection Negative 0 Office D Wall Sheetrock Cream Intact
55 10-Feb-12 LBP Inspection Negative 0 Exterior A Hand Rails Metal Brown Intact
56 10-Feb-12 LBP Inspection Negative 0 Exterior A Steps Concrete Brown Intact
57 10-Feb-12 LBP Inspection Positive 1 Exterior A W i n d o w Frame Metal Brown Intact
58 10-Feb-12 LBP Inspection Negative 0 Exterior D Foundation Concrete Lt Blue Intact
59 10-Feb-12 LBP Inspection Positive 1.14 Exterior C Gutter Metal Cream Intact
60 10-Feb-12 LBP Inspection Positive 1.95 Exterior A W i n d o w Frame Metal Cream Intact
61 10-Feb-12 LBP Inspection Negative 0.02 Exterior C Hand Rails Metal Brown Intact
62 10-Feb-12 LBP Inspection Positive 2.15 Exterior c Steps Concrete Yel low Intact
63 10-Feb-12 LBP Inspection Positive 0.98 Calibration
64 10-Feb-12 LBP Inspection Negative 0 Calibration
65 10-Feb-12 LBP Inspection Negative 0.31 Calibration
CEI Job No: 9609
Building 12011 Ft. Hood Page 2
A l l Exterior Gutters and Windows were Identified with Lead-Based Paints, Legand:
Surfaces Coated with Lead-Based Paint A l l Interior Cream, Brown, and Gray
Painted Surfaces were Identified with
Lead-Based Paints
| Technical Exhibit D - Hazmat Report - Asbestos |
| Technical Exhibit D - Hazmat Report Map |
| Technical Exhibit D - Hazmat - LBP survey |
File details come from the government source that posted it.