Technical_Exhibit_D_-_Hazmat_Report_Repair_Battalion_Headquarters_B12011.pdf

PDF 3 MB Posted

Attached to
Repair Battalion Headquarters Building 12011
Solicitation number
W91151-19-B-0008
Issued by

About this file

Technical Exhibit D - HAZMAT Report

View the file

Other files

File Type Posted
Bid_Abstract_4_19-B-0008_Repair_BN_HQ_B12011.pdf PDF
Bid_Abstract_19-B-0008_Repair_BN_HQ_B12011.pdf PDF
Bid_Abstract_3__19-B-0008_Repair_BN_HQ_B12011.pdf PDF
Bid_Opening_Sign-In_Roster_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Bid_Abstract_2__19-B-0008_Repair_BN_HQ_B12011.pdf PDF
Site_Visit_2__Sign_In_Roster_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Technical_Exhibit_H_-_Revised_Drawings_-_3_Repair_Battalion_Headquarters_B12011.pdf PDF
RFI_Responses_-3_Repair_Battalion_Headquarters_B12011.docx DOCX document
Attachment_2_-_Additional_Appendix_A_-_Repair_Battalion_Headquarters_B12011.pdf PDF
Amendment_05_19-B-0008_Renovate_Battalion_Headquarters_B12011.pdf PDF
AMENDMENT_04_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Project_Synopsis_Revised_19-B-0008_Repair_Battalion_Headquarters_B12011.doc DOC document
Technical_Exhibit_G_-_Revised_Drawings_-_2_Repair_Battalion_Headquarters_B12011.pdf PDF
Responses_to_RFIs_-_2_19-B-0008_Repair_Battalion_Headquarters_B12011.docx DOCX document
Amendment_03_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Amendment-02_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
19-B-0008_RFI_Responses_Repair_Battalion_Headquarters_B12011.docx DOCX document
Technical_Exhibit_E_-_Revised_Specifications_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Technical_Exhibit_F_-_Revised_Drawings_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Amendment_Solicitation_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Site_Visit_Sign_In_Roster_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Solicitation_19-B-0008_Repair_Battalion_Headquarters_B12011.pdf PDF
Attachment_1-Appendix_A_Repair_Battalion_Headquarters_B12011.pdf PDF
Technical_Exhibit_B_-_Drawings_Repair_Battalion_Headquarters_B12011.pdf PDF
Technical_Exhibit_A-Specifications_1-11-16_19-B-0008_Repair_BN_HQ_B12011.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS SURVEY REPORT

BUILDING 12011

FORT HOOD, TEXAS

Submitted to:

U.S. Army Corps of Engineers, Fort Worth District

For:

U.S. Army Corps of Engineers, Tulsa District

Prepared by:

Radian International LLC 8501 N. Mopac Blvd.

P.O. Box 201088 Austin, Texas 78720-1088

September 1997

Asbestos Survey, Fort Hood, Texas ii September 1997 Building 12011 f_12011.doc

Table of Contents

1.0 INTRODUCTION

1.1 Physical Inspections

1.2 Bulk Sampling and Analysis

1.3 Sample Numbering Scheme

2.0 FACILITY DESCRIPTION

3.0 DISCUSSION OF RESULTS

4.0 RISK ASSESSMENT

5.0 ABATEMENT COST ESTIMATES

APPENDIX A: HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS

FOR BUILDING 12011 SURVEY

APPENDIX B: BUILDING 12011 FLOOR PLAN

APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN

BUILDING 12011

APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING

12011

List of Figures

B-1 Building 12011 Floor Plan--First Floor ..................................................................... B-1 B-2 Building 12011 Roof Plan ......................................................................................... B-2

List of Tables

3-1 Summary of ACM and PACM in Building 12011 4-1 Priority Rating Table for Recommended Response Actions 4-2 Building 12011 Risk Assessment Results 5-1 Building 12011 Abatement and Replacement Cost Estimates 5-2 Building 12011 Repair Cost Estimates A-1 Building 12011 Homogeneous Areas ........................................................................ A-1 A-2 Building 12011 Asbestos Survey Analytical Results ................................................ A-2 B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 12011 ................... B-3 D-1 Damage/Risk Values for Inspection Observations .................................................... D-2 D-2 Exposure Values for Inspection Observations ........................................................... D-2 D-3 Summary of Damage/Risk Observations for ACM and PACM in Bldg. 12011 ................................................................................................................ D-3 D-4 Summary of Exposure Observations for ACM and PACM in Bldg. 12011 .............. D-3

Asbestos Survey, Fort Hood, Texas iii September 1997

List of Photographs (Appendix C)

Photo 12011-1-A: Building caulkings and putties; throughout building Photo 12011-1-B: Olive 9x9 floor tile Photo 12011-1-D: White 12x12 floor tile; stage area Photo 12011-1-K: Cementitious soffit panels; around building except in Classroom # 1

Asbestos Survey, Fort Hood, Texas iv September 1997

Acronyms and Abbreviations

ACM Asbestos-containing material Act. Actinolite Am. Amosite Anth. Anthophyllite Cell. Cellulose Chry. Chrysotile COR Contracting Officer’s Representative Croc. Crocidolite D Damage/risk factor DS Dispersion staining E Exposure factor EPA United States Environmental Protection Agency Fib. Fiberglass GRADE Air Force Guidance for Rating Damage and Exposure ID Identification LLC Limited liability company m Meter m2 Square meter M.W. Mineral wool N/A Not analyzed NA Not applicable ND Not detected O&M Operations and maintenance PACM Presumed asbestos-containing material PLM Polarized light microscopy QA Quality assurance QC Quality control R Risk rating RPD Relative percent difference SACM Suspect asbestos-containing material SWD Southwest Division (Laboratory) Syn. Synthetics T Total TDH Texas Department of Health Trem. Tremolite TSI Thermal systems insulation USACE United States Army Corps of Engineers

Asbestos Survey, Fort Hood, Texas September 1997

1.0 INTRODUCTION

Radian International LLC, under contract with the United States Army Corps of Engineers (USACE), Contract DACA56-94-D-0015, performed a facility-wide asbestos survey at Fort Hood, Texas, to meet the following project objectives:

Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-containing materials (SACM);

Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;

Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;

Identify and quantify material which is presumed to contain asbestos;

Conduct risk assessments for all asbestos-containing materials (ACM) and presumed

ACM (PACM);

Conduct air monitoring where necessary according to risk assessment models; and Prepare an Operations and Maintenance (O&M) program (under separate cover) for all

ACM and PACM.

The survey included base buildings and approximately 10% of the family housing buildings at Fort Hood. Mr. Emmet Gray, Directorate of Public Works, is the post contact for this project.

This report presents the findings from the asbestos survey at Building 12011.

1.1 Physical Inspections

Survey teams visually inspected the accessible areas of the interior and exterior of each building, including interior and exterior rooms, mechanical spaces, storage areas, crawl spaces, attics, and roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based on the visual inspection of the remainder of the building and interviews with the building occupants.

The following steps were taken to complete physical inspections.

1. Obtain a copy of the building floor plan.

2. Perform an initial building walk-through.

a) Note fire doors/walls on the floor plan.

b) Identify homogeneous areas.

c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.

d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and conditions present at the time of the survey.

e) Define the bulk sample locations.

1.2 Bulk Sampling and Analysis

Homogeneous materials were categorized by the survey teams as surfacing materials, thermal systems insulation (TSI), or miscellaneous materials. Building age, use, and size were taken into consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:

1. Mark sample locations on the floor plan using a unique identification number.

2. Record SACM sample information on a field data sheet, including:

a) Building number and room number/area description;

b) Typical occupancy and population;

c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);

d) Estimated quantity of SACM (i.e., area or length);

e) Friability;

f) Physical damage;

g) Potential for damage or disturbance during maintenance;

h) Potential cause of damage or disturbance; and

i) Unique sample identification number.

3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.

4. Repair any damage caused by sampling using sealants and methods approved by the Contracting Officer’s Representative (COR).

Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August 1996, point-counting was not performed. In order to meet quality assurance/quality control (QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ Lee Group laboratory. The third sample is the QA sample that was sent to the USACE Southwestern Division Laboratory (SWD) in Dallas, Texas.

1.3 Sample Numbering Scheme

Unique identification numbers were assigned to each sample using the following numbering scheme:

aaaaa-b-c-xd, where:

aaaaa identifies the five-digit building number;

b identifies the subdivision within that building;

c identifies the homogeneous area;

x identifies the sample type, where:

0 = normal sample 8 = field duplicate (QC sample) 9 = QA sample d identifies the sample number (1,2, or 3) [Note: “b-c” represents the unique homogeneous area identification (ID) for a particular building. When necessary, “e” is used by the laboratory to identify additional layers of material not separated in the field (e.g., tile and mastic associated with flooring materials)].

2.0 FACILITY DESCRIPTION

Building 12011, encompassing an area of 6136 sq ft, is a Battalion Headquarters Building built in 1966. A building floor plan is presented in Appendix B.

3.0 DISCUSSION OF RESULTS

Building 12011 was inspected during November 1996, and was reinspected during March 1997 for additional mastic samples. During these inspections, 12 homogeneous areas were identified and 33 normal samples were collected. Table 3-1 presents a summary of ACM and PACM identified during the survey of Building 12011. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 12011. Sample and photograph locations are presented in the Building 12011 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 12011.

Table 3-1 Summary of ACM and PACM in Building 120111

Homogeneous Area Area/Length Physical ACM

ID Description & Location Estimate Units Damage Friability Type 1-A Building caulkings and putties; throughout building

0.57 m2 None None PACM

1-B Olive 9x9 floor tile 530 m2 None None ACM 1-D White 12x12 floor tile; stage area 9.3 m2 None None ACM 1-K Cementitious soffit panels; around building except in Classroom # 1 20 m2 None None PACM2

1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.

2 This homogenous area was inaccessible to the inspection team.

m2 = Square meter

Homogeneous areas 1-A, 1-B, 1-D, and 1-K were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. Homogeneous area 1-K was inaccessible to the inspection team. Interior and incoming electrical wiring appeared to be non-ACM.

A field duplicate (QC) sample was collected at location 12011-1-H-01. The results of analysis for the QC sample indicated asbestos levels less than 1% (non-detect). These results are consistent with the normal sample, which also indicated that asbestos was not measured above 1 percent.

4.0 RISK ASSESSMENT

A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D) and exposure factors (E). These factors are summed and placed in the following equation:

R = 12.0324 - [(0.1683 x D) + (0.1693 x E)].

Table 4-1 was used to establish a priority rating for each homogeneous area, based on the risk rating or “R” value.

Table 4-1 Priority Rating Table for Recommended Response Actions

Risk Rating (R) Priority Recommended Response Action

R < 6 1 Immediate removal/repair 6 R < 8 2 Planned removal/repair; place in O&M program in interim 1

8 R < 10 3 Place in O&M program R 10 4 No action required; place in O&M program as a precaution

1 If material is repaired, it will remain in the O&M program until it is removed.

O&M = Operations and maintenance R = Risk Rating

Risk assessments for the homogeneous areas identified as ACM or PACM in Building 12011 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these factors is also provided in Appendix D. No air sampling was required in this building based on risk assessment models.

Table 4-2 Building 12011 Risk Assessment Results

Homogeneous Area ACM Risk

ID Description & Location Type Rating (R) Priority 1-A Building caulkings and putties; throughout building PACM 9.5 4a 1-B Olive 9x9 floor tile ACM 9.83 4a 1-D White 12x12 floor tile; stage area ACM 9.67 4a 1-K Cementitious soffit panels; around building except in

Classroom # 1 PACM 9.16 4a a Priority rating is 4 because material is not friable.

5.0 ABATEMENT COST ESTIMATES

Abatement cost estimates are based on professional experience and costs from 1996 Fort Hood asbestos abatement contracts. Cost estimates were developed using the unit costs for abatement of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.

Cost estimates were developed using the assumption that all materials within a building would be abated concurrently. In addition, costs are based on the assumption that all ACM and/or PACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM and/or PACM in Building 12011 are presented in Tables 5-1 and 5-2.

Table 5-1 Building 12011 Abatement and Replacement Cost Estimates

Homogeneous Area Area/Length Unit Cost for Total Cost

ID Description & Location Estimate Units Abatement ($) 1-A Building caulkings and putties; throughout building 0.57 m2 $107.60/m2 $61 1-B Olive 9x9 floor tile 530 m2 $18.83/m2 $9,980 1-D White 12x12 floor tile; stage area 9.3 m2 $18.83/m2 $175 1-K Cementitious soffit panels; around building except in

Classroom # 1 20 m2 $18.83/m2 $377

Subtotal $10,593 Design Fee (6%) $636 Air Monitoring Cost (10%) $1,059 Materials Replacement $14,194 Off-site Disposal Cost $1,119

TOTAL ESTIMATED ABATEMENT COST $27,601

Table 5-2 Building 12011 Repair Cost Estimates

Homogeneous Area

Approximate Damaged

Area/Length

Unit Cost for

Total Cost ID Description & Location Estimate Units Repair ($) 1-A Building caulkings and putties; throughout building 0.57 m2 $107.60/m2 $61 1-B Olive 9x9 floor tile 3 m2 $18.83/m2 $56 1-D White 12x12 floor tile; stage area 3 m2 $18.83/m2 $56 1-K Cementitious soffit panels; around building except in

Classroom # 1 3 m2 $18.83/m2 $56

Subtotal $229 Design Fee (6%) $14 Air Monitoring Cost (10%) $23 Materials Replacement $947 Off-site Disposal Cost $19

TOTAL ESTIMATED REPAIR COST $1232

APPENDIX A

HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS FOR

BUILDING 12011 SURVEY

A-1

Table A-1 Building 12011 Homogeneous Areas 1

Homogeneous Area ACM

ID Description & Location Type 2 1-A Building caulkings and putties; throughout building PACM 1-B Olive 9x9 floor tile ACM 1-C 2x2 fissured ceiling tile None 1-D White 12x12 floor tile; stage area ACM 1-E Baseboard glue; stage area None 1-F Wallboard ceiling tile None 1-G Stairstep glue; stage area None 1-H Wainscoat glue; throughout building, except Classroom #2 None 1-I Black 9x9 floor tile; patch tile in various locations None 1-K Cementitious soffit panels; around building except in Classroom # 1 PACM R-A Built-up roofing materials None R-B Roof penetration mastics None

1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and ACM are shown in Appendix C.

2 ACM types include:

ACM = Materials containing >1% asbestos;

None = Materials containing 1% asbestos; and PACM = Materials presumed to contain >1% asbestos.

ACM = Asbestos-containing material ID = Identification PACM = Presumed asbestos-containing material

Table A-2 Building 12011 Asbestos Survey Analytical Results1

Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)

Area

ID

Sample ID

Layer

Layer Description (from Laboratory)

Total

Act

Am

Anth

Chry

Croc

Trem

Cell

Fib

M.W.

Synth

ACM

Type

1-B 12011-1-B-01 NA Gray Floor Tile 10.00 ND ND ND 10 ND ND ND ND ND ND ACM 12011-1-B-02 a Gray Floor Tile 10.00 ND ND ND 10 ND ND ND ND ND ND ACM 12011-1-B-02 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM 12011-1-B-02 NA Total 9.9 ACM 12011-1-B-03 a Gray Floor Tile 10.00 ND ND ND 10 ND ND ND ND ND ND ACM 12011-1-B-03 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM 12011-1-B-03 NA Total 9.9 ACM

1-C 12011-1-C-01 NA Wht Ceil Tile/Wht Paint ND ND ND ND ND ND ND 50 ND 30 ND None 12011-1-C-02 NA Wht Ceiling Tile/Wht Paint ND ND ND ND ND ND ND 50 ND 30 ND None 12011-1-C-03 NA Wht Ceil Tile/Wht Paint ND ND ND ND ND ND ND 50 ND 30 ND None

1-D 12011-1-D-01 a Wht Floor Tile ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-01 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM 12011-1-D-01 NA Total 0.1 None 12011-1-D-02 a Wht Floor Tile ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-02 b Blk Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-02 NA Total ND None 12011-1-D-03 a Wht Floor Tile ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-03 b Blk Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-D-03 NA Total ND None

1-E 12011-1-E-01 NA Wht Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None 12011-1-E-02 NA Wht Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None 12011-1-E-03 NA Wht Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None

1-F 12011-1-F-01 a Wht Paint/Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None 12011-1-F-01 b Wht Drywall ND ND ND ND ND ND ND 3 ND ND ND None 12011-1-F-01 NA Total ND None 12011-1-F-02 a Wht Paint/Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None 12011-1-F-02 b Wht Drywall ND ND ND ND ND ND ND 3 ND ND ND None 12011-1-F-02 NA Total ND None 12011-1-F-03 a Wht Paint/Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None 12011-1-F-03 b Wht Drywall ND ND ND ND ND ND ND 3 ND ND ND None 12011-1-F-03 NA Total ND None

1-G 12011-1-G-01 NA Blk Mat'l ND ND ND ND ND ND ND ND ND ND 1 None 12011-1-G-02 NA Blk Mat'l ND ND ND ND ND ND ND ND ND ND 1 None 12011-1-G-03 NA Blk Mat'l ND ND ND ND ND ND ND ND ND ND 1 None

Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)

ID

Sample ID

Layer

Layer Description (from Laboratory)

Total

Act

Am

Anth

Chry

Croc

Trem

Cell

Fib

M.W.

Synth

ACM

Type

1-H 12011-1-H-01 NA Lt Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-H-02 NA Lt Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None 12011-1-H-03 NA Lt Tan Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None 12011-1-H-81 NA Lt Tan Mastic/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None

1-I2 12011-1-I-01 NA Blk Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None 12011-1-I-02 NA Blk Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None 12011-1-I-03 NA Blk Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None 12011-1-I-04 NA Blk Floor Tile ND ND ND ND ND ND ND 1 ND ND ND None 12011-1-I-05 NA Blk Floor Tile ND ND ND ND ND ND ND 1 ND ND ND None 12011-1-I-06 NA Blk Floor Tile ND ND ND ND ND ND ND 1 ND ND ND None

R-A 12011-R-A-01 a Blk Roofing/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-A-01 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-A-01 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-A-01 NA Total ND None 12011-R-A-02 a Blk Roof /Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-A-02 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-A-02 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-A-02 NA Total ND None 12011-R-A-03 a Blk Roof/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-A-03 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-A-03 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-A-03 NA Total ND None

R-B 12011-R-B-01 a Blk Roof/Wht Ganules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-B-01 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-B-01 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-B-01 NA Total ND None 12011-R-B-02 a Blk Roof/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-B-02 b Blk Tar ND ND ND ND ND ND ND ND 10 ND ND None 12011-R-B-02 c Tan Fibrous Mat'l ND ND ND ND ND ND ND 75 ND ND ND None 12011-R-B-02 NA Total ND None 12011-R-B-03 a Blk Roof/Wht Granules ND ND ND ND ND ND ND ND ND ND 10 None 12011-R-B-03 b Blk Tar ND ND ND ND ND ND ND 5 5 ND ND None 12011-R-B-03 NA Total ND None

1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, than that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.

2 No mastic layer was found to be associated with homogeneous area 1-I during resampling.

ACM = Asbestos-containing material Act. = Actinolite Am. = Amosite Anth. = Anthophyllite Cell. = Cellulose Chry. = Chrysotile Croc. = Crocidolite Fib. = Fiberglass ID = Identification M.W. = Mineral wool NA = Not applicable (sample contained single layer) ND = Not detected (<1% asbestos) Synth. = Synthetics T = Total Trem. = Tremolite

APPENDIX B

BUILDING 12011 FLOOR PLAN

Asbestos Survey, Fort Hood, Texas B-3 September 1997

Table B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 12011

Building and Analytical Laboratory Building Inspector/Risk Assessor Date Homogeneous

Area ID1

Name

TDH

License # License

Exp. Date

Name

TDH

License # License

Exp. Date Inspected/ Sampled

12011-1-A NA NA NA Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-B RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-C RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-D RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-E RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-F RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-G RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-H RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-1-I

RJ Lee Group 30-0051 02/26/98 Mike Sabisch

Dave Stoetzel 60-1099 60-1100

10/15/97 10/15/97

11/27/96 3/17/97

12011-1-K NA NA NA Mike Sabisch 60-1099 10/15/97 11/27/96 12011-R-A RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96 12011-R-B RJ Lee Group 30-0051 02/26/98 Mike Sabisch 60-1099 10/15/97 11/27/96

1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:

aaaaa-b-c-xd, where:

aaaaa identifies the five-digit building number;

b identifies the subdivision within that building;

c identifies the homogeneous area;

x identifies the sample type, where:

0 = normal bulk material sample 6 = normal personnel air monitoring sample 7 = normal environmental air monitoring sample 8 = field duplicate bulk material (QC sample) 9 = QA bulk material sample d identifies the sample number (1, 2, or 3);

[Note: “b-c” represents the unique homogeneous area ID for a particular building.]

ACM = Asbestos-containing material ID = Identification NA = Not applicable. (PACM was not sampled.)

PACM = Presumed asbestos-containing material QA = Quality assurance QC = Quality control TDH = Texas Department of Health

APPENDIX C

REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN BUILDING

12011

APPENDIX D

RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 12011

Asbestos Survey, Fort Hood, Texas D-1 September 1997

Appendix D Risk Assessment Methodology and Data

A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guideline for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D), and exposure factors (E). These factors are summed and used in the following equation:

R = 12.0324 - [(0.1683 x D) + (0.1693 x E)];

Where D = the sum of the values for the following damage/risk observations:

Material type Potential for contact Physical damage Water damage Potential for damage by repair/maintenance activities Asbestos content;

And E = the sum of the values for the following exposure observations:

Area of damaged material Material friability Population Activity/vibration Ventilation Air movement Floors Walls Barriers

A further breakdown of the values for the subunits under each category is provided in Tables D-1 and D-2. Summaries of the inspection observations for damage/risk and exposure for the ACM and PACM in Building 12011 are presented in Tables D-3 and D-4.

Table D-1 Damage/Risk Values for Inspection Observations 1

Material Type

Potential for Contact Physical Damage

Water Damage

Potential for Damage by Repair/Maintenance Activities

Asbestos Content

Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) >1-30% (1) TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)

TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5) Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)

Misc., Undamaged (0) >10 ft, Medium (3) High (5) >10 ft, High (5)

1 The value assigned to each category is shown in italics.

TSI = Thermal systems insulation

Table D-2

Exposure Values for Inspection Observations 1

Area of Damaged Material (m or m2)

Friability

Population

Activity/ Vibration

Interior Ventilation

Air Movement

Floors

Walls

Barriers <3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Smooth (1) Permanent (1)

3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2) 31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3) >300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)

501-1,000 (4) >1,000 (5)

1 The value assigned to each category is shown in italics.

Table D-3 Summary of Damage/Risk Observations for ACM and PACM in Building 12011

Material Type Potential for

Contact

Physical Damage Water

Damage Potential for Damage by

Repair/Maintenance Activities Asbestos Content

12011-1-A Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1) 12011-1-B Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1) 12011-1-D Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1) 12011-1-K Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)

Table D-4

Summary of Exposure Observations for ACM and PACM in Building 12011

Area of Damaged

(m or m2)

Friability

Population

Activity

Ventilation

Air Movement

Floors

Walls

Barriers 12011-1-A < 3 (0) None (0) 10-200 (2) Low (0) None (0) Perceptible (2) Smooth (1) Pitted (3) None (4) 12011-1-B < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Pitted (3) None (4) 12011-1-D < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Rough (4) None (4) 12011-1-K < 3 (0) None (0) 10-200 (2) Low (0) None (0) Perceptible (2) Rough, Seamed (2) Rough (4) None (4)

Legend

Suspect Asbestos-Containing Material Sample Location and ID

Building 12011 - 1st Floor

12011-1-A-01

Photograph Location and ID12011-1-A 2

Sample results and homogeneous area descriptions are presented in Appendix A.

Photographs are presented in Appendix C

Table B-1 contains license information and the sample numbering scheme.

Scale: Feet

0 168 24 32

Figure B-1, Building 12011 Floor Plan--First Floor

B u i l d i n g

A s b e s t o s

S u r v e y

F r t

H o d

T e x a s d d o c

S e p t e m b e r

B

12011-1-C-03

12011-1-I

12011-1-K

12011-1-F-03

12011-1-F-02

12011-1-F-01

12011-1-C-01

12011-1-C-02

12011-1-F

12011-1-D

12011-1-E-03

12011-1-B-01 12011-1-D-01

12011-1-E

12011-1-D-02

12011-1-G

12011-1-E-02

12011-1-D-03

12011-1-E-01

12011-1-I-02

12011-1-I-01

12011-1-I-03

12011-1-G-01

12011-1-G-02

12011-1-G-03

12011-1-B-02

12011-1-C

12011-1-B

12011-1-B-03

12011-1-H-01

12011-1-H

12011-1-H-02

12011-1-H-03

12011-1-A

Clean Environments, inc.

Industrial Hygiene & Environmental Consultants

February 13, 2012

DPW

Engineering Division Fort Hood Army Base Fort Hood, Texas

R E : Lead-Based Paint Hazard Survey Building 12011-Interior & Exterior Painted Surfaces Fort Hood Army Base Fort Hood, Texas C E I Project Number: 9609

Clean Environments, Inc. conducted a lead-based paint survey on the interior surfaces of the referenced building, February 10, 2012. The survey was conducted by Mr. Ray Keeble, DSHS Certification JVs 206-0816 of Clean Environments, Inc., Lead Firm, DSHS Certification Ne 211-0096.

Lead samples were collected according to the sampling protocol stipulated in DSHS, Texas Environmental Lead Reduction Rules, and Department of Housing and Urban Development (HUD), Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing ("HUD Guidelines").

LEAD-BASED PAINT BACKGROUND

A lead-based paint hazard is a condition in which exposure to lead from lead-contaminated dust, lead-contaminated soil, or deteriorated lead-based paint would have an adverse effect on human health (as established by the U.S. Environmental Protection Agency (EPA) Administrator under Title IV of the Toxic Substances Control Act).

Lead-basedpaint is described as any paint, varnish, shellac, or other surface coating that contains lead equal to or greater than 1.0 milligram per centimeter squared (mg/cm2) as measured by XRF or laboratory analysis, or 0.5percent by weight [5,000 microgram per gram (pg/g), 5,000parts per million (ppm), or 5,000 milligram per kilogram (mg/kg)] as measured by laboratory analysis.

The common route of exposure to lead in paint is the ingestion of lead-bearing dust that is generated by the paint when it deteriorates, chalks, or is disturbed through demolition or renovation or even abrasion from the opening and closing of windows.

622 Isom, Suite 110 • San Antonio, Texas 78216 • 210/349-7242 • Fax 210/349-1132

C L E A N E N V I R O N M E N T S , Inc .

L B P S u r v e y

Building 12011 Fort Hood, Texas P a g e 2

The severity of the health effects of lead contamination problems is only now being fully realized.

Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Children are especially vulnerable and susceptible to lead poisoning. Even low levels, persisting during childhood, are known to slow a child's normal development and cause learning and behavioral problems. The ASTDR and numerous other investigative agencies report long-lasting impacts on intelligence, motor control, hearing, and emotional development of children who have levels of lead in the body that are not associated with obvious symptoms.

Once in the body, from ingestion or inhalation, lead is distributed via the bloodstream to red blood cells, soft tissue, and bone. Lead in the body is eliminated very slowly by the kidneys and gastrointestinal tract; much smaller amounts are lost through perspiration. Lead serves no useful purpose in the body. It is a poison which binds with the chemicals that aid biological reactions throughout the body, particularly in the blood-forming system, the brain and nerves, and the kidneys, interfering with the synthesis of many body chemicals. The resulting damage from lead poisoning may be permanent, and in some cases fatal.

Chronic lead poisoning may result after lead has accumulated in the body over time, mostly in the bone. Long after exposure has ceased, some physiological event such as illness or pregnancy may release this stored lead form the bone and produce adverse health effects such as impaired hemoglobin synthesis, alteration in the central and peripheral nervous systems, hypertension, effects on the male and female reproduction systems, and damage to the developing fetus (lead freely crosses the placenta).

Exposure to lead is characterized either by the concentration of lead in the material (air water, food, dust, soil, or paint) to which people are exposed in the environment, or by the concentration of lead in whole blood, usually expressed in micrograms of lead per deciliter of blood (u.g/dl). The present level of concern for children is blood lead levels of 10 ug/dl. The Center for Disease Control (CDC) has a multi-tier prevention system to prevent this level of lead in children.

The Texas Department of Health, Texas Environmental Lead Reduction Rules, May 1998 does not require that the lead-based paint be abated from commercial or industrial buildings because such buildings are not considered target housing (pre-1978 with children 0 to 6 years old). However, 29 CFR 1926.62, Lead Exposure in Construction Final Rule (OSHA regulations), and the Texas Administrative Code (TAC) rules for waste classification and disposal, do apply. TAC 335.504, The Procedure for Hazardous Waste Determination, identifies lead waste in four classes — Hazardous, Class I , Class 2, and Class 3. This TAC section refers to 40 CFR 261 Subpart C defining "Characteristics of Hazardous Waste" and Subpart D listing hazardous wastes. TAC 335.505, .506, .507, define waste determination of Class 1, 2, 3 waste respectively.

C L E A N E N V I R O N M E N T S , Inc .

L B P S u r v e y

Building 12011 Fort Hood, Texas P a g e 3

The renovation/remodeling Contractor must be notified of the presence of lead-based paint in commercial or industrial buildings in order to adequately protect workers. Worker protection, to include medical surveillance and EPA training, is a Contractor, not Building Owner, responsibility.

The Building Owner, however, is responsible for waste stream determinations and disposal of the lead-based paint wastes. It is suggested that the lead-based painted substrates or scrapped paint chips be separated from other construction debris and a Toxicity Leaching Probability Characteristic (TCLP) laboratory procedure be performed on the lead-based paint waste to determine proper disposal.

Al l debris must be disposed in accordance with the requirements of 40 CFR 260,261,262,264,268.

Al l debris that is classified as hazardous, must be transported in accordance with 40 CFR 263. The Landfill must be registered/licensed with the State or EPA to accept lead hazardous wastes, as well as the transporters.

FINDINGS

The above referenced building is scheduled for renovation/demolition. Al l interior & exterior painted surfaces were tested for lead based paint (LBP).

The Innovx Spectrum Analyzer was used to collect XRF assays from components in the specified areas of the building. Positive results were noted at reading of 1.0 mg/cm2. Negative results were noted at readings of less than 1.0 mg/cm2. Inconclusive results were noted i f the numerical results that followed the greater than symbol were less than 1.0 mg/cm2. No inconclusive results were then resolved through K shell analysis.

The following areas tested positive for lead-based paint.

Area Substrate Color Condition

Interior Walls Heaters Columns

Cream Intact

Interior Door Door Frames Window Frames

Brown Intact

Interior Columns Gray Intact

Interior Heaters White Intact

Exterior Window Frames Brown Intact

Exterior Window Frame Gutters

Cream Intact

Exterior Steps Yellow Intact

AH other paints tested negative for Lead.

It has been a pleasure to work with you on this project. We look forward to being of continued service to you. The XRF data will follow shortly.

Very, ffjuly yours, Ray Keeble Lead Project Designer DSHS License JV° 209-0069

Attachement: XRF Results

XRF RESULTS

XRF Results Reading Date Mode Pass/Fai l Pb Room Side Component Substrate Color Conditio

1 10-Feb-12 Standardization PASS

2 10-Feb-12 LBP Inspection Positive 1.03 Calibration

3 10-Feb-12 LBP Inspection Negative 0 Calibration

4 10-Feb-12 LBP Inspection Negative 0.29 Calibration

5 10-Feb-12 LBP Inspection Positive 3.89 East Room B Wall Concrete Cream Intact

6 10-Feb-12 LBP Inspection Positive 3.07 East Room B Wall Concrete Cream Intact

7 10-Feb-12 LBP Inspection Negative 0.08 East Room C Wall Sheetrock Cream Intact

8 10-Feb-12 LBP Inspection Positive 5 East Room C Wall Sheetrock Cream Intact

9 10-Feb-12 LBP Inspection Negative 0.06 East Room c Vent Metal Black Intact

10 10-Feb-12 LBP Inspection Negative 0.31 East Room c Stairs Metal Black Intact

11 10-Feb-12 LBP Inspection Negative 0.03 East Room c Door Wood Stain Intact

12 10-Feb-12 LBP Inspection Positive 5 East Room c Heater Metal Cream Intact

13 10-Feb-12 LBP Inspection Negative 0.07 East Room c Heater Metal Cream Intact

14 10-Feb-12 LBP Inspection Positive 1 East Room c Heater Metal Cream Intact

15 10-Feb-12 LBP Inspection Positive 5 East Room D Wall Concrete Cream Intact

16 10-Feb-12 LBP Inspection Negative 0 East Room D Door Metal Cream Intact

17 10-Feb-12 LBP Inspection Negative 0 East Room A Wall Sheetrock Cream Intact

18 10-Feb-12 LBP Inspection Negative 0.04 East Room A Wall Sheetrock Cream Intact

19 10-Feb-12 LBP Inspection Negative 0 East Room A Column Metal White Intact

20 10-Feb-12 LBP Inspection Positive 1 S I B Door Frame Metal Brown Intact

21 10-Feb-12 LBP Inspection Negative 0 S I B Door Wood Brown Intact

22 10-Feb-12 LBP Inspection Negative 0 S I C Wall Sheetrock Gray Intact

23 10-Feb-12 LBP Inspection Negative 0 S I B Wall Sheetrock Gray Intact

24 10-Feb-12 LBP Inspection Negative 0 S I C Wall Trim Wood White Intact

25 10-Feb-12 LBP Inspection Negative 0.08 S I c Wall Trim Wood White Intact

26 10-Feb-12 LBP Inspection Positive 5 S I D Column Metal Gray Intact

27 10-Feb-12 LBP Inspection Positive 5 S I D Door Metal Brown Intact

28 10-Feb-12 LBP Inspection Negative 0.09 S I D Door Frame Metal Brown Intact

29 10-Feb-12 LBP Inspection Negative 0.03 S I A Wall Concrete Gray Intact

30 10-Feb-12 LBP Inspection Positive 5 S I B Column Metal Gray Intact

31 10-Feb-12 LBP Inspection Negative 0 Lobby B Wall Concrete White Intact

32 10-Feb-12 LBP Inspection Negative 0 Lobby D Wall Concrete White Intact

33 10-Feb-12 LBP Inspection Negative 0 Lobby A Wall Concrete White Intact

CEI Job No: 9609

Building 12011 Ft. Hood Page 1

XRF Results Reading Date Mode Pass/Fai l Pb Room Side Component Substrate Color Condition

34 10-Feb-12 LBP Inspection Positive 5 Lobby B Heater Metal White Intact

35 10-Feb-12 LBP Inspection Negative 0.27 Office D Wall Concrete Yellow Intact

36 10-Feb-12 LBP Inspection Positive 5 Office A Column Metal Cream Intact

37 10-Feb-12 LBP Inspection Negative 0.02 Office D Wall Concrete Cream Intact

38 10-Feb-12 LBP Inspection Negative 0.02 Office B Wall Concrete Cream Intact

39 10-Feb-12 LBP Inspection Positive 3.28 Office A Door Metal Brown Intact

40 10-Feb-12 LBP Inspection Negative 0.26 Office A Door Frame Metal Brown Intact

41 10-Feb-12 LBP Inspection Negative 0.55 Office A Door Frame Metal Brown Intact

42 10-Feb-12 LBP Inspection Positive 5 Office A Column Metal Cream Intact

43 10-Feb-12 LBP Inspection Positive 2.04 Restroom B Door Frame Metal Brown Intact

44 10-Feb-12 LBP Inspection Negative 0 Lobby C Wall Wood Stain Intact

45 10-Feb-12 LBP Inspection Negative 0.02 Hallway C Door Metal Brown Intact

46 10-Feb-12 LBP Inspection Negative 0.04 Hallway C Door Metal Brown Intact

47 10-Feb-12 LBP Inspection Negative 0 Hallway c Door Frame Metal Brown Intact

48 10-Feb-12 LBP Inspection Negative 0.09 CDR Office A Vent Metal Cream Intact

49 10-Feb-12 LBP Inspection Positive 5 CDR Office A W i n d o w Frame Metal Cream Intact

50 10-Feb-12 LBP Inspection Negative 0 CDR Office D Wall Sheetrock White Intact

51 10-Feb-12 LBP Inspection Positive 1 Middle Hal lway A W i n d o w Frame Metal Brown Intact

52 10-Feb-12 LBP Inspection Negative 0.03 Hallway B Door Wood Stain Intact

53 10-Feb-12 LBP Inspection Negative 0.05 Hallway B Door Wood Stain Intact

54 10-Feb-12 LBP Inspection Negative 0 Office D Wall Sheetrock Cream Intact

55 10-Feb-12 LBP Inspection Negative 0 Exterior A Hand Rails Metal Brown Intact

56 10-Feb-12 LBP Inspection Negative 0 Exterior A Steps Concrete Brown Intact

57 10-Feb-12 LBP Inspection Positive 1 Exterior A W i n d o w Frame Metal Brown Intact

58 10-Feb-12 LBP Inspection Negative 0 Exterior D Foundation Concrete Lt Blue Intact

59 10-Feb-12 LBP Inspection Positive 1.14 Exterior C Gutter Metal Cream Intact

60 10-Feb-12 LBP Inspection Positive 1.95 Exterior A W i n d o w Frame Metal Cream Intact

61 10-Feb-12 LBP Inspection Negative 0.02 Exterior C Hand Rails Metal Brown Intact

62 10-Feb-12 LBP Inspection Positive 2.15 Exterior c Steps Concrete Yel low Intact

63 10-Feb-12 LBP Inspection Positive 0.98 Calibration

64 10-Feb-12 LBP Inspection Negative 0 Calibration

65 10-Feb-12 LBP Inspection Negative 0.31 Calibration

CEI Job No: 9609

Building 12011 Ft. Hood Page 2

A l l Exterior Gutters and Windows were Identified with Lead-Based Paints, Legand:

Surfaces Coated with Lead-Based Paint A l l Interior Cream, Brown, and Gray

Painted Surfaces were Identified with

Lead-Based Paints

Technical Exhibit D - Hazmat Report - Asbestos
Technical Exhibit D - Hazmat Report Map
Technical Exhibit D - Hazmat - LBP survey

File details come from the government source that posted it.