Project_Synopsis_Revised_19-B-0008_Repair_Battalion_Headquarters_B12011.doc
DOC document 46 KB Posted
- Attached to
- Repair Battalion Headquarters Building 12011
- Solicitation number
- W91151-19-B-0008
About this file
Revised Scope of Work
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SYNOPSIS
Repair Battalion Headquarters Building 12011
Project No. AD015161P
DESCRIPTION OF WORK:
The work shall be located at Building 12011, located at the intersection of Battalion Ave. and 33rd St., Fort Hood Texas. The exact location will be shown by the Contracting Officer. Building(s) will not be occupied during performance of work under this Contract.
The purpose of this project is to repair the Battalion Headquarters, Building 12011 which includes, but is not limited to the remediation of all hazmat, movement of walls, reconfiguration of latrines to meet code requirements, installation of new finishes following abatement, replacement of windows and all glazing wall systems, roof replacement, and the reconfiguration of all infrastructure systems (electrical, plumbing, HVAC, mass notification, and communications). Also included is miscellaneous site work to support the facility and meet code requirements.
The following drawings are included as part of the Solicitation.
FULL DRAWING SET
After award, one set of Adobe PDF contract drawings and PDF specifications, and one set of MicroStation format drawings (if available) will be furnished to the Contractor on CD. Reference publications will not be furnished. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.
A project construction sign will not be required for this project.
PERFORMANCE PERIOD: Barring any contingencies that arise during construction, the Government requires this project be completed within 240 calendar days. Completion is defined as completion of all contractual obligations.
*******END OF SCOPE OF WORK********
PAGE
File details come from the government source that posted it.