RTS _FY24-27_Mission Schedule and Summary.pptx
PPTX presentation 359 KB Posted
- Attached to
- Amendment 0003 to Meteorological Support Services - Reagan Test Site: Formal Request for Proposals (RFP) Federal contract opportunity
- Solicitation number
- W9113M-24-R-0061
About this file
This solicitation seeks proposals for meteorological support services at the Reagan Test Site. The selected contractor shall provide all necessary personnel, equipment, facilities and other resources to perform the required functions outlined in the Performance Work Statement, including mission support, local community meteorological support, operation and maintenance of meteorological equipment and instrumentation, inspection and maintenance, and management. The contractor shall not perform inherently governmental functions. The government will provide government property, facilities, equipment, materials and services as specified. The contractor must perform to standards defined in the contract to be awarded by the Department of the Army Materiel Command Contracting Command located at Redstone Arsenal.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RTS Mission Forecast (FY24-27)
GT248
GT249 / FTU 4
GT250
GT 251
FTX-40
Updated 11/13/2023
ARRW
ATF-3
SIP
EBUCS
NASA SEED
VOODOO
FTX-44
FTT-26
FTG-12
CUI
CUI
GT 252
GT 253
Worthy OCCM
MK21A-2
Canary
Sentinel FT-01
Sentinel FT-02
GT254
GT255
GT256
KDC
FTX-23
ATF-4
Starship 2
Incoming
Launch Intercept
Other Green Fill = Worthy
TBD
Orange Fill = PCRSS Blue Fill = HMCC Only Legend – RTS Perspective
FEM-02
Sentinel FT-03
FTM-37
PD-24
9Lives FTX-26a
SIP 24-1
GT257
GT258
GT259
FTM-41
FTG-16
FTG-17
FTM-42
FTX-28 E2
FTM-30
FTM-40
FTM-43
Optics Upgrade II
Technical Center - Reagan Test Site
RTS Operating Environment / Missions FY25 Mission Events ICBM Glory Trip (GT) missions: 3 Planned GBSD Sentinel: 2 Planned MDA missions: 6 planned (FTM-37, FEM-02, FTX-40, FTX-44, FTM-30, and FTX-26a), Meck upgrades for future missions Navy: Trident planning DOD: Banshee planned NASA Ionosphere Study Continuation Commercial Space: SpaceX Starship Orbital Demo
EBUCS, SIP, KDC
24/7 Space Surveillance Support to USSTRATCOM FY24 Mission Events ICBM Glory Trip (GT) missions: GT 248, GT 249, and GT 250 Planning for Sentinel Flight Test 1 (Ground Based Strategic Deterrent (GBSD)) MDA missions: FTG-12, FTX-23, FTT-25 Hypersonics: ARRW Flight Test ATF-3 & 4 Minotaur IV, Mk21A DOD: Voodoo
NASA SEED
Commercial Space: SpaceX USSF-44 TM collect, Starship Orbital Demo EBUCS, SIP, KDC (multiple campaigns) 24/7 Space Surveillance Support to USSTRATCOM
CUI
CUI
Technical Center - Reagan Test Site Microsoft_Excel_Worksheet.xlsx Sheet1
Type FY24 FY25 FY26 FY27
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
ICBM
Missile Defense
Hyper- Sonics
Other image9.emf image1.jpg image2.png image3.png image4.png image5.png
File details come from the government source that posted it. Updated .