Attachment 02_MSS-PRS_FINAL.pdf
PDF 136 KB Posted
- Attached to
- Amendment 0003 to Meteorological Support Services - Reagan Test Site: Formal Request for Proposals (RFP) Federal contract opportunity
- Solicitation number
- W9113M-24-R-0061
About this file
This document outlines the performance requirements summary for meteorological support services at the Reagan Test Site. Key details include the following. The contractor must complete mission planning documents with zero defects within 30 days of request, provide cost estimates within 15 days with actual costs within 20% of estimates. Forecasting and observations are required to be current and accurate with limited allowed deviations. The contractor must maintain at least 95% operational availability and 100% during missions. A four-year improvement and modernization plan is required with zero defects after review along with development of engineering change proposals and systems engineering support. Reports are due on time with 95% compliance to requirements.
The related federal contract opportunity is a solicitation from the Department of the Army to provide the meteorological support services outlined in the performance requirements summary document.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RTS MSS
Performance Requirement Summary
Attachment 02
Solicitation W9113M24R0061
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND FER 3.104
The Performance Requirements Summary (PRS) identifies both the performance objectives and the performance threshold required for each performance objective. The Government reserves the right to review all services called for in the contract to determine whether the performance objectives and goals were met. The absence of any contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract, including the clauses entitled “Inspection of Services” (FAR Clause 52.246-4) (or 52-246-5 – 52.246-9 as applicable) and “Default” (FAR Clause 52.249-8) (or 52.249-9 as applicable). The performance of the service will be evaluated to determine whether it meets the performance threshold. The Contractor shall provide the COR written response as to why the performance threshold was not met, how performance will be returned to acceptable levels, and how the recurrence of the cause will be prevented in the future.
Performance Requirement
PWS
Paragraph
Performance Standard
Maximum Allowable Deviation
Surveillance Method
Mission Planning 2.1.2
2.1.3
2.1.4 a.) Complete, comprehensive, accurate, address all customer requirements submission of UDS documentation no later than 30 days from date of receipt of request.
b.) Complete and accurate cost estimates received no later than 15 calendar days from date of receipt of request.
a.) Zero omissions and defects per mission; submission within 30 days.
b.) Zero omissions and defects for receipt of cost estimate and actual costs no greater than
20% of approved cost estimate.
100% Inspection
Mission Execution 2.1.6 a.) Successfully meet all mission requirements with plan proposed in contractor-submitted UDS documentation.
a.) Zero defects. 100% Inspection
Post-Mission
Documentation
2.1.7 a.) Complete, accurate and timely submission of post-mission data requirements IAW UDS specifications.
a.) Zero defects. 100% Inspection
Scientific Community
Support Cost Estimates
2.1.1
2.1.3 a.) Successfully meet all customer requests from the
Scientific Community as defined by the KO.
b.) Complete and accurate cost estimates received no later than 15 calendar days from date of receipt of request. Contractor can expect to Scientific Cost
Estimate requests per year.
a.) Zero data omissions and defects per request after initial submittal is reviewed;
submission within 7 days of planned date.
b.) Zero omissions and defects for receipt of cost estimate and actual costs no greater than 20% of approved cost estimate.
Random Sampling
Performance Requirement
PWS
Paragraph
Performance Standard
Maximum Allowable Deviation
Surveillance Method
Forecasting/Observations 2.1.6
2.2.1 a.) Provide current and accurate forecasts/observations to include temperature, winds, precipitation, precipitation probability, cloud coverage, lagoon and open-ocean wave heights, and other data as required by RTS.
b.) Timely issuance of severe weather warnings.
c.) Hourly synoptic observations and daily
Radiosonde observation.
a.) Three late observation submission per month.
b.) Zero defects.
c.) No more than 5% failure to collect for synoptic and Radiosonde observations.
Aviation/Marine 2.2.1
2.2.2 a.) Provide current and accurate forecasts/observations to include temperature, winds, precipitation, precipitation probability, cloud coverage, lagoon and open-ocean wave heights, and other data as required by Aviation/Marine
Department.
b.) Timely issuance of severe weather warnings.
a.) Three late observation submission per month.
b.) Zero defects submitted
Media (website, TV, etc.) 2.2.3
2.2.4
2.2.5 a.) Website- Maintain RTS weather website.
b.) TV- Provide current and near term forecast information, near real-time display of precipitation from KPOL, tide predictions, sunrise/sunset and moonrise/moonset information.
c.) Orientation- Provide input to on-island orientation briefs.
a.) Website down no more than 72 hrs. during a 30-day period.
b.) Data provided for broadcast available no less than 90% per month.
c.) Zero defects (unless mission-related and approved by COR).
Operations & Maintenance
Reliability
2.3.1
2.3.2 a.) Develop and implement a reliability program, as well as collect and submit operational availability data.
a.) Availability-- No less than 95% availability (based upon 6-month rolling average) during non-mission status; 100% availability during mission execution.
Non-mission status: Random
Sampling
Mission Execution: 100%
Inspection
Improvement &
Modernization
2.4.1
2.4.2 a.) Submit initial 4-year I&M plan, and participate in yearly plan review with Government POCs.
b.) Develop and submit ECP, as coordinated through
COR.
c.) Provide systems engineering support for I&M projects.
a.) Zero defects and omissions after initial government review; initial review within 15 days of request; and final submitted within 15 days of receipt of government review comments b.) Zero defects and omission after initial government review; initial review within 30 days of request; and final submitted within 30 days of receipt of government review comments c.) No greater than 30% schedule slippage from proposed milestone schedule and actual costs no greater than 20% of approved cost
100% Inspection
Reporting Requirements 3.2.1
3.2.2 a.) Required reports are submitted error-free and on-time.
a.) 95% compliance with CDRL direction. Random Sampling
File details come from the government source that posted it. Updated .